BRW ARCHITECTS FIRE BRW ARCHITECTS TEAM OF FIRE DESIGN SPECIALISTS ARE DEDICATED TO DESIGNING FACILITIES THAT POSITIVELY IMPACT OUR CLIENTS AND THEIR COMMUNITIES WE DESIGN FOR YOU OUR FIRE DESIGN PROCESS STEMS FROM OVER 30 YEARS OF HISTORY AND EXPERIENCE
DALLAS FIRE STATION 10 DALLAS, TEXAS 12,000 SF Completed 2010 LEED Gold 2 1/2 apparatus bays accommodating 14 fire fighters Renovation & addition, existing station remained operational during construction
DALLAS FIRE STATION 32 DALLAS, TEXAS 12,500 SF Completed 2013 LEED Gold 4 bays, urban environment, existing station remained operational during construction 2015 F.I.E.R.O Fire Station Design Merit Award
DALLAS FIRE STATION 33 DALLAS, TEXAS 12,300 SF Completed 2009 LEED Silver 4 bays, responds to contextual 1950 s architecture, integrated Public Art at entry canopy 2010 Topping Out - Top Ten Award, Best Projects in DFW
HOUSTON FIRE STATION 84 HOUSTON, TEXAS 14,000 SF Completed 2014 LEED Silver 5 bays with fire & EMS apparatus, natural light, open-concept Kitchen/Dining/Fitness 2016 AGC Houston Apex Gold Award
RICHARDSON FIRE STATION 4 RICHARDSON, TEXAS 14,100 SF Completed 2012 LEED Silver 4 bays, bi-fold doors with roll-down security grills, design blends with neighborhood 2012 F.I.E.R.O Fire Station Design Merit Silver Award
RICHARDSON FIRE STATION 1 & FIRE ADMINISTRATION RICHARDSON, TEXAS 22,000 SF Anticipated Completion 2018 Designed as part of a Public Safety Campus including Police Headquarters 4 bays, Fire Administration on second floor, private courtyard & shaded patios Incorporates graphic art throughout interiors & signage
BENBROOK FIRE STATION 1 & FIRE ADMINISTRATION BENBROOK, TEXAS 6,500 SF New Construction + 4,500 SF Renovation Completed 2013 Tornado-hardened Emergency Operations Center Large, complex renovation & expansion including new kitchen, dining, weight room, and patio
STEPHENVILLE FIRE STATION 2 & FIRE ADMINISTRATION STEPHENVILLE, TEXAS 13,700 SF Completed 2014 3 pull-through Apparatus Bays Fire Administration & Fire Station features 9 bedrooms, fitness room, training, and 6 offices
CELINA FIRE STATION 1 & FIRE ADMINISTRATION CELINA, TEXAS 9,200 SF Completed 2015 Reflects the architectural character of the historic downtown Dormitory is designed to adapt to future Emergency Operations Center
ROANOKE FIRE STATION 1 & FIRE ADMINISTRATION ROANOKE, TEXAS 16,000 SF Completed 2008 5 bay Central Station for rapidly growing community 40-person Training Room serves as tornado-hardened Emergency Operations Center
TEAMWORK BRW Architects approach always begins with the philosophy of Teamwork. We know that the success of our projects is based on a collaborative spirit of joining a team comprised of the municipal client, the fire fighters that serve the community, citizens within the neighborhoods served and our team. Our hands on approach to developing true partnerships is a goal we embrace and support from concept to ribbon cutting. DETAIL-ORIENTED We understand that every Fire Department has specific needs and variables that require a customized level of service to address, refine and assure quality of the finished facility. We fully appreciate the fact these must be highly functioning facilities, but are also a day-to-day home for the brave men and women that protect our neighborhoods. INSPIRATIONAL DESIGN BRW Architects design flexibility promotes various stylistic character, addresses operational variation and has an ability to adapt to department needs and public interest. Our architectural team has a diverse design background that brings a knowledge and appreciation for fitting into the local context and respectfully developing a building that promotes Texas based civic pride. FOCUSED ON WHAT MATTERS VALUE DRIVEN BRW understands the importance of providing value driven design strategies to fit the requirements of the project program, the aesthetic and functional goals of the facility. BRW has in-depth experience in planning for the long-term so that decisions allow for future flexibility and adaptability. We have successfully completed projects that respond to a variety of funding limits, yet always provide the best value. SUSTAINABLE BRW Architects provides cost effective, practical, sustainable solutions that benefit the environment and allow nature and industry to successfully coexist. We research and develop ideas and tools for high performance, sustainable and regenerative architecture. These tools reduce operating costs, increase productivity and learning, and help protect the environment.
WESTLAKE FIRE STATION 1 & FIRE ADMINISTRATION WESTLAKE, TEXAS 17,500 SF Anticipated completion 2018 4 bay station includes Fire Administration & Training Room Catalonian-inspired design, responds to strict requirements of town master plan
IRVING FIRE STATION 12 IRVING, TEXAS 10,800 SF Completed 2017 Anticipated LEED Certification First Fire Station built for the city of Irving since 2005 4 bay station located directly on main highway access
SACRAMENTO FIRE STATION 14 SACRAMENTO, CALIFORNIA 9,600 SF Anticipated Completion 2018 Anticipated LEED Certification Entrance Lobby is set within urban plaza of industrial setting 3 bay station with bi-fold doors
LEWISVILLE FIRE STATION 7 LEWISVILLE, TEXAS 14,200 SF Completed 2009 Three 100-ft pull-through bays allow for large ladder trucks & vehicle maintenance Station designed to reflect Old Chicago -style fire stations Direct connection to Interstate Highway 35 corridor
COLLEGE STATION FIRE STATION 6 COLLEGE STATION, TEXAS 25,000 SF Completed 2012 Five 100-ft pull-through bays, second floor sleeping quarters, large community meeting room Home to one of the Nation s Premier Fire Schools
CANYON LAKE FIRE STATION 5 CANYON LAKE, TEXAS 7,600 SF Completed 2011 Texas Hill-Country design with local stone, heavy timber, large dormers & deep overhangs Serving aggressive growth around Canyon Lake area 2011 Fire Chief Magazine Station Style Silver Award
RICHMOND FIRE STATION 1 & FIRE ADMINISTRATION RICHMOND, TEXAS 17,000 SF Completed 2016 Large-scale Central Station with attached Fire Administration Extra storage space converted into an IT HUB for the entire city 2016 F.I.E.R.O. Fire Station Design Merit Award
PEARLAND FIRE STATION 3 PEARLAND, TEXAS 10,700 SF Completed 2015 Design preserves site heritage trees, existing EMS station remained operational during construction Bays include a double door system allowing daylighting and hurricane protection 2016 Firehouse Magazine Station Design Notable Award
ALDINE FIRE STATION 21 ALDINE, TEXAS 10,900 SF Completed 2016 Three pull-through 70-ft bays Natural stone & metal paneling combination bridges surrounding industrial & residential areas Open concept living area, private covered patio & grill, sleeping quarters for 8 fire fighters
HORIZON CITY FIRE STATION 1 HORIZON CITY, TEXAS 27,500 SF Completed 2014 5 1/2 apparatus bays & training facility to serve entire County Large facility serving greater El Paso and far West Texas area 2016 Fire House Magazine Station Style Bronze Award
SERVICES PROVIDED: Architecture Space Programming Site Master Planning Analysis Building Design Construction Documentation Interior Design Lighting Design Landscape Architecture Construction Administration Renovations Additions Building Information Modeling (BIM) Sustainable Design (LEED) Needs Assessment Feasibility Study Cost Evaluation Code Analysis Comprehensive Facility Study Furnishing Selection & Procurement Accessibility (ADA) Study DALLAS 3535 Travis Street Suite 250 Dallas, Texas 75204 214.528.8704 COLLEGE STATION 175 Century Square Drive Suite 350College Station, Texas 77845 979.694.1791 HOUSTON 4501 Magnolia Cove Drive Suite 250 Houston, Texas 77345 281.361.3800 BRW has received more than 50 awards over the past three decades. To learn more about our fire projects, clients and awards, please visit: WWW.BRWARCH.COM/FIRE SAN FRANCISCO 1620 Montgomery Street Suite 320 San Francisco, California 94111 415.749.2670