Similar documents
PBS observed paint chips in the garden, which is located approximately six to 10 feet from painted surfaces that were in intact condition.

The school s metal push-out windows were assessed and nothing of concern was noted.

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

PBS did not observe any paint chips on soil at the school, and no areas of major concern were observed.

Sacramento Public Library Authority

Plain Elementary School 1370 Cherry St. Plain, WI 53577

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

November 29, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top

PBK K-12 Bryan ISD Administration Building Bryan Independent School District \\ Bryan, Texas. Design Presentation.

CL Series Cylindrical Locks: Security That Fits

SARGENT Bored Locks: Secure Every Opening

Arlington Public Schools Purchasing Office

Pedestrian Annual Count Report

POSTING (DATE/TIME): FROM: / 5:00PM UNTIL: / 5:00PM Pgs. 1 of 12

REPORT CARD TO THE COMMUNITY MAY 15, 2018

ROSLINDALE BRANCH, BPL COMMUNITY PRESENTATION #2 MARTIN J. WALSH, MAYOR CITY OF BOSTON PUBLIC FACILITIES DEPARTMENT 02/07/2018

DLA Land and Maritime - VQ Supplemental Information Sheet for Electronic QPL-55302

For the sake of this investigation, it is assumed that all paint and varnish at the school contains some concentration of lead.

Sprinkler System Installer Consultation Discussion Guide

DOUGLAS INTEREMDIATE / ELEMENTARY SCHOOL MASSACHUSETTS SCHOOL BUILDING AUTHORITY FINAL DESIGN PROGRAM / ADVANCED SCHEMATIC DESIGN SUBMISSION

LMS A NORTH BEACH BRANCH LIBRARY SCHEMATIC DESIGN IMAGES SAN FRANCISCO PUBLIC LIBRARY

RYERSON UNITED CHURCH MIXED-USE DEVELOPMENT Vancouver BC

Interior Finishes January 22, 2018

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

LONG-RANGE PLANNING COMMITTEE

Radon Detection Specialists, Inc.

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

TYPE APPROVAL CERTIFICATE

DNV BUSINESS ASSURANCE

School Emergency Plan Revised October 2012 LOCH LOMOND SCHOOL

EDUCATIONAL SPECIFICATION

Arena Elementary School 314 Willow St. Arena, WI 53503

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

TRIO Compact Gas Barbecue

LANDSCAPE DESIGN NARRATIVE AND PRECEDENT IMAGES 37

Optimizing the Radiance Workflow: In an Integrated Firm Environment

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

FIRE SAFETY PLAN Revised December

NYC Department of Education

NYC Department of Education

Radon Detection Specialists, Inc.

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

NYC Department of Education

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

NYC Department of Education

Radon Detection Specialists, Inc.

Radon Detection Specialists, Inc.

NYC Department of Education

MSL A B A BK3 OS P AB

Tyco International Ltd. Securities Litigation Settlement c/o The Garden City Group, Inc. Claims Administrator P.O. Box 9156.

Inspector: PROPERTY INFORMATION Photo Smoke Detector Notification Control Panel Stand Alone Smoke Detector Dialer SUMMARY ONLY

White Bear Lake Area Schools District 624 ENERGY GUIDELINES

NYC Department of Education

Educate Challenge. LONG RANGE FACILITIES PLAN Long Range Facilities Plan Committee. June 11, :30 pm 7:30 pm

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

NYC Department of Education

NYC Department of Education

5 Year Capital Improvement Plan Update

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

Certificate of Compliance

Master Planning Committee Meeting #8 Notes

A NEW AMERICAN HIGH SCHOOL

Nor-Ray-Vac Modulating

NO SAFETY AND SECURITY OF STUDENTS, EMPLOYEES AND VISITORS

SCHEMATIC DESIGN PRESENTATION

30% Design Community Meeting

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

Explain in writing if the address of the building is different than the address on this form:

TS Series. Technical Instructions. Document No. TS-4000 June 25, TS-CE Combustion Enclosures with LMV5. Description

NYC Department of Education

Study Document. School District. Hillsboro, Wisconsin

Use of energy recovery systems in air conditioning, ventilation or screening

NYC Department of Education

SCC Inc. TS Series. Technical Instructions. Document No. TS 5000 February 12, TS CE Combustion Enclosures with LMV3.

NYC Department of Education

NYC Department of Education

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE)

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

DOCUMENT 01 DESIGN-BUILD PROJECT MANUAL FOR THE DISTRICTWIDE FIRE ALARM MODERNIZATION PROJECT

C.U.S.D. Elementary Education Specifications. Facility Services. Dr. Janet Young, Ed.D. District Superintendent

NYC Department of Education

CERTIFICATE OF COMPLIANCE

2012 Exhibition of School Planning and Architecture. Carroll Middle School. Construction Project of Distinction Award


REV: 000. Mercury Compact Series

Certificate of Completion

Portfolio. Portfolio. Interior Design. By Kinjal Ahalpara

NYC Department of Education

Briar Crest Elementary

NYC Department of Education

NYC Department of Education

NYC Department of Education

CENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE

CCES IEQ Walkthrough Summary Spring Room Observations (Responses)

Transcription:

Reed, Wells, Benson & Company Consulting Engineeers Firm Registration F-2176 #: COIT CENTRAL TOWER SUITE 1100 12001 NORTH CENTRAL EXPWY DALLAS, TEXAS 75243 RWB PHONE: (972 788-4222 FAX: (972) 788-0002 WWW.RWB.NET RWB PROJECT 18008-00 # ARCHITECT 02 TYPICAL DUCT DETECTOR MOUNTING DETAIL 604 620 605 VLK Architects, Inc. 2821 West 7th Street, Suite 300 Fort Worth, Texas 76107 Main Phone: 817.633.1600 www.vlkarchitects.com M.E.P. ENGINEER Reed, Wells, Benson, & Co. 12001 N. Central Expressway, Ste. 1100 Dallas, Texas 75243 Main Phone: 972.788.4222 www.rwb.net EAGLE MOUNTAIN - SAGINAW I.S.D. F O R T W O R T H, T E X A S 101B 101A 120 105 104 EARLY CHILDHOOD 100 101 100A 101C 123 122 102C 106 107 121 RESOURCE ROOM 103 TIME OUT 103A 103B 108A 102. 129 128 LOUNGE 108 127 TELEPHONE 108B 102B 102A YARD 212 134 CUSTODIAN 130 CUSTODIAN 126. 133 132 131 125 124 210 209 205 204 202 203 224 222 602 600 211 208 207 206 201 200 608 /ELEC. 607 606 621 225 223 221 220 301A TESTING 301B 307 304 303 MDF 301F TEACHERS LOUNGE 234 SECRETARY 232 RECEPTION 226 PRINCIPAL 227 603 601 WOMEN 238 237 236 233 MEN 235 CLOSET CLOSET 227A 228A 321 COPY 239 CLINIC 231 230 VAULT 229 CLOSET 301C LOUNGE 301 ASSIST. PRINCIPAL 228 TIME OUT 301D 306 305 302 301E 320 SUPPLIES 400A DIAG. 301G MATERIALS CENTER 240 LIBRARY 241 401 SCIENCE LAB 400 418 404 405 420 402 403 419 415 416 BREAK ROOM 412 CUSTODIAN 417 420 407 406 410 STAAR 409 421 414 413 CORR. 422 523 522 EQUIPMENT 411D 411C 411B 411A 500A KILN 500B CAFETORIUM 502 STAGE 503 521 SPECIALTY 500 WORK ROOM 501A 501B GYMNASIUM 411 509 MECH 507 SCULLERY 505 DRY 506 ART ROOM 501 LOCKER ROOM UTILITY ROOM 510 511 ROOM 512 508 KITCHEN 504 524 520 ISSUED: MARCH 8, 2018 Revision No. Director LGV Designer DSN Proj. Arch. PA REVISIONS Drawn By PROJECT NO. 1803.00 Quality Control QC SHEET TITLE FLOOR PLAN - FIRE ALARM - BRYSON ELEMENTARY SCHOOL Fire Alarm Replacement - Bryson ES & High Country ES SHEET NO. 01 FLOOR PLAN - FIRE ALARM - BRYSON ELEMENTARY SCHOOL FA1.01 COPYRIGHT 2018 VLK ARCHITECTS

RWB Reed, Wells, Benson & Company Consulting Engineeers Firm RegistrationF-2176 #: COIT CENTRAL TOWER SUITE 1100 12001 NORTH CENTRAL EXPWY DALLAS, TEXAS 75243 PHONE: (972 788-4222 FAX: (972) 788-0002 WWW.RWB.NET RWB PROJECT 18008-00 # 2821 West 7th Street, Suite 300 Fort Worth, Texas 76107 Main Phone: 817.633.1600 www.vlkarchitects.com M.E.P. ENGINEER 02 Reed, Wells, Benson, & Co. TYPICAL DUCT DETECTOR MOUNTING DETAIL 12001 N. Central Expressway, Ste. 1100 Dallas, Texas 75243 Main Phone: 972.788.4222 www.rwb.net BOILER A19E A19F A19J DRY A19H A19G CAFETORIUM A18 KITCHEN A19 SERVING A19A A19B A19F UTILITY A19D VAULT A20H RECEPTION A20 DRESS'G A19E PRINCIPAL A20J DIAG. A20K A8 CONFERENCE A20L A39 FILES A20G WARE A19C A20R A18B A45 RAMP CORR. A18D STAGE A18A ART/MUSIC A1 WOMEN A20N STOR. A20A CHAIR A18C ASSIST. PRIN. A20E HUB A20B STOR. A20M A46 A6 A10 A22 ELECT. A24 A30 ELECT. A32 A41 SPEECH A7 MATH A4 B20K /WORK B24A B123 A38 FOYER C6 DIAG. DYSLEXIA A31 A29 A11 A5 ACES A3 A36 HUB A34 A40 R.R. ENTRY A25 A127 C2 C1 1ST A37 A128 A26 A43 TIME OUT A3A CONTENT MASTERY A2 A12 3RD A23 TEACHER'S LOUNGE A21 A44 C2A A42 A20Q A20D A15 C1A TEL A21A A20S MEN A20P TEACHER'S WORKROOM A20F NURSE A20C A14 A9 A33 A13 A16 LIBRARY B24 C3 A17 BOOKROOM A35 C3A C4A GYMNASIUM B20 B20H AV/ STOR. B24B B1 B3 B29 B27 B5 C7 B39 B43 B10 B12 B17 B14 C4 B19 ISSUED: MARCH 8, 2018 B23 REVISIONS R.R. ENTRY B25 B20J B22 GYM STOR B20F B41 B42 B45 B46 ELECT B26 HUB B28 B20G B2 B4 B6 4TH B31 B7 FOYER C8 B38 K B37 B32 B30 B11 ELECT B33 B13 B34 B35 2ND B36 B18 C5 B44 B20B B20A B20C B20E B20D CUSTODIAL B21 C5A B8 B9 Revision No. B15 B16 B40 Director LGV Designer DSN Proj. Arch. PA Drawn By Quality Control QC PROJECT NO. 1803.00 SHEET TITLE FLOOR PLAN - FIRE ALARM - HIGH COUNTRY ELEMENTARY SCHOOL Fire Alarm Replacement - Bryson ES & High Country ES VLK Architects, Inc. EAGLE MOUNTAIN - SAGINAW I.S.D. F O R T W O R T H, T E X A S ARCHITECT SHEET NO. 01 FLOOR PLAN - FIRE ALARM - HIGH COUNTRY ELEMENTARY SCHOOL FA2.01 COPYRIGHT 2018 VLK ARCHITECTS