Thesis Proposal. Christine Clowes Lighting/Electrical Option Faculty Consultants: Professor Dannerth & Professor Mistrick January 30, 2009

Similar documents
Executive Summary. Houston Museum of American Art New York, New York

Lighting Redesign. Art & Visual Technology Building. Allen Walker Lighting/Electrical Option. Advisors: Dr. Mistrick Professor Dannerth

Chandler City Hall Chandler, Arizona

Duke University Medical School. Duke School of Nursing

Depth Work Part 1: Lighting Design

Franklin Square Hospital Center

Technical Report One

Shepherd University Wellness Center AE 481 Revised Thesis Proposal

Shepherd University Wellness Center AE 481 Thesis Proposal

Thesis Proposal Sherrerd Hall, Princeton University, NJ

Architectural Engineering Lighting/Electrical Option

HARRY RANSOM HUMANITIES RESEARCH CENTER

Lobby Lighting Redesign

Senior Thesis Presentation

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Tech Report. September 9,

Technical Report IVb: Proposal

Lighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1

Thesis Proposal Update #2

Lindsey Beane. Executive Summary

Center for Health Research and Rural Advocacy

University of California Santa Barbara. Student Resource Building

Lighting Proposal Memo

Technical Report #1 Existing Lighting Conditions and Design Criteria

Jamie Devenger Senior Thesis Princeton University Sherrerd Hall 1 Lighting Proposal Memo September 11, 2009

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile

Existing Area Description: The area is an angle around the North point of the building. It is a wide patio wrapping the façade of the building.

Windows Influence on Room Daylighting in Residential Buildings

Mechanical Systems Thesis Proposal: Calvert Memorial Hospital Prince Frederick, MD Holly Mawritz

F.W. Olin Physical Science Laboratory

Perot Museum of Nature and Science Final Lighting Design Presentation. Yucheng Lu, Lighting Electrical, Adviser: Shawn Good

Buidling 661 Annual Daylight Performance Modeling Studies

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

Hotel and Conference Center. AE481W AE482 Revised Thesis Proposal

Cosmetology Lab Redesign

Related Sections: TBD. Effective Date: January 1, 2016

The New York University Concourse Project. New York City. Existing Conditions and Design Criteria

Kimberly Morton The Pennsylvania State University Architectural Engineering Program Lighting/Electrical Faculty Advisor: Dr.

ASHRAE Standard 62 Ventilation Report Technical Assignment #1. Calvert Memorial Hospital Prince Frederick, MD

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

Lighting Design Criteria: Codes and Standards

Dorrance H. Hamilton Building

Exterior Façade Lighting Design

Code Compliance. Lightcloud. Guides for California Title 24 & ASHRAE

7. MECHANICAL SYSTEM DESIGN

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

Schematic Design Proposal Presentation

Technical Report Three

PANELBOARDS & BUILDING DISTRIBUTION

Lobby Lighting Design

[Lighting Proposal Memo ] Hotel and Conference Center Virginia, USA

Duke Tower Main Entrance Lobby Overview

ANALYSIS OF SMOKE MOVEMENT IN A BUILDING VIA ELEVATOR SHAFTS

Note: A summary of the applicable code sections is shown in the CEC _Table100A.

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Tech Report 1, Part 1: Lighting Proposal Memo TO: Shawn Good

Lighting Existing Conditions and Design Criteria Report

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

The AstroPower Headquarters Newark, Delaware

THE AUGUST WILSON CENTER FOR AFRICAN AMERICAN CULTURE PITTSBURGH, PENNSYLVANIA. PERKINS + WILL chematic Design Presentation MICHAEL P.

Gathering Space. Function and Orientation. Space Characteristics Gregory Wolfe 2004 Senior Thesis Lighting / Electrical

Steve Neimeister 8 October 2003 AE 481W AstroPower Headquarters Newark, Delaware Lighting/Electrical Option Consultant: M. Moeck

Underfloor Air Distribution:

Café DUSON- Overview

Des Places Residence Hall

Project Proposal The Sterling and Francine Clark Art Museum 225 South Street, Williamstown, MA

13-15, 2001 USING LIGHTING SIMULATION TO ASSESS THE PERFORMANCE OF AND INDIRECT OFFICE LIGHTING SYSTEMS IN DYNAMIC WORKPLACES

2014 Alberta Building Code. Part 9 changes relating to Smoke and CO Alarms

Jennifer Mers. Rio Hondo Library and Learning Resource Center. Executive Summary. General Building. Lighting/Electrical Option

Eric Anderson. Technical Report 1. Existing Lighting Conditions

LIGHTING CONTROLS

Building Electrical System Overview

Technical Report Two

Lighting Existing Conditions and Design Criteria Report Brian Regan Ltg./Elect. Virginia Historical Society 10/8/03

Inspiration. Wall Street. Innovative Dynamic. Original. Established. Powerful Enlightened. Competitive. Modern. Intrigue

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Advanced Lighting For Office

University Park, PA. The Pennsylvania State University Architectural Engineering Lighting and Electrical Faculty Advisor: Dr.

Thermal Environment in a Space with Capillary Mats Large-Area Cooling and Heating

Lord Stirling Community School

University of California, San Diego Cal IT 2 Brian Smith. Schematic Design Presentation 06 December 2005

Lighting Existing Conditions and Design Criteria Report

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

ANSI/ASHRAE/IES

PRESCRIPTIVE APPROACH

COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units

Lighting Systems. Lighting Control for Restaurants. The ultimate dining experience demands the ultimate lighting ambience

Vive Solutions. Commercial Application Guide Code Compliance Lighting Controls IECC 2015

Lighting System Conceptual Design

Table of Contents. List of Figures and Tables. Executive Summary: 3 ASHRAE Standard 62.1 Section 6 Analysis 7

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018

Building Code Act. Building Code. Standards

REVISIONS Summary of Change. 6/1/12 All Replaced entire document with new revision

ANSI/ASHRAE/IES

UFAD and Displacement Ventilation. Dan Int-Hout, FASHRAE Chief Engineer Krueger Richardson, Texas

Vive Solutions. Commercial Application Guide Code Compliance Lighting Controls IECC 2012

UNIVERSITY OF PENNSYLVANIA NEURAL AND BEHAVIORAL SCIENCES BUILDING 415 University Ave, Philadelphia, PA 19104

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

Lord Stirling Community School Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004

INDOOR CLIMATE OF A SINGLE ZONE

Transcription:

Thesis Proposal Christine Clowes Lighting/Electrical Option Faculty Consultants: Professor Dannerth & Professor Mistrick January 30, 2009 National Intrepid Center of Excellence Bethesda, MD

Table of Contents Executive Summary... 3 Breadth 1: Architecture... 4 Breadth 2: Mechanical... 5 2 C.Clowes

Executive Summary This proposal details the work to be completed in the Spring of 2009. It presents a description of the redesign of several systems present in the National Intrepid Center of Excellence (NICoE). Included are explanations of two depth and two breadth topics. This document does not conclude that there are actual problems with the existing systems, it is just meant to provide an approach to alternate solutions. The lighting depth presents new design concepts in four proposed spaces: exterior site and façade, lobby, auditorium, and physical and occupational therapy/waiting areas. The new design aims to create a comfortable, pleasant, and workable atmosphere that is tailored to the needs of the occupants. The space should also be functional, with light levels that meet those specified in the IESNA Handbook. All power density requirements present in ASHRAE 90.1 should also be met. The electrical depth includes a redesign of the branch circuit distribution for the four spaces to be re lighted. A protective device coordination study and short circuit analysis will also be conducted. A voltage drop analysis will lead to a comparative cost study of increasing feeder sizes to save energy and money. SKM software will then be used to perform a short circuit analysis, protective device coordination, and arc fault study for the distribution system. The mechanical and architectural breadths will be developed as a direct result of daylighting and systems integration. The mechanical breadth will cover the effect of eliminating the east facing clerestory in the physical therapy/occupational therapy space. The change in cooling loads will be closely analyzed. The architectural breadth will include a redesign of the size, layout, and materials used for the wood ceiling panels located in the auditorium. This will enable the full integration of all building systems. 3 C.Clowes

Breadth 1: Architecture The auditorium has some very unique architectural features. The ceiling geometry is especially important in terms of the lighting layout. In order to accommodate for a lighting design that is both functional and visually pleasing, the ceiling details will be slightly modified. The materials, shape, and location of the existing wood panels will be altered, and additional paneling will be placed. This will make the space more architecturally pleasing and create a more efficient lighting design. The location of mechanical equipment and the coordination with other components located above the ceiling will be considered to fully integrate all building systems. 4 C.Clowes

Breadth 2: Mechanical The therapy waiting area contains a 2.5 clerestory that runs along the east wall. The location of this clerestory above the dropped ceiling does not enable this window to contribute an adequate amount of daylight into the space. The elimination of the element will greatly affect the total cooling load necessary in the space. A comparative study will be completed to determine the difference in energy load between the glass and a standard wall system. Additional cooling load contributors within the space will also be calculated. 5 C.Clowes