Riverwood CDD. Severn Trent Services Field Management Report Site Inspection 11/6 and 11/9/2015

Similar documents
Riverwood CDD. Severn Trent Services Field Management Report Site Inspection October 1, 2015 and October 9, 2015*

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection

RIVERWOOD LAKE INSPECTION FIELD SHEET

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection October 31, 2014

RIVERWOOD LAKE INSPECTION FIELD SHEET

Riverwood CDD. 3/29/2017 Field Management Report Country Lakes Drive (239) Fort Myers, FL 33905

Laguna Lakes CDD FIELD MANAGEMENT REPORT FOR NOVEMBER 2017

PORT OF THE ISLANDS CID

PORT OF THE ISLANDS CID

Tara Community Development District I Waterway Inspection Report

Maintaining Your Sparkle. Maintenance Issues. by Kathy Danforth

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

GATEWAY SERVICES COMMUNITY DEVELOPMENT DISTRICT (GSCDD) SURFACE WATER SYSTEM MAINTENANCE STANDARDS

Ben Powell, Clemson Extension

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Corporate Boulevard, Orlando, FL 32817

Exhibit A Section 1: Commerce City Right Of Way Landscape Maintenance Scope of Service

Conservation Landscaping Spot Check Inspection Checklist

ATTACHMENT A BUCKLEY COVE BOAT LAUNCH AND PARKING, PARK A. BUCKLEY COVE BOAT LAUNCH AND PARKING B. BUCKLEY COVE PARK

FFL Home Landscape Recognition Checklist

Dam Management. Must be managed No trees allowed

Ponds of. Ballantrae

29 Bella Fontaine Park

Please find the latest bioassessment for your lake below. Key highlights of this update include:

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

Tips for Maintaining and Enhancing Stormwater Management Areas

Homeowners Guide to Stormwater BMP Maintenance

Las Colonias Park Master Plan

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Community Notice. Spring Clean-Up, Paint Up, Fix-Up. May 15, 2015

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

Conservation Modules. Stormwater Pond Volunteers

(SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE)

Operations and Maintenance Plan

LANDSCAPE MAINTENANCE CONTRACT Detailed Scope of Work

If you have any questions on any services provided, please do not hesitate to contact us at the Association office.

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2011 ANNUAL REPORT

Operation & Maintenance of Stormwater Management Facilities

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

LIMITED EDITION LANDSCAPE MAINTENANCE GUIDELINES February 5,2015

ESPLANADE LANDSCAPE MAINTENANCE STANDARDS

STORMWATER MANAGEMENT FACILITIES/STORMWATER PONDS - What Are They?

LILAC Housing: Site Management Plan

Tampa Palms CDD. Board Of Directors September, 2017

There are 11 different micro-ecosystems that are found in 76 different areas throughout Stoneybrook. They are divided into three major groups.

Burrus Old Mill Park

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES

Kensington Covenants Committee Guidelines

Natural Areas Certification Program Guidelines

Lake Nokomis Shoreline Enhancement Project

Exhibit A. Scope of Work

Worksheet #14 Water Runoff Management


GENERAL MEMBERSHIP ANNUAL MEETING

Best Management Practices

MILL POND OVERLOOK. A project of the Town of Oyster Bay. Prepared by Cameron Engineering & Associates, LLP

Board of Directors. Robin Cashman President Susan Raia Vice President Jeff Mann Treasurer John Jordan Special Projects George Mickle Secretary

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Littleton Fields Master Plan

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager

PARTF Scoring System for Grants

Town of Millbury Department of Public Works

Your Yard and Pond are Connected RYAN RYCZEK ENVIRONMENTAL SPECIALIST II

Green City, Clean Waters

Ponds of. Ballantrae. Part 1 of 2: The Report. Prepared by the Ballantrae Community Development District Board of Supervisors

This wetlands calendar was created by students in connection with their science

PALO ALTO HIGH SCHOOL Palo Alto Unified School District MEETING NOTES. DATE: 21 September Palo Alto HS Update

Preferred Riverwalk Alternative Components August 17, 2017:

Erosion Control for Home Builders in the. City of Jacksonville

Evergreen Architectural Design Standards Revised July 2017

FURNEAUX CREEK 5 CHANNEL

Monitoring and Maintenance Permit Process

Quam Properties Hawaii, Inc Napilihau St. Suite 202 Lahaina, Hawaii Ph Fax

KINGS POINT LANDSCAPE INSPECTION October 28, 2015

STANDARD DETAILS QUICK REFERENCE

Welcome to Proper Maintenance of

Routine Maintenance Schedule and Checklist

Sherwood Lake Association Recommended. Landscaping and Home Maintenance Guidelines

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

Grand River Ravines Georgetown Township

RULES AND REGULATIONS AND OTHER USEFUL INFORMATION. Version: August 31, 2015

South Bend Park. Visioning Plan

Maintaining Your Neighborhood Stormwater Facilities

Oak Brook Colony Condominium Association. Landscape Commission Update. August 2014 Executive Summary

Wetland Types. Grade Level: Basic. Duration: 30 minutes. Setting: Classroom

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

CREEKSIDE VILLAGE HOMEOWNERS ASSOCIATION LANDSCAPE RULES CONTENTS

WATER CONSERVATION PSAs

Kittson Parkway / Watershed Park Parking Lot

Long Branch-Wayne Local Park Renovation Project

Use of Best Management Practices

UNIVERSITY OF NORTHERN IOWA

Great Neck Library Landscaping Committee Wednesday, January 18, 2017, 7:30pm Main Library

Mosquito Control Guidelines

UNIVERSITY OF NORTHERN IOWA

Templates for Maintenance Documents

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

REQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA

Transcription:

Riverwood CDD Severn Trent Services Field Management Report Site Inspection 11/6 and 11/9/2015 1. Lake Management: The ponds are doing really well, in regards to vegetation or algae. During one visit, Lake 5 did have a higher level than others, but it was concentrated in small pockets. Per Beautiful Pond s report, Lakes 3-11 will require treatment more aggressively as algae growth has been increasing due to improper fertilization in common areas. a. Lake Maintenance: Lake management details are provided below. RIVERWOOD LAKE INSPECTION FIELD SHEET DATE: 11/6-11/9/2015 By: M. Meadows Severity AW Alligator Weed HY Hydrilla VL = Very Low CT Cattails PA Planktonic Algae L = Low DF Dog Fennel PR Primrose M = Medium DW Duckweed TG Torpedo Grass H = High FA Filamentous Algae SE Sedge MI Miscellaneous Weeds BT Baby Tears HV Climbing Hemp Vine PW Pennywort Lake # Water Level Clarity Algae Shoreline Weeds Submerged Weeds Additional Concerns, Comments Lake #1 Lake #2 Wetland I Med Numerous Minimal flow at control structure Lake #3 Lake #4 Lake #5 Lake #6 Lake #7 Lake #8 Lake #9 Lake #10 Lake #11 Med-High Residents concerned with erosion along back of house. Baby tears breaking free and floating; trees in lake easement should have lower branches trimmed up and off surface water this includes the Cypress trees Lake #12 M Wood stork, HY treated Lake #13 M M 1 Piece of trash, HY recently treated, 1 dead fish, Lake #14 Lake #15 M M Fountain not working, HY 1

Lake #16 H H N No mow zone mowed Lake #17 M Lake #18 H N Bulrush was browned up Lake #19 Lake #20 H L Lake #21 H L N Large piece of wood lawn edging floating at the south end; one Thalia plant at the south end Leaf debris; no mowed zone mowed along residence side, Murky Large tree limb broken off near pond bank-removed; Murky and brown; osprey Lake #22 M L Murky and brown Lake #23 H M To prep pond bank for upcoming stabilization the pond banks no mow zones needed to be cut back; the area near the commons near the cul-de-sac at Grand Vista still needs to be cut; Murky and Brown; overhang of tree limbs at Preserve P and Q can be cut back Lake #24 Lake #25 Multiple trees in Preserve U have fallen-it would be better for the overall preserve and stromwater for these to be removed; tree branch fallen on berm between Preserve and Lake-let Walt know and asked him to have landscaper remove; Preserve U is loaded with TG Lake #26 Med-High L Met with Ms. McDonald; looked at a couple of downspout and a pool overflow issue. Possibly best time for resident informational meeting would be in March. Mangroves recently trimmed by lincense contractor. Water clarity-water very dark; drains at 14237 from gutter system appear to be clogged and need maintenance Lake #29 Fountain working; Brazilian Pepper growing out of the leather fern have asked vendor to sprayed, but hasn t Med-High to date; woody plants should be maintained or removed from lakes bank edge. Leather fern should reamian. Lake #30 Med-High L No mow zone behind houses cut; still need golf course side if stabilization is desired. Cutting grass to prep for stabilization. Murky; Approximately 30 bunches of lance/duck resident side; 3 groupings of bulrush along golf course side; 3547, 2, gutter/swale drains identified that need to be cleaned by home owner(s) Lake #34 Lake #36 Lake #37 Reclaim M Tree on lake easement has been cut as requested. Woody shrubs along top of bank should be removed sometime; littoral zone and it s plants look good b. Algae: Fertilization will increase algae production, it is recommended to decrease use. c. Littorals: Recent plantings in Lake 29 doing well. d. Submerged: Beautiful Ponds has been able to maintain any issues. e. Grass Clippings: Minimal, however during the mowing of the no mow zones several lakes had a lot along the shoreline. f. Landscape Vegetation Debris: No issues. g. Fish: Beautiful Ponds has provided the report for 2015 for fish removed from ponds. 2

Tilapia Harvesting Log 2015 Beautiful Ponds 2. Preserves: Date Lake Hrs h. Trash in Lakes: 1 piece. i. Shoreline Landscaping: No issues. j. Bulkheads: No issues observed. k. Fish Barrier: No issues observed. l. Control Structures: No issues observed. # fish Pounds Bass Bream Other fish & notes 5/15 13 fished 300 2 18 10 Plecos 16 250 5 22 2 Catfish 39 200 14 2 Black crappie 6/6 9 25 2 5 10 20 2 3 13 300 2 6 1 Myan cichlid, 1 Black erappie 16 200 1 8 8 Plecu 36 150 41 50 8/14, 15 34/Lagoon 150 3 Black crappie, 10 Plecos 35 25 Small fish/poor quality; clear waters 2 5 2 3 Clear waters; fish evasive 12 10 2 8 Clear waters; fish evasive 13 20 1 6 Clear waters; fish evasive 14 15 10 Clear waters; fish evasive 3 20 Clear waters; fish evasive 41 2 5 Clear waters; fish evasive m. Fountains: Lake 15 fountain not working. Vertex scheduled to come to property by end of week. n. Beautiful Ponds, Lake Report: Provided and sent to the Environmental Chair. o. Lake Bank Erosion: No new issues. Lake 23 stabilization to start soon. Preserve New Issue or Ongoing Work A * B * C * D * E * F * G * H * 3

I * J K * L * M * N * O * P Q *Aquatic Weed Control (AWC) treated, J behind Iacone s treated for vines and exotics coming in after Brazilian Pepper was removed. More treatments needed throughout year to keep these exotics out. * AWC treated for vines and exotics coming in after Brazilian Pepper was removed. More treatments needed throughout year to keep these exotics out. * AWC treated for vines and exotics coming in after Brazilian Pepper was removed. More treatments needed throughout year to keep these exotics out. R * S * T * U * V * W * AA * BB * *Preserve 3 nd quarter work should be completed in July, August, and September with the report due in October. The October 2015 report has been submitted. This table was requested by the Environmental Committee. A place holder (*) will be included in this report monthly indicated the regular maintenance activities and when the report is due. Any specifics will be reported for the individual preserve monthly. 3. Facilities: Overall noticeable amount of increase in use as residents come back for the season. Pool Equipment: No new issues. Pumps, Pool Restroom, 12 Pool Lights, and Fencing Area: No new issues. Pavilion: No new issues. Activity Center: No new issues. Community Center: No new issues. Pool Pavers: No new issues. Signage: No new issues. 4. Sports Courts: a. Bocce Courts, Croquet Field, Basketball Court, Horseshoe Pits: No new issues. b. Tennis Courts: No new issues. 5. Kids Playground: No new issues. 6. Dog Park & Perimeter Fence: Ants are more prevalent. The RCA has been notified and asked to have Mainscape address issue. 7. Roadways including Asphalt, Signage/Landscaping, Common Grounds: No new issues. Road project underway. 8. Sidewalks:.Pressure cleaning starting this month. 9. Storm Drainage System: No new issues. 10. Irrigation System: No new issues. 11. RV Parking Lot: No new issues. 4

12. WWTP and Golf Course Maintenance: No new issues. 13. Non CDD Issues Observed: No new issues. 14. Resident Issue: From Date Issue Action Communicated to RCA, asking that Dog Park Users Nov-15 Too many ants Mainscape look into the issue 15. Fish/Wildlife Observations: No outstanding amounts of wildlife observed this month. Bass Bream Catfish Gambusia Egrets Herons Coots Gallinules Anhinga Cormorant Osprey Ibis Woodstork Otter Alligators Snakes Turtles Other Species: 16. Beach Club Report, Highlights: Ramp construction is nearing completion, The storage unit and dumpster occupying several parking spots will be removed by 11/18 New gutters have been installed Attendants have started the pressure washing of decking. Entrance gate updates will be installed on November 23. This will include a new card-reader and software to improve communication with the security office. Once this work is completed, the gate will be closed after hours. The gate will be maintained by the same company overseeing all Riverwood gates. Upcoming: Property lines to be re-staked Englewood Boat races take place on November 19-21 Process for unauthorized person using the Beach Club is has been tabled and will be reviewed further 20 wild coffee scrubs to be planted at both ends of the front gate 5

Follow up summary: Follow Up Task CDD Tasks Preserve Boundaries & survey and permitting RV Park Riverwood CDD Follow Up Tasks Summary Action or Completed Stakes need to be put in place Communication on oil spills needs to be sent. Process going forward will be to send specific information to the RV Park Coordinator, which RVs have spills, so he can communicate to that specific RV owner. Installation of fence at the turn around (near Mill Rd and Dirt Rd Junction) FPL needs to be contacted regarding overgrowth of vegetation on two (2) power poles at the Dirt Rd by the maintenance area. Facilities, Parking Lot Perimeter Wall, Vegetation: Items listed in the June Inspection Report dated (06/02 & 06/03/2015) not completed: 1. Parking Lot Perimeter Wall: Weeds and unkempt appearance. 2. Vegetation along the Perimeter Fence and Behind Tennis Court needs to be addressed. Table delivered with missing parts. Waiting for vendor to ship parts. Maintenance area: Debris pile of landscape vegetation and dirt Completed and painted green. Completed. Pine straw appears to be added in some areas, but weeds still need to be addressed, and area needs some type of bedding material added. No action, as of 7/9/2015. Received parts, put together, completed Needs to be scheduled to have removed 6

CDD Lakes document has been added for reference. 7

This project list serves as a valuable resource, so it has been added. PROJECT DATE STARTED PROJECTED COST VENDOR BUDGET BOARD OF COMMITTEE SUPERVISORS ROUTINE MAINT. Pool Heater upgrade 9/10/15 52,000 Symbiont Appr. Appr. Upgrade Pool Mechanical rm/ Electrical 9/10/15 10,000 various No Appr. R/M COM- PLETED COMMENTS signed proposal going to vendor soon Symbiont has signed proposal and deposit sent Addition of fence on maint. Rd. US Fence upgrade 10/14/15 completed/ Also painted Pool paver/ pool crack repair 9/11/15 out for bid no no R/M JT pools estimate 10/20 1030am Grant pools Pool rain drainage upgrade 9/11/15 no no upgrade Possibly do when the upgrade of the campus is being done Salt water system pool/spa upgrade 10/12/15 out for bid no no upgrade pool boy and 5 star pools B.M. 11/3/2015 8