DIRECTORATE OF ESTATES AND FACILITIES

Similar documents
Management Standard: Fire Safety

FIRE SAFETY MANAGEMENT PLAN

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

Fire risk management plan. MH/05/Revised/06/17

Millfield Schools Fire Risk Prevention Policy

West Yorkshire Fire & Rescue Authority. Fire Protection Policy

Fire Safety Management Audit Specification August 2017

FIRE SAFETY POLICY. Executive Management Team. Health, Safety and Fire Steering Group.

Fire Safety Strategy

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

Fire Safety and Arson Prevention

FIRE SAFETY POLICY Revised March 2013

LYHA Fire Safety Policy

Fire Safety Policy SH HS 06. Version: 4. Summary:

Fire Safety Policy. Document Author: Director of Estates, Fleet & Facilities Management

Local Rules: Fire Safety

Fire Safety Policy 29/09/2017. Holme Grange School Whole School Policy Including EYFS. Fire Safety Policy

Fire Safety Management

Fire Safety Policy. Contents. This policy was approved by the Trustees on 6 September 2018 and will be reviewed not later than every 5 years.

NOTTINGHAM CITY HOMES

Fire Safety Policy and Procedures

Fire Safety Report & Audit

Annemount School Fire Safety Policy This Policy is for the whole school including the EYFS

Awarding body monitoring report for: Institute of Legal Executives (ILEX) February 2008 QCA/08/3734

St Edward s Oxford FIRE SAFETY POLICY

SECURITY SERVICE LEVEL AGREEMENT

June 2017 (Updated 18 January 2018) Fire Safety Policy. Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited

Managing Fire Safety Through Construction. Reece Walker Arup Fire Engineer

Fire safety policy. Contents. This policy was approved by the Trustees on 3 September 2015 and will be reviewed not later than every 3 years.

WILTSHIRE POLICE FORCE PROCEDURE. Fire Safety Management

NHS Tayside. Fire Safety Policy

Fire Safety Protocol

FIRE SAFETY POLICY. This policy document replaces any previously published documents and comes into effect September 2018.

POLICY FOR FIRE SAFETY MANAGEMENT

FIRE SAFETY POLICY. This policy refers to both Wellington Senior School and Wellington Prep School

Fire Risk Assessment 2017

The Health, Safety and Security Department UNIVERSITY POLICY AND MANAGEMENT PROCEDURE. Fire Safety

ESSEX POLICE, FIRE AND CRIME COMMISSIONER FIRE & RESCUE AUTHORITY Essex County Fire & Rescue Service

Dan Gray, Property Director. Date: November 2017 Review Due Date: November 2020

Health, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service

Stationers Crown Woods Academy. Evacuation Chair. Policy

FIRE SAFETY POLICY April 2011

FIRE SAFETY POLICY. Approval Approved by: University Court Date: March 28 th 2017

Joint Responsibility for Health and Safety Internal Guidance for Members and other occupiers of the Scottish Parliament Campus.

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

FIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre

Fire safety procedure

Fire Safety Policy 2018/19

IN THE MATTER OF THE GRENFELL TOWER PUBLIC INQUIRY OPENING STATEMENT CS STOKES & ASSOCIATES LIMITED

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Fire Risk Assessment

EMERGENCY EVACUATION PLAN

Thank you for your letter of 26 June regarding the Committee s scrutiny of building regulations in Scotland.

Property Health and Safety Compliance at Housing and Education Centres

Fire Risk Assessment

Fire Safety Management

Fire Safety Procedures and Associated Training

Contents HEALTH AND SAFETY MANAGEMENT SYSTEMS FIRE PREVENTION AND EVACUATION PROCEDURE. 1. Introduction. 2. Warning in the event of fire

The Royal Wolverhampton NHS Trust

FIRE SAFETY POLICY. Version: 4 Senior Managers Operational Group Date ratified: March 2016

Arbour House. Fire Policy and Procedures

EMERGENCY EVACUATION PLAN

Fire Safety. A TUC guide for trade union activists

FIRE SAFETY POLICY June 2014

Fire Risk Assessment

Fire Safety Policy (Communal Areas)

Evacuation of Mobility Impaired Persons. Staff News: New Fire Evacuation Policy and Procedures Important for all staff and students

Bedfordshire & Luton Fire & Rescue Service. Reducing Arson Across Schools Thomas Warner, Area Community Safety Officer (Arson)

GDST Fire Safety Strategy March 2016

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

Protocol between Local Housing Authorities and Fire and Rescue Authorities to improve fire safety

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT

To seek Cabinet approval of the Council s Fire Safety Policy. It is proposed that Cabinet approves the Fire Safety Policy.

SERVICE LEVEL AGREEMENT

FIRE PROCEDURES 1. APPOINTMENTS

Working together for a safer Scotland LOCAL FIRE AND RESCUE PLAN FOR SOUTH LANARKSHIRE

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 PERIODIC REVIEW OF FIRE RISK ASSESSMENT

Chesterfield Borough Council

Fire Risk Assessment Safety Checklist

FIRE SAFETY POLICY. Health and Safety. Reviewed by: Health & Safety Committee (2 May 2018) Approved by: Council (25 June 2018)

Fire Safety Policy. Investing in success. Dukes Centre Dukes Avenue Kingston KT2 5QY 1. Policy

Policy for Safe Evacuation of Persons with Disabilities

FIRE SAFETY 2013 ANNUAL REPORT. Author: Senior Fire Safety Advisor Contact Details for further information: Frank Barrett

Electrical Safety Policy and Management System

EMLC Academy Trust. Fire Safety Policy 2017/19. Every child deserves to be the best they can be

Health and Safety Draft Performance Standard HSPS 012. Provision of Personal Emergency Evacuation Plans (PEEPs) (Fire Safety)

DSO Compliance Report 2009

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

Fire Risk Management Policy. UK September 2017

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 PERIODIC REVIEW OF FIRE RISK ASSESSMENT

Reviewed and Agreed by the Health and Safety Committee October Health and Safety: Fire Safety Plan and Procedures

RIBA response to the second phase of the Independent Review of Building Regulations and Fire Safety

Health and Safety Services. Safety Guide 5. Fire drills

Fire Safety Policy. Signed Date September on behalf of the Management Committee. on behalf of The Woodlands

Allfire Site No. a division of Allsaved Ltd. Fire Safety Log Book. Premises Address: Responsible Person:

Fire Evacuation Procedure WISE Campus

Fire Risk Assessment

Fire safety management issues identified by fire risk assessments

Regulatory Reform (Fire Safety) Order 2005 Category of Premises against the FSO 2005: Sleeping Accommodation

Are you educated in safe emergency evacuation and fire safety risk assessments? Education: A Guide to Fire Safety

Transcription:

DIRECTORATE OF ESTATES AND FACILITIES PROCEDURE AND INFORMATION MANUAL EPM HS31 Fire Safety Management Policy Document originated: July 2016 By: CSU Issue number: 2 No of pages: 6 Approved by: DOEF Status: Working document Last revised: October 2018 By: Policy & Procedure WG Next revision: July 2021 By: CSU The purpose of this document is to set out how the Directorate of Estates and Facilities (DOEF) discharges its duties under the Regulatory Reform (Fire Safety) Order 2005 1

CONTENTS Section Page No s 1 Introduction 3 2 Fire Risk Assessment and Fire Remedial Works 3 3 Items requiring action identified in the FRA 3 4 Remedial works strategy.. 4 5 Governance 5 6 Operational Fire Plans 5 7 Routine and cyclical maintenance on physical fire safety installations 5 8 Fire Signage.. 5 9 Monitoring 5 Figure 1 Directorate of Estates and Facilities Governance Meeting Structure. 6 2

1.0 1.1 1.2 1.3 Introduction This document sets out the Directorate of Estates & Facilities arrangements in relation to fire safety and how it intends to meet the requirements of the Regulatory Reform Order (Fire Safety) 2005 (RRO). These arrangements deal specifically with the physical estate in relation to fire safety. All matters relating to fire safety management can be found within Chapter 7 Fire Safety arrangements. 2.0 Fire Risk Assessment and Fire Remedial works 2.1 2.2 2.3 2.4 The Directorate of Estates & Facilities (DOEF) will undertake fire risk assessments for all buildings where it is deemed the University has a responsibility under the RRO. Fire risk assessments will be completed by competent persons engaged via the DOEF procurement Framework. The frequency of fire risk assessments will be on a risk based approach. Fire risk assessments will be undertaken in accordance with the fire risk assessment schedule. Fire risk assessments will be provided by suppliers completed in accordance with the standard format as agreed as part of the procurement process and retained within the DOEF FRA database (GRATiK). The fire risk assessment programme will be managed by the Design Services Unit and an appointed Project Manager/Client Representative will ensure co-ordination takes place for access, notification to key building users, and agreement on programme delivery and agreed costs. All completed fire risk assessments are returned to the Client Services Unit Fire Team, for scrutiny and processing the findings. This team will focus on priority items identified within the fire risk assessments and package them into concise work packages for presentation to the DOEF Project Allocation process to allow for remedial works to be actioned. 3.0 3.1 Items requiring action identified in the FRA Items requiring action as a result of a fire risk assessment fall within three clear categories, these being: 1. Management arrangements that need addressing i.e. flammables left on a corridor 2. Remedial repairs that are needed i.e. replace broken closer 3. Major upgrade works to the fabric of the building i.e. provide additional compartmentation 3.2 Category 1. Management issues are, via the GRATIK system, directed to agreed individuals within each building. It is deemed the responsibility of the Head of School via the School Safety Advisor to address these items in a timely manner as agreed with Fire Safety Team. 3

3.3 Category 2 Items reactive remedial repairs processed via the Fire Team directly to the DOEF Help Desk for the attention of the Maintenance Services Unit to complete or towards Design Services Unit small works team. 3.4 Category 3 Major upgrade works these are assessed in detail by the Fire Team on a building by building basis taking into account the issues raised and the fire risk assessment risk priority of each issue. 4.0 4.1 4.2 Remedial works strategy Major upgrade works- It was previously agreed between DOEF and Safety Services that due to funding limitations DOEF would aim to address all Priority 1 and 2 items in the first instance, taking into consideration other Priorities across campus. Remedial Repairs- All repairs identified within the fire risk assessment will be completed irrespectfully of the priority rating. NOTE- University Fire Team will use their knowledge, training and expertise to determine whether works is required. 4.3 Academic/Non Academic Buildings Within the Academic/Non Academic property portfolio it has been identified that whilst Priority 1 and 2 items raised in the FRA continue to be addressed year on year there are a number of buildings with lower Priorities 3 to 6, that due to funding restrictions and the current DOEF strategy of delivery these items will be considered for addressing over a longer period of time. Therefore following a number of years of completing Priority 1 and 2 items it has been devised that the Fire Team will draft up a list of their Top 10 buildings (using the building scoring matric based on risk) in terms of fire safety risk, and that all priority items within the buildings resulting from the next round of fire risk assessments (2017) will be addressed. This will go some way to address the varying risk profile that exists across this portfolio of buildings. Attention will be focused on the higher risk buildings and a higher building will therefore be treated as a high priority using this approach. 4.4 Residences & Sports Buildings Residential Building This portfolio of buildings has a very even risk profile as all buildings contain a sleeping risk. Therefore we will continue with addressing Priority 1 and 2 items as a priority, across this portfolio, due to funding constraints. Sports Building This portfolio of buildings has a very even risk profile. Priority 1and 2 items will be continually addressed across the portfolio, due to funding constraints. 4

5.0 Governance 5.1 Fire safety across the Directorate of Estates & Facilities is currently managed via a series of meetings, steering groups and committees to ensure fire safety standards are maintained. Figure 1 below sets out the hierarchy of these and indicative frequency of meetings. 6.0 Operational Fire Plans 6.1 The aim of the University operational fire plans is to provide a consistent approach identifying hazards and risk supporting the Fire and Rescue Service to gather information on University properties to deliver their core functions safely. 6.2 This information is collated by the Fire and Rescue Service and entered in their Operational Information System (OIS) using two methods; firstly local crews visit buildings to gather the information updating the OIS and the University Fire Officer forwards operational fire plans to the Fire and Rescue Service to maintain currency of information, allowing the Fire and Rescue Service to update their OIS. 6.3 Data for the operational fire plans is regularly updated on a risk based schedule, the higher the risk the more frequent the audit and review. 6.4 The Operational fire plans includes a Hazard and Risk Questionnaire which is forwarded via Faculty Estate Teams to responsible persons in University premises for completion. The data is collated by the University Fire Officer and shared with the Fire and Rescue Service. This information is held in a red document box (which contains the University operational fire plans for that building) provided in each building adjacent to the fire alarm panel for use in the event of an emergency incident. 7.0 Routine and cyclical maintenance on physical fire safety installations 7.1 The arrangements and frequency of maintenance for items such as fire alarms, emergency lighting, fire suppression systems, firefighting equipment, and emergency egress equipment such as evacuation chairs etc. are all detailed within the DOEF procedures document EPM FM1 Maintenance Strategy. This document should be read in conjunction with EPM FM1 8.0 Fire Signage 8.1 DOEF management of signage requirements for fire safety signage is detailed within the Estates and Facilities document EPM HS30. This document should be read in conjunction with these arrangements. 9.0 9.1 Monitoring arrangements The university fire team attends a number of meetings with regards to major upgrades and remedial repair projects. These meeting are arranged by project managers and are undertaken on a monthly basis. 5

9.2 9.3 9.4 At these meeting, progress is reviewed against the issues raised and actions are assigned to the relevant persons to ensure work progresses. Should any items of works identified in the major upgrades and remedial repair project which are prevented from progressing, these are reported at these meetings. The implementation of the fire risk assessment schedule is monitored to ensure it is fulfilled and within the correct time periods. Any issues regarding delays are communicated from the project manager to the fire team, and appropriate action to achieve progress is taken. Fig 1 DIRECTORATE OF ESTATES & FACILITIES GOVERNANCE MEETING STRUCTURE FSAG (Quarterly) TECHNICAL FIRE SAFETY WORKING GROUP (Monthly) FIRE REMEDIAL PROJECTS STEERING GROUP (Monthly) FIRE SAFETY SERVICES FRAMEWORK MANAGEMENT MEETING (Monthly) CSU FIRE TEAM MEETINGS (Monthly) 6