THE TINY LIGHTWEIGHT

Similar documents
Toilets Showers Bathrooms. Site welfare is easy.

INSTRUCTION MANUAL AMS WATER MANAGEMENT SYSTEM (AMS-WMS 230V) INSTRUCTION MANUAL AMS WMS 230V Manual Issue 1 15/10/09 Page 1 of 15

Guide book. mobile lock decontamination mobile D 3000 / 4000 / Im Geer 20, Isselburg, Germany

Experience the spectacular adventure of the open road in complete comfort with your Celtic Rambler.

Assembly Instructions SMH 3 Stage MSA

Technical data. Bathroom/shower room installations. Water services (WRAS approved)

DIESEL/PARAFFIN HEATERS

COMPRESSORS M100 MOBILAIR. Portable Compressor With the world-renowned SIGMA PROFILE Flow rate 6.4 to 10.2 m³/min ( cfm)

ALUMINUM REPAIR CERTIFICATION EQUIPMENT. Eliminate hazardous aluminum dust with a Eurovac system. BODY REPAIR CERTIFICATION EII Wet Mix Dust Collector

2019 MODEL

BSC CLASS II, TYPE A2 BIOLOGICAL SAFETY CABINET SERIES. Optimum protection of personnel, product and environment. BSC Class

CARVER CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER

Evaporator EM-1. Features. V.1. Ceiling Mount Evaporators

WASHER DRYER STACK ATE50/ATG50 MADE IN AMERICA, BUILT TO LAST SINCE 1908

2019 New Zealand Model

MRXBOXAB-ECO-LP1 100% Typical Installation. (including opposite handed versions)

DOWNDRAFT BENCH SERIES

Our room heating product range include models that run on gas or electric or. Our innovative underfloor models help vehicle designers to free up space

Technical Datasheets. Always By Your Side.

EKO Line Pellet Boiler Wood Pellet Storage Solutions And Pellet Dosage Systems

Closomat Lima Vita installation & user guide

Sirius FS. Working towards a cleaner future

CIRCULAIRE LAMINAR AIR FLOW

Trianco Ltd, Thorncliffe, Chapeltown, Sheffield, S35 2PH Telephone: Facsimile: Website:

ELECTROSTATIC FILTER 1000

Inspection Points Trailers & Fifth Wheels

PARAFFIN/DIESEL HEATER

L A signature series TA T N E RE O, A L L A T S IN

Product Catalogue WB Engineering Containers. fast inexpensive safe flexible certified

WASHER DRYER STACK ATE50/ATG50 MADE IN AMERICA, BUILT TO LAST SINCE 1908

EH0533 Indoor Climate Control

1.1. The unit shall be manufactured with quality, durability, and professionalism.

E2 Series Installation

NEW ITEMS Lab Sinks Lab Workstations S/S Countertops Custom Fabrication. Solutions for. Cleanroom & Lab

Lo-Carbon Sentinel Kinetic Horizontal

winholt Heater Proofers & Cabinets equipment

HOME INSPECTION CHECKLIST

Turboboost SHOWER PUMPS. Installation Manual. 1.5 bar and 2.0 bar

INSTALL AN ELECTRIC SHOWER

15KW ELECTRIC FAN HEATER

ADVANCE ECB ELECTRIC COMBINATION BOILER

FT900SDBD DUAL RINSE FLIGHT-TYPE DISHWASHER

USER INSTRUCTIONS FOR 0.25 LITRE MINI DEHUMIDIFIER - MODEL NO. DHMD025

room data sheet TAMURA HOUSE 396 POWELL STREET, VANCOUVER, BC 1/8 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

Boston series 5 Willerby Lodge Collection

MECHANICAL VENTILATION WITH HEAT RECOVERY (MVHR) NEW ECO RANGE

AS 50 operating manual, 2013

SHOWER PUMPS. Installation Manual. 1.5 bar and 2.0 bar

HOT WASHER MODEL NO: KING150

Benimar Sport 310 Motorhome Guide

SAFETY PRODUCTS CATALOG

Internal Fixtures & Features#

FRONT LOAD WASHER AFN50 MADE IN AMERICA, BUILT TO LAST SINCE NES3010 Retail Brochure AFN50 PRINT.indd 1

FT900BD FLIGHT-TYPE DISHWASHER

ELECTRIC HEATERS. Fireball Electric Heaters. 10,200btu HEAT OUTPUT. heating. 30,706btu HEAT OUTPUT. 9,600btu. sales hotline

PRODUCT CATALOGUE V1.3

PRODUCT CATALOGUE V1.5

CREATING A CLEANER ENVIRONMENT EAZIFLO FUME CAPTURE SYSTEM

PURest Air Dryer Installation and Maintenance

Wall Panelling. Finishing Touches. Accessories. Wall panelling See Page 170

Packaged pump solutions

Showering Accessories

Dust extraction THE SYSTEM

Xcell 270 Longlife DC wholehouse heat recovery unit

Instructions for Model E782 Betman Cleaning System (Cleaner/Rinser/Rinser/Dryer)

Alpha CombiMax 350 and 600

ACCESSORIES ITEM NUMBER. Digital timer, burning and ventilating. RT1, RT2, RT3 IT1 DA1 Thermostat for CH 12/18. fault detector.

Bowker Machinery Ltd

Bar valve with fixed and adjustable shower heads. Installation guide. Midas Plus installation instructions Page 1

Chapter 3 Cooling, heating and ventilation systems

FB-310A. Removes Chips, Sludge & Solids with Minimal Downtime

STORAGE ROLLER CABINETS & TOOL CHESTS...8 MODULES...12 FURNITURE SHOP...18 MAGNETIC ACCESSORIES...21 WORKSHOP TROLLEYS...22 METAL CHESTS...

Hamworthy Fleet Horizontal Floor Standing. Condensing Boilers Natural Gas Outputs 40kW to 350kW 5 YEAR HEAT EXCHANGER WARRANTY

evac User Manual March 2014 Prepared by: Gareth Wilson and Sinethemba Mngomezulu

Installation, Operation & Maintenance Instructions

AQ150:Midas 10/9/15 14:50 Page 1 AQ150. Thermostatic bar mixer valve with adjustable head. Installation guide

INSTALLER S MANUAL. Evaporative Air Coolers. Safety Information Installation Commissioning. Models

PELLET BURNER PV 350

WELD STRONG BREATHE FREE

Product Specifications

Sheet Ref. CSCONTENTS May Revision 0

SILENT 12 PORTABLE AIR CONDITIONER USER MANUAL

hp Dust Collector With Vacuum Attachment

Wallis & Stevens 7C. hand operated sprayer for cold bitumen emulsion. Contact: Sales at BX Plant on or

T15 Product Guide UNCOMPROMISED INDUSTRIAL-STRENGTH PERFORMANCE TO CLEAN BOTH OPEN AREAS AND TIGHT SPOTS PRODUCT HIGHLIGHTS KEY PRODUCT ENHANCEMENTS

ROTA-SPRAY PROCESSOR MODEL 1210 (ROTARY-JET) INSTRUCTIONS MEGA PART NO: &

NEW. ECO WELFARE UNIT Compact. Sustainable. Portable.

INTA ION MODERN BAR / BATH SHOWER MIXER CP

PARTS & ACCESSORIES INSTALLATION AND SAFETY INSTRCUTIONS ITEM NO.:60006PC SAFETY PRECAUTION. Canopy. Downrod. Housing. Blade. Transmitter CR2032/3V

Superior. A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler. Outputs 120, 160, 200, 240, 280 kw

room data sheet CORDOVA RESIDENCE 1/11 54 EAST CORDOVA STREET, VANCOUVER, BC RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

30KW ELECTRIC FAN HEATER

Partswasher and Workshop Solutions COMMERCIAL

The Original & Patented Self-Cleaning Vacuum Product Catalog Ridgeview Tulsa,OK

Distinction. D4000 & D4000/EURO Water Still. Assembly and Operating Instructions. 1 Issue 2

Installation, Operation & Maintenance Instructions

ROHDE MACHINERY AND EQUIPMENT HANDMADE.

Equihunter Horseboxes, Felbridge Show Centre, Copthorne Road, Felbridge, East Grinstead, West Sussex, RH19 2NU. m: +44 (0)

DEEP FRYERS CONTENTS. NT & TAS - For orders in these states please add 5% transport surcharge to your purchase price. Page. Products.

BRAHM. Working together for a crystal-clean production line COLLECTOR SERIES

Transcription:

Specification for AMS Decontamination Units THE TINY LIGHTWEIGHT DIMENSIONS & WEIGHTS: BODY LENGTH: LENGTH INC. A FRAME AND COUPLING: WIDTH: HEIGHT (INTERNAL): OVERALL HEIGHT FROM FLOOR: GROSS LADEN WEIGHT: UN-LADEN WEIGHT: DIRTY END: SHOWER AREA: CLEAN END: 2980mm 4220mm 1575mm 2010mm 2620mm 750Kg 740Kg 910x1500mm 900x1500mm 1100x1500mm

ROLLING CHASSIS The chassis is constructed completely out of galvanized rolled steel to give strength and provide long lasting durability. It is constructed in such a way as to give an inboard wheel configuration with the wheels in arches. To the chassis is fixed an Avonride galvanized axle and overrun coupling complete with parking brake and jockey wheel. The coupling and axle are connected via rod and cable. Each corner has a wind down steady to stabilize the unit once uncoupled on site. BODY The Tiny lightweight s main body is constructed out of 15mm GRP composite panels to produce a durable trailer that weighs less than 750 kilogram. This is to accommodate towing requirements thus allowing more versatility when it comes to daily transportation. All the corners are capped in anodised aluminium. Grab handles are fitted front and rear to aid manoeuvrability. Fixed ventilation is provided. The doors are fitted with flush fitting locking handles together with T handle locks for extra security, or alternatively with keypad locks. Both the dirty and clean end doors are fitted with a strong overhead door closer. ROOF The roof is constructed out of a fibreglass panel supported by galvanised roof joists inside the anodised aluminium frame. The interior ceiling is of polyester faced board. FLOOR The floor is constructed out of WBP plywood, which is treated before being bolted to the chassis. A heavy duty industrial vinyl floor covering is bonded to the floor in both the clean and dirty end s of the unit and is fully sealed to prevent any ingress of water. The shower has a heavy duty industrial vinyl fitted which has a non-slip surface. The vinyl is formed into a shower pan with the seams hot welded to ensure water tightness. Finally the tray is trimmed in aluminium. There are four drainage points set into the floor, one in the dirty end and one in the clean end. The shower area has two drainage points that are diagonally positioned within the central shower area. PARTITIONS The trailer is divided into three compartments by the fitting of partitions. These consist of 15mm GRP composite panels. Both partitions will have a centrally located door fitted with a door closer. Both doors close in the direction of the negative pressure unit to create a stronger seal. The door between the clean end and the shower area is fitted with a vent positioned towards it s base. Whilst the dirty end door has a vent fitted nearer the top with a hinged flap protecting the external (dirty) side.

INTERNAL FITTINGS A bench seat and a 600mm electric tube heater are provided in each end. In the clean end there are four coat hooks and four lockers together with a fixed mirror. Each locker has a power socket to charge respirators. 240V ELECTRICS Mains electrical feed is through a 16amp flush mounted mains inlet socket while the 6-way consumer unit complete with residual current detector ensures safety. An earth rod is supplied to ensure appropriate electrical configuration. The consumer unit enables a quick and easy detection of individual faults, whilst a lead is supplied to connect the inlet socket to an external electricity supply. Four sockets are fitted, one in each of the lockers to enable respirators to be charged. Each area has a 28 watt splash proof light fitted centrally to the roof. PLUMBING Water is heated via a sophisticated Rinnai gas boiler which is located inside the clean room allowing easy access to the boiler. Efficiency is optimised due to the fan assist feature while the balanced flue system ensures safety and complies with current regulations. The Rinnai operates at a maximum of 15 litres per minute and has an electronic ignition with variable temperature control. This allows for accurate and reliable control leaving you confident that there will be hot water when you need it. The electronic ignition result in no gas being used during standby and frost protection is a standard feature. Gas is supplied by the customer's own gas cylinder, which is located in an insulated, 30 minute fireproofed compartment located adjacent to the pump system compartment. The waste system is pumped directly from the shower tray through a twin pod filter system, firstly through a 25micron filter then a 5micron filter to provide optimum performance while complying with regulations. These filters are positioned under the front bench and are fed from all drainage points. There are four drain-off points (2 at the front and 2 at the rear) to enable the system to be completely drained down and help prevent frost damage in cold weather.

A thermostatically controlled shower unit is fitted, complete with shower head, riser and hook. A small hand basin is fitted in the shower area to facilitate the washing of masks etc. A hose and connectors are provided to enable connection to an external (mains) water supply when available. AIR EXTRACTION An AMS Negative Pressure Unit (NPU) is fitted in the dirty end beneath the bench. An NPU is a filtered extraction system that operates on a timer with the internal lights, which allows it to run for 20 minutes after the lights are switched off to cleanse the air in the unit. Air is drawn through a two-stage filtration system consisting of: - Pre-filter removes nonasbestos contaminates from the air, therefore prolonging the life of the Secondary Hepa filtration system. Hepa filter designed to remove all remaining airborne contaminants, including asbestos, down to a minimum particle size of 0.3 microns. The NPU works in conjunction with the ventilation system to draw airflow from the clean end through the partition vents to the dirty end and out through the filter. 12V ELECTRICS Full MOT lighting is fitted to the unit, which is fed via a standard 7 pin plug that is connected to the socket on the towing vehicle. Suzie / retractable cable setup can be provided on request OPTIONAL EXTRAS WATER TANK, PUMP & GAS COMPARTMENT A polypropylene water tank (100 litre) can be buildin, enclosed on the wheel arch. A, self pressure regulating pump provides water on-demand to the system thus eliminating the need to switch pump on & off. External or internal water tank filling points can be provided. Twin tank systems can be discussed if required for remote areas.

GENERATOR A Honda powered 2.7 KVA petrol/lpg generator can be included. The retractable system ensures ease of operation while the fail safe door stop prevents the generator from running while enclosed in the compartment. The generator is plug into the mains power supply point via a power lead supplied. KEYPAD LOCKS Keypad locks (with optional holdback) can be fitted to the external doors to provide keyless security. REGULATIONS All units comply with EH47/HSG247 regulations as well as British and European Standards.

ELECTRICAL SPECIFICATIONS: Supply Voltage 230v @ 50/60Hz MAINS INPUT Max. Current Draw 16A Rinnai 16i Gas Boiler water heater (electronic control) 15 litre / min 100 watt HONDA POWER GENERATOR Petrol (OPTIONAL) 2.7 Kva (2.2kW) AMS NEGATIVE PRESSURE UNIT 240W / (1.05 A) WATER SUPPLY PUMP (OPTIONAL) 1.2 A WASTE WATER PUMP Filtration Specification (pump) 0.95 A 25 micron & 5 micron NEGATIVE PRESSURE UNIT: Pre-filter Size 292 mm x 292 mm x 47 mm Pre-filter Efficiency EU4 HEPA Filter Size 305 mm x 305 mm x 117 mm HEPA Filter Efficiency 99.995% Temperature Range 0 to +45 0 C Controls On/Off Switch (15 minute timer) Protection RCD Air Flow rate 300 m³/hr = 176 CFM