Physical Map Revision Flood Insurance Study

Similar documents
FIRST AMENDMENT WATERSHED MANAGEMENT AREA 16 MASTER PLAN

MEMORANDUM. September 10, 2018

CHECKLIST FOR PHASE II DRAINAGE REPORT

Existing Conditions and Environmental Consequences Floodplains

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

FLOODPLAIN USE PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT W. Ten Mile Road Novi, MI (248)

Floodplain Management Plan 2016 Progress Report

Blake C. Kronkosky, PE, Ph.D.

City of East Point Comprehensive Floodplain Management Program

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

State Highway 5 Corridor Context Sensitive Master Plan

KYTC and NFIP: Bridging Floodplain Management and Design KAMM CONFERENCE AUGUST 25, 2015

Village of Forest Park. July 27, Sewer Separation Evaluation

Regional Mobility & the US 380 Bypass Concept. Informational Meeting February 9, 2017

Appendix E Preliminary Location Hydraulic Study

Level 1 Downstream Analysis

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

Floodplain Management Strategies in Forsyth County Georgia Association of Floodplain Management 7 th Annual Technical Conference March 2012

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system;

NAI Principles In Gwinnett County

Fixer Upper. MS4 Post-Construction and Redevelopment. Anthony Betters, CSI City of Waco Environmental Storm Water Compliance

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

AGENCY: Federal Emergency Management Agency, DHS. SUMMARY: Flood hazard determinations, which may include additions or

2015 International Code Adoption. And 2014 Electrical Code

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

Floodplain Technical Memorandum

8.5 FLOODING. Environmental Setting

3/7/2013. Compliance & Sustainability

Drexel, Barrell & Co.

Drexel, Barrell & Co.

Gadsden County Planning Commission Agenda Request

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

Please highlight flow chart where applicable and return with Form 2 and Form 3 (tab 1) to the City of St. Charles Engineering Department.

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

AGENCY: Federal Emergency Management Agency, DHS. SUMMARY: Flood hazard determinations, which may include additions or

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Master Plan Hydrology Study & Drainage Analysis Arbor Ridge Master Plan Development, City of Beaumont, CA

Decision Notice. Proposed Action

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

What Can We Do to Reduce the Impact of Floods? Joe Barron, P.E. Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

4.500 Preston Road Overlay District

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

City Council Special Meeting AGENDA ITEM NO. C.

VALUE OF URBAN DRAINAGE PLANNING AND FLOOD HAZARD REDUCTION PROJECTS IN THE 2013 FLOOD

Metropolitan Water Reclamation District of Greater Chicago. Supervising Civil Engineer

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

WARSAW WAL-MART EXPANSION FLOODPLAIN EVALUATION STUDY

TIMOTHY E. DATERS, P.E. White-Daters & Associates, Inc. 24 Rahling Circle Little Rock, AR (501)

SECTION 4(f) DE MINIMIS DOCUMENTATION

1. Project Description

Chesapeake Bay Critical Area Conservation Plan

WASHINGTON COUNTY OREGON

Draft Rhode Island Stormwater Design and Installation Standards Manual

Amy Bouska Urban Conservationist IDALS-Division of Soil Conservation

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

Northern Branch Corridor DEIS December 2011

Project Overview. Get Involved. Public Information Meeting. Contact Information

City of Fort Lupton Site Plan Process

Appendix I. Checklists

Chapter 4 - Preparation of Stormwater Site Plans

Cotton Belt Regional Rail Corridor Project

Washington County, Maryland Division of Public Works Policy Manual

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Population, Housing, and Employment Analysis

Hazard Mitigation Planning. Association of New Jersey Environmental Commissions Workshop Edison, New Jersey October 20, 2012

NYC DEP s Approach to Flood Mitigation: The Local Flood Analysis (LFA) Process

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

City of Waco Stormwater Management Regulations

APWA Expo August 27, Ground Water Recharge With Storm Management: A Sustainable Development

Nevada Floodplain Management Program

September 7, Mr. Brant Gary Director of Public Works City of Bellaire 7008 S. Rice Avenue Bellaire, Texas 77401

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Mapping and the 2013 Colorado Floods. Mapping before, during, and after

City of Fort Lupton Administrative Site Plan Process

COMPANY JERALD WINETROUB COMPANY

APPENDIX E. Flood Plain Management

C-I-10. The effect of establishing a comprehensive site review as follows will: B. Reduce the cluttered aspects of current development by:

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF DEERFIELD BEACH Request for City Commission Agenda

SEMSWA s Role in the Land Development Process

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

Figure 1 Cypress Street Study Area Location Map

Physical Approaches to Flood Mitigation

Getting the Locals to Go Along. Keys to Tulsa s Successful Floodplain Management

CITY OF MOBILE MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. November 5, 2012

Environmental Review Part 55 Floodplain Management Subpart C. 8-Step Decision Making Process

When planning stormwater management facilities, the following principles shall be applied where possible.

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

138 ATTACHMENT 17. DEPARTMENT OF THE ARMY WlLMlNGTON DISTRICT, CORPS OF ENGINEERS

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

Prado Ranch North Common Open Space Tentative Map. Washoe County Planning Commission July 3, 2018

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

Preliminary Design of Major Rehabilitation Works for the Bridge Structure on PTH 1A Over Assiniboine River and CP Rail (Bridge Site No.

Transcription:

Physical Map Revision Flood Insurance Study Collin County, Texas Over the Shoulder Review Meeting Draft Floodplain Mapping 1 October 26, 2011

Presentation Overview Introductions and Sign in Meeting Purpose and Overview Community Points of Contact Review Overview of Flood Study Process Approved LOMRs Draft Floodplain Mapping Schedule Update Information Resources Questions and Contact Information Breakout Sessions for Draft Floodplain Mapping Review 2

Introductions Introduction of Participants Name Community / Affiliation Your Department Your Role/Title Please make sure that you sign in 3

Meeting Purpose and Overview Why are we here? Provide Project Update Present Draft Floodplain Mapping Products for Community Review Review incorporated LOMRs Identify Problems and Discrepancies Earlier in the Process Project Schedule Update 4

Community Points of Contact Community Contact Name Address Telephone Email Address Allen, City of Mayor Stephen Terrell City Hall 305 Century Parkway, 1st Floor, Allen, TX 75013 214.509.4105 sterrell@cityofallen.org Allen, City of Director of Engineering - John Baumgartner, P.E. City Hall 305 Century Parkway, 1st Floor, Allen, TX 75013 214.509.4577 jbaumgartner@cityofallen.org Carrollton, City of Mayor Matthew Marchant 1945 East Jackson Road, Carrollton, TX 75006 972.466.3001 Carrollton, City of Floodplain Administrator/ Civil Engineering Manager - Mike McKay 1945 East Jackson Road, Carrollton, TX 75006 972.466.3200 mike.mckay@cityofcarrollton.com Collin County Judge Keith Self 2300 Bloomdale Road McKinney, TX 75071 972.424.1460 keith.self@collincotx.gov Collin County Director of Engineering - Ruben Delgado 825 North McDonald Street, Suite 160, McKinney, TX 75069 972.548.3738 rdelgado@collincountytx.gov Dallas, City of Mayor Mike Rawlings 1500 Marilla Street, Room 5EN, Dallas, TX 75201 214.670.4054 Dallas, City of Watershed Program Manager - Stephen Parker, P.E., C.F.M. 320 East Jefferson, Room 200, Dallas, TX 75203 214.948.4690 stephen.parker@dallascityhall.com Fairview, Town of Mayor Sim Israeloff 732 Town Place, Fairview, TX 75069 972.562.0522 mayor@fairviewtexas.org Fairview, Town of Town Engineer - James Chancellor, P.E. 500 South State Highway 5, Fairview, TX 75069 972.886.4235 jchancellor@fairviewtexas.org Frisco, City of Mayor Maher Maso 6101 Frisco Square Boulevard, Frisco, TX 75069 972.292.5100 mmaso@friscotexas.gov Frisco, City of Storm Water Engineer - Allyssa Sanders, P.E., C.F.M. 6101 Frisco Square Boulevard, 3rd Floor, Frisco, TX 75069 972.292.5438 asanders@friscotexas.gov McKinney, City of Mayor Brian Loughmiller 222 N. Tennessee Street, McKinney, TX 75069 972.547.7507 McKinney, City of Floodplain Administrator - W. Kyle Odom 222 N. Tennessee Street, McKinney, TX 75069 972.547.7500 kodom@mckinneytexas.org Plano, City of Mayor Phil Dyer 1520 Avenue K, Room 250, Plano, TX 75086 972.941.7107 phildyer@plano.gov Plano, City of Director of Public Works - Gerald Cosgrove, P.E. 1520 Avenue K, Room 250, Plano, TX 75086 972.941.7152 geraldc@plano.gov Richardson, City of Mayor Bob Townsend 411 W. Arapaho Rd, Richardson, TX 75080 972.744.4100 Richardson, City of Assistant Director of Engineering - Jim Lockart Engineering Department, 411 West Arapaho Road, Richardson, TX 75080 972.744.4280 jim.lockart@cor.gov 5

Overview of Flood Study Process FEMA Flood Study Project Phases Scoping Meeting (completed) Project Kickoff Meeting (completed) Data Acquisition & Development FIRM Production & Preliminary FIRM Issuance CCO Meeting Post Preliminary Processing 6

Flood Study Process: Scoping / Initial Coordination Initial Coordination Summary Overview of Final Scope 57 miles of stream developed on new topographic data provided by the Texas Natural Resources Information System and North Central Texas Council of Governments 11 FIRM panels to be revised 7

8 Flood Study Process: Scoping / Initial Coordination

Flood Study Process: Base Map Development Base Data Layers Imagery, political boundaries, hydrographic features, and roads data provided by the NCTCOG Effective FIRM database used for all other base data 9

Flood Study Process: Topographic Data Development Terrain source used for PMR 2009 LiDAR from TNRIS 2007 Photogrammetric Data from NCTCOG 10

Flood Study Process: Field Survey and Reconnaissance Reconnaissance performed by modeling team Field Survey Cross-sections taken at approx. every 3,000 feet and at every structure which extended 50-100 feet into overbanks Structure surveys As-built data from communities also collected 11

Flood Study Process: Flood Engineering Data Development Enhanced Product - Riverine Hydrology Rainfall-Runoff Models (HEC- HMS 3.4) Hydrology is complete and was submitted on March 21, 2011 Hydraulics 57 miles of AE Zones w/floodways (HEC-RAS 4.0.0) Hydraulics is complete and was submitted on June 30, 2011 12

Flood Study Process Products (all study types) Flood Insurance Study Preliminary FIRM GIS Database Mapping Panels Hardcopy Adobe PDF on data disk 13

LOMRs LOMRs Ongoing drainage improvement projects Outreach to communities multiple times to ensure all approved LOMRs are being incorporated It s not too late We will do the best we can to incorporate 14

LOMR INCORPORATION No. Identifier 1. West Rowlett Creek Reclamation 2. Hardin Boulevard Extension Stream 2L1 and Prairie Creek 3. 063890002 (Reissuance of LOMR Case No. 07-06-0841P) 1 4. Estancia at Ridgeview Ranch (Reissuance of LOMR 07-06-0426P) 5. Spring Lake Estates (Reissuance of LOMR 07-06-1354P) 6. Wysong Tract (Reissuance of LOMR 07-06-1407P) TPC at Craig Ranch and Craig 7. Ranch, Phase 3 (Reissuance of LOMR 08-06-1994P) 2 8. 9. 10. 11. 12. Cottonwood Branch (Reissuance of LOMR 06-06-B193P) Panther Creek (Reissuance of LOMR 04-06-1201P) 3 Watters Branch at Exchange Parkway 2 Brookfield Phase II (Reissuance of Case No. 03-06-2534P) 3 Lakes on Legacy & Heritage Lakes Subdivision (Reissuance of Case No. 99-06-817P) No. 13. Identifier Legacy Drive Estates, Phase II (Reissuance of LOMR 04-06-672P) 14. Deer Creek 15. 16. Cottonwood Creek No. 1, For Star Creek Collin County TX Rowlett Creek Exchange Parkway Westbound Lanes 17. Hunters Creek Estates 18. Anselmi Tract, APL001 (Reissuance of LOMR 07-06-0542P) 19. Hillcrest Road and Franklin Road 3 20. 8.65 Acre Tract in the SE Corner of Hillcrest Road and SH 190 Intersection (Reissuance of LOMR 98-06-1555P) 21. Ridgeview Drive 2 22. 23. Brazos Electric Co. Tract on Cottonwood Creek Chapel Creek Addition (Reissuance of LOMR 03-06-2038P) 24. Chapel Creek Addition 25 Wilson Creek Tributary (Reissuance of LOMR Case No. 06-06-B170P) 1 LOMR for Prairie Creek was superseded. 2 LOMR was partially incorporated (flood profiles and FWDTs only). 3 LOMR was partially incorporated (flood profiles, FWDTs and FIRM update for PMR area only). 15

LOMRs 16

LOMRs 17

2. Hardin Boulevard Extension - Wilson Creek, Franklin Branch, Wilson Creek Tributary 9 Case Number: 09-06-1503P (Panel 0260) Effective FIRM Revised Area Based on LOMR 18

8. Cottonwood Branch (Reissuance of LOMR 06-06-B193P) - Cottonwood Branch Case Number: 09-06-3155P (Panel 0240) Effective FIRM Revised Area Based on LOMR 19

16. Rowlett Creek Exchange Parkway Westbound Lanes - Rowlett Creek Case Number: 10-06-0963P (Panel 0380) Effective FIRM Revised Area Based on LOMR 20

17. Hunters Creek Estates - Stream 2I12 Case Number: 10-06-0997P (Panels 0370, 0380, & 0390) Effective FIRM Revised Area Based On LOMR 21

20. 8.65 Acre Tract in the SE Corner of Hillcrest Road and SH 190 Intersection (Reissuance of LOMR 98-06-1555P) - Stream 5B14 Case Number: 10-06-1941P (Panel 0370) Effective FIRM Revised Area Based On LOMR 22

Draft Floodplain Mapping Product One set of maps provided to each Community for review and comments Panels are in DRAFT form only and cannot be used for permitting or copied Please return any comments by November 9, 2011 An envelope for shipping maps back is provided and UPS labels will be provided immediately after contacting RAMPP study manager 23

Sample Draft Floodplain Mapping Panel 24

Significant Areas of Change Panel 0370 - Prairie Creek 25

Significant Areas of Change Panel 0370 - Stream 5B24 26

Significant Areas of Change Panel 0360 - Stream 5B35 27

Significant Areas of Change Panel 0360 - Stream 5B36 28

Schedule Update Preliminary Issuance Target: 12/30/11 Post Preliminary Consists of Three Stages Community Coordination Meeting Appeal Period and Resolution Map Adoption FEMA Publication 495 29

Information Resources http://www.rampp-team.com 30 30

Information Resources 31 31

Information Resources 32 32

Contact Information - Texas FEMA Project Monitor Ron Wanhanen 940-383-7334 ronald.wanhanen@fema.dhs.gov FEMA Mitigation Planning Contact Patricia Schaffer 940-898-5136 Texas NFIP Coordinator Mike Segner 512-463-3509 Texas Planning Contact Greg Pekar, SHMO 512-424-2429 Production Lead Contacts Elizabeth Levitz 713-914-6569 elizabeth_levitz@urscorp.com Andrew Cao 713-914-6515 andrew_cao@urscorp.com 33

Questions? 34

Breakouts Draft Floodplain Mapping Review 35

36