Heating and Comfort Policy. Reviewed April 2014

Similar documents
Note: Please send the original Policy with both signatures on it to the Norfolk CPU for the audit trail.

Energy Conservation Procedures

Heating & Cooling within Force Property REFERENCE NUMBER LOW EQUALITY ANALYSIS

FIRE ALARM AUDIBILITY IN EXISTING RESIDENTIAL OCCUPANCIES

Air Conditioning for Industrial and Commercial Buildings

SPACE CONDITIONING IN COMMERCIAL BUILDINGS Overview

European Researcher, 2014, Vol.(75), 5-2

White Bear Lake Area Schools District 624 ENERGY GUIDELINES

Your energy audit checklist

Passivhaus. Thompson Road and Carbis Close, Whitleigh, Plymouth. Your handy guide

Energy Efficiency HOSPITALITY.

Kills bills. How Vaillant technologies reduce home heating bills

- Murdoch University, Western Australia.

FIRE SAFETY RISK ASSESSMENT

FIRE ALARM AUDIBILITY IN EXISTING RESIDENTIAL OCCUPANCIES. 1 of 7 11/12/ :26 PM

LG Electronics AE Company, Commercial Air Conditioning

BUILDING SERVICES INFORMATION VENTILATION

1970s building housing main school reception and support offices. Well managed buildings with no significant risk of a fire occurring.

LG Electronics AE Company, Commercial Air Conditioning

Heat Pumps for Swimming Pools

The 20 Bedford Way Masterplan

Winter heating This winter heating guide includes ways to reduce heating costs and provides advice on choosing the right heater to suit your needs.

Safety Services Guidance. Arranging fire evacuation practices

Biodiversity Standard

implementation r expression in landscape

Facilities Management Services

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

Energy audit checklist

ARCHIVED. Compliance Document for New Zealand Building Code Clause G4 Ventilation Second Edition. Prepared by the Department of Building and Housing

Evacuation and Lockdown Plan

SCOPE OF ACCREDITATION

DSCR Communications Room Standards

FIRE SAFETY RISK ASSESSMENT

UNIVERSITY OF TOLEDO

Everything you need to know about Radiant Heating but didn t dare ask

Fire Risk Assessment. Guidance Notes. Location details. Risk Rating. Assessors. General notes

Adelaide Homes Design Guide 4 - Winter warming

Fire Risk Assessment

Mayor s Neighborhood Summit

High Five for Saving Energy!

HEATING - the largest part p your home's energy bill

Gemini EC. Engineered with Excellence, Specified with Confidence All-in-One Renewable Energy Climate Control

Fire Enforcement Report

Morning Announcements Energy Savings Tips for Students

Larch house and Lime house review of systems design and implementation

Rethinking Bexley Hall

TOP TEN 2018 Energy Efficiency Technologies for the U.S. Building Sector

Selection of air conditioning systems

Fire safety management issues identified by fire risk assessments

Management Standard: Fire Safety

Passivhaus. sally godber MEng CEng MIMechE WARM: Low Energy Building Practice. The first 3 in the UK.

about your house Before You Start an Energy-Efficient Retrofit Mechanical Systems

Unit 4: Science and Materials in Construction and the Built Environment. Thermal Comfort

Insight a closer look at Classroom safety

Comfort Survey Aquila Investment Gr A oup. quila Investment Group.

OAKTHORPE PRIMARY SCHOOL FIRE RISK ASSESSMENT POLICY NOVEMBER 2016

Regional Energy Efficiency Project

MAKING IT GREEN AND SAVING ENERGY WITH NSP

NHS Tayside. Fire Safety Policy

BEKA ceiling heating versus traditional underfloor heating

Electrical Safety Policy

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

Designing Quality Learning Spaces: Heating & Insulation. Developed by BRANZ Ltd for the Ministry of Education

Electrical Safety Policy and Management System

Fire Risk Assessment Borough High Street

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Residential Building Walls and Environment in Amman, Jordan

Saving energy comes naturally to us.

Safety Regulations and Procedures ENVIRONMENTAL HEALTH Indoor Air Quality - Work Practices - S New 1/95

12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE

Why Vaillant? Home Heating Guide. Because they can reduce our heating bills and our carbon footprint

Passive Solar Home Design

EVAPORATIVE COOLING How an Evaporative Cooler Works

An introduction to Part L Insulating pipes and ducts

HEAT RECOVERY SOLUTION.

RESIDENTIAL HVAC & THERMOSTAT REBATES

Safe Heating in Sheltered and Social Housing

FACT SHEET 9 Large Air-Conditioning (air-to-air)

Higher fuel prices choking you?

Museum of Bavarian History Regensburg, Germany

Holiday Shutdown Checklist 2017/2018

Guided Learning Hours (GLH) 4 Invigilated Assessment (IA) 1 Total Qualification Time (5)

AUTOMATIC FIREFIGHTING SYSTEMS IN HOSPITALS

Fire Risk Management Policy. UK September 2017

Victoria & Albert Museum, London Medieval & Renaissance Galleries: A Passive Approach to Humidity Control

Content Rev

Multifamily Weatherization:

Code of Practice on Closed Circuit Television (CCTV)

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

EH1210. airooncentre.co.uk. Peltier Dehumidifier Déshumidificateur Peltier. The Award Winning Ventilation Specialists

Regulatory Reform (Fire Safety) Order A short guide to making your premises safe from fire

Emergency Evacuation Procedures

Mini Tender Section 1.1 External Wall Insulation, Mechanical and Electrical Installation

MECHANICAL SERVICES 101. Ian White

SPACE HEATING AND COOLING A.M. NARAYANAN

SUNWARM AIR SOLAR PRE-HEAT VENTILATION SYSTEM

POLICY FOR THE SAFE WORKING WITH ELECTRICITY

Introduction. Products conforming with a European Council Directive. CE marked construction products. Other regulations

SECTION 915 CARBON MONOXIDE DETECTION

Overheating Analysis and Remedial Works Recommendations Report

Transcription:

Heating and Comfort Policy Reviewed April 2014

1. INTRODUCTION The University of Worcester endeavours to maintain a comfort temperature of between 19 o and 23 o C throughout all academic, office and residential areas. There is a certain amount of difficulty in satisfying everyone s comfort needs all of the time, so your co-operation and tolerance on this matter is greatly appreciated. If you do experience continued periods of uncomfortable office temperatures (below 19 o C or over 28 o C), please report to the Facilities Department https://eris.worc.ac.uk/customerportal/ Some variations in temperature will be unavoidable due to the age and fabric of some of the campus infrastructure. Staff and students should bear this in mind when evaluating their feeling of comfort when moving around the University. 2. HEATING PERIODS The University provides heating from the 1 st October to 30 th April. These dates may be amended if the weather is unseasonal. Campus users can normally expect optimised temperatures of 19-23 C, where possible boiler plant activation is based on outside air temperature to improve comfort. Optimised temperature hours are as follows: Office Areas 08:00 17:30 Teaching Areas 09:00 21:00 Pierson Study Facility 24hrs Arena 08:00 22:00 Residential Buildings will be heated from 7:00 to 23:00 however, heating will be switched off for an hour every two hours it is operating to conserve energy. This will not affect the comfort of residents in halls. The Estates & Facilities team is responsible for the management and control of Heating Systems. 3. DOMESTIC HOT WATER The University provides Hot Water throughout the year according to the following time schedules: Office & Teaching areas 07:30 21:00 Residential Areas 06:00 23:00 Pierson Study Facility 24hrs Arena 08:00 22:00 Many flats have electrically heated showers which provide hot water on demand. These flats will be made available for students who need to rise early for their course. 4. SUMMER CONDITIONS (01 May 01 October) As a general rule, the University does not control temperature, as the environmental and financial consequences of doing so are unfavourable. Room occupants are therefore asked to cope with any high summertime temperatures by opening windows and using the curtains or blinds that are provided. 2

The University will consider the use of either mechanical or refrigerant air-conditioning in places where: Natural ventilation is insufficient for oxygen replenishment and air movement Ventilation is required to remove stale, hot or noxious fumes Room processes require close temperature control The combined effects of the heat input from people, lights, machinery and solar gain cause the room temperature to consistently rise above 28 o C and where all other options have been exploited (this is typically if the heat load exceeds 40W/m 2 ) If members of staff require cooling, this must be financed by bidding for cooling as part of the annual budgeting process but as a general rule please note the university does not provide air conditioning except for example in data rooms. 5. HOW YOU CAN HELP TO SAVE ENERGY AND STAY COMFORTABLE ALL YEAR ROUND There are several measures that staff and students can take to limit the extremes of temperature and help to save energy: Dress appropriately for the weather; keep a jumper in your office during the winter months in case it gets chilly Drink hot or cold drinks depending on the conditions Only open windows when your workplace is stuffy, or if your heaters are off and you need to cool the rooms down Make use of window blinds and curtains in hot weather to reduce solar gain Make use of flexible work times where appropriate to avoids extremes of temperature Take regular breaks and don t stay in a sedentary position throughout the day Don t block radiators or coolers with absorbent furniture Switch off unnecessary electrical equipment and lighting, particularly in summer as these can contribute significantly to heat gain In times of high temperatures, ensure that doors and windows are open to increase the natural air flow Turn down the thermostat if the room is too warm and refrain from opening windows. 6. USE OF PERSONAL EQUIPMENT Desk fans and heaters may be used providing that they have been PAT tested. For more information, contact the Maintenance Team at https://eris.worc.ac.uk/customerportal/ 7. SPECIAL CIRCUMSTANCES 3

The University is sympathetic to international students and people with disabilities and is prepared to consider temporary individual specific requirements outside the scope of this guidance. A Cooling Policy is attached at Appendix A. KB April 2014 APPENDIX A COOLING POLICY 1. As a general rule the University will not fund the installation and running costs of airconditioning systems unless they are required: By regulation or enforceable code of practice By specific items of equipment such as server rooms Because natural ventilation is insufficient to remove heat gains and/or provide the necessary changes of air Because occupants and/or equipment consistently raise the ambient temperature to above 28 o C for a minimum period of two hours. 2. Air-conditioning will not be installed in any residential building with the exception of office areas in such buildings, providing they meet the installation criteria. 3. Where areas are overheating, a thorough appraisal will be carried out to ensure that all alternative options have been considered before air-conditioning is installed. These will include: Ensuring any heating is not operating in the area and hot pipes are insulated Providing window blinds and/or desk or ceiling fans Installing window film and/or solar shading devices Managing the use of heat-producing equipment to reduce heat gains 4. The use of mechanical ventilation is preferred to full air-conditioning. If it is deemed that cooling requires to be installed then the users and the Director of Physical Resources will need to agree on the cooling strategy before detailed design begins. All installed cooling equipment should: Be as energy-efficient as possible Interface with the building energy management system, and Contain refrigerant gases that have zero ozone depletion potential 5. Where air-conditioning is already installed, the space temperature should be set no lower that 23 o C and the system set to provide cooling only when the space is occupied. All doors and windows of the conditioned space should remain closed and no portable heaters should be in operation to warm up an over-cooled space. 6. Portable air-conditioning units are not permitted for use in the University buildings unless they are installed with a permanent extract duct. Desk fans may be used provided that they have been PAT tested. 4

5