RESOLUTION NO WHEREAS the City of Kalama reviews annually and sets fees for services by resolution of the City Council;

Similar documents
TABLE 3A BUILDING PERMIT AND PLAN REVIEW FEES

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply:

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Perris as follows:

Exhibit A. Mechnical, Plumbing, and Electrical Plan Check and Inspection Fees. Total Cost Per Unit FEE TYPES MECHANICAL PERMIT FEES

CITY OF COOLIDGE BUILDING PERMIT FEE SCHEDULE AS APPROVED AND ADOPTED BY THE

SMC FEE TYPE CURRENT FEE DESCRIPTION/DETAIL

City of Calabasas Building and Safety Division Fee Schedule

Schedule of Approved Fees

STRUCTURAL PERMIT FEES Fees Effective: August 1, 2017

Building Permit Fees (cont.)

Charter Township of Flushing Construction Permit Fee Schedule.Construction and Development Services Department

Building & Safety PERMIT APPLICATION

City of Bullhead City PERMIT VALUATIONS AND FEES

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT BUILDING INSPECTION SERVICE FEE SCHEDULE

This fee schedule is for Building Inspection Fees only.

ORDINANCE NO. BE IT ORDAINED, by the Township Committee of the Township of Neptune, County of Monmouth, State of New Jersey, as follows:

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

Schedule of Fees Schedule B

ORDINANCE NO

Commercial, Manufacturing and Industrial: Office Areas.18/total sq. ft. Agricultural buildings, detached garages, and accessory.15/total sq. ft.

BUILDING PERMIT FEE SCHEDULE

BUILDING PERMIT FEES

Valuation Revenue Plan Check State Surcharge , ,200.00

ORDINANCE NO WHEREAS, the City of Kalama has many areas of timberland and open areas inside its City limits adjacent to residential areas;

City of Gainesville Inspection Permitting Fees Effective July 1, 2012

2. Building Code Permits and Related Fees 2018

Comprehensive Inspection Agency (CIA) RESIDENTIAL & COMMERCIAL FEE SCHEDULE

Village of Newburgh Heights Building Department 3801 Harvard Avenue Newburgh Heights, OH Phone: (216) Fax: (216)

Read Only Document Not For Distribution

MH Non-Residential Permit Fees All Commercial Permit fees require a 3% BBS State Tax and are subject to a plan review and base fee.

SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT

CHAPTER 9 SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL BURNING EQUIPMENT

DOUGLAS L. BARRY FIRE CHIEF

CITY OF NOVI COMMUNITY DEVELOPMENT DEPARTMENT

SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT

SCHEDULE OF FEES. $0.25 per page. Actual cost. No-lien letter $15 Return check charge $20 Tax certification $15 Duplicate real estate tax bill $5

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

Building Department Informational Handout

CHAPTER 10 TRAPS AND INTERCEPTORS

Comprehensive Inspection. (CIA) RESDENTAL & COMMERCIAL

BUILDING DEPARTMENT FEE SCHEDULE

Richmond County Building Inspections

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

UNIFORM MECHANICAL CODE

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

SIGNIFICANT CHANGES TO MINOR WORK AND ORDINARY MAINTENANCE

Inspection Checklist Mechanical Rough in

WHEREAS, the Water Financial Plan was presented to the public for comment and was adopted by the

NYC Department of Education

Land Map Number BUILDING PERMIT # PROJECT Street Address: Owner: Street Address: City State Zip Phone. Building Contractor: Street Address:

PLAN REVIEW SUBMITTAL GUIDE

NYC Department of Education

NYC Department of Education

THE VILLAGE OF HAWTHORN WOODS PLUMBING CODE

City of Santa Monica Fee Schedule Effective July 1, 2012

Food Service Plan Review Information

NYC Department of Education

NYC Department of Education

City of Lake Dallas Master Fee Schedule Fiscal Year 2018

NYC Department of Education

SaskPower Gas Inspections Schedule of Fees

APPENDIX L ALTERNATE PLUMBING SYSTEMS

Definitions; contractors licensed by Board; examination; posting license, etc.

VILLAGE OF LOMBARD COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION PERMIT FEES. VILLAGE OF LOMBARD 255 E. Wilson Avenue Lombard, IL 60148

Effingham County Health Department "Where Prevention Begins" 901 West Virginia Phone (217) Effingham, Illinois Fax (217)

Cook - Wissahickon Elementary School

ADAMS COUNTY HEALTH DEPARTMENT PLAN REVIEW APPLICATION FOR FOOD ESTABLISHMENTS This is not a Food Establishment application. Fees are non refundable

CITY OF SNOHOMISH Snohomish, Washington ORDINANCE 2192

CHAPTER 9 VENTS SECTION

August 15, 2013 Page 1 of 19

NYC Department of Education

NYC Department of Education

High Performance Building Guide 1

Volume Title: The Measurement of Durable Goods Prices. Volume URL:

BY REPRESENTATIVE(S) Casso, Fischer, Frangas, Hullinghorst, Kagan, Labuda, Pace, Soper, Vigil, Carroll T.; also SENATOR(S) Tochtrop.

NYC Department of Education

FOOD ESTABLISHMENT PLAN REVIEW APPLICATION TO BE COMPLETED AND SUBMITTED TO:

Mechanical System Description

GARCIA GALUSKA DESOUSA Consulting Engineers

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

SPECIFIC APPLIANCES CHAPTER 6

Welcome to Voice Permits

NYC Department of Education

TABLE OF CONTENTS. Part I Administrative

NYC Department of Education

NYC Department of Education

INSPECTION OF COMMERCIAL KITCHEN PLUMBING

Minimum Requirements for Food Establishments (per the Texas Food Establishment Rules (TFER) 25 TAC 228)

CHAPTER 10 TRAPS AND INTERCEPTORS The vent pipe opening from a soil or waste No more than one (1) approved slip joint

NYC Department of Education

Level I Chapter 1 Worksheet

RESOLUTION 15-R-211. DCA: 1.5 Percent of all base building permits fees - $2.00 minim um (DCA: Department of Community Affairs- FloridaStatute553.

COMMERCIAL PLUMBING & MECHANICAL PERMIT SUBMITTAL REQUIREMENTS

RESOLUTION NO R (Amending: R, R, R, R, R, R)

Community Development Department Commercial Permit Application

Secondary Suites. Guidelines for the construction of Accessory Secondary Suites in the City of Abbotsford August

CONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA

Transcription:

RESOLUTION NO. 660 A RESOLUTION OF THE CITY OF KALAMA, COWLITZ COUNTY, WASHINGTON, SETTING FEES FOR BUILDING PERMITS AND RELATED MATTERS AS OF JANUARY 2018 WHEREAS the City of Kalama reviews annually and sets fees for services by resolution of the City Council; WHEREAS the City Council held a public hearing and review the proposed new fees and increases on October 18, 2017 NOW THEREFORE be it resolved by the City Council of the City of Kalama Resolution No 648 is repealed and replaced by Resolution No. 660 as follows: SECTION 1: Building Permit Fees. Fees for building permits are due at the time of permit issuance and shall be calculated according to the table below: Value Permit Fee $1.00 to $500 $32.00 $501 to $2,000 $32.00 for the first $500 plus $4.25 for each additional $100 $2,001 to $25,000 $ 95.75 for the first $2,000 plus 16.00 for each additional $1,000 $25,001 to $50,000 $463.75 for the first $25,000 plus $12.00 for each additional $1,000 $50,001 to $100,000 $763.75 for the first $50,000 plus $8.75 for each additional $1,000 $100,001 to $500,000 $1201.25 for the first $100,000 plus$ 7.00 for each additional $1,000 $500,001 to $1,000,000 $4001.25 for the first $500,000 plus$6.20 for each additional $1,000 $1,000,001 and up $7101.25 for the first $1,000,000 plus $5.00 for each additional $1,000 SECTION 2: Plan Review Fee. The fee for reviewing plans for building permits is 65 percent of the building permit fee paid at the time of plan submittal. If an applicant submits all at the same time, plans for identical buildings for one or two-family dwellings under the International Residential Code, the plan review fee shall be 50 percent of the plan review fee for the first one submitted. These fees are in addition to the permit fees Resolution 616 1

in Section 1. SECTION 3: Plumbing Permit Fees. The fees for plumbing and gas piping permits include both a permit issuance fee and a unit fee. The fees are calculated according to the table below: Permit Issuance Fees For issuing each permit 25.00 For issuing each supplemental permit 13.00 Unit Fee Schedule (in addition to the above) For each plumbing fixture on one trap or a set of fixtures on one trap, (including water drainage piping and backflow protection therefore) Up.25 ea 8.75 For each building sewer and each trailer park sewer 17.00 Rainwater systems per drain (inside building) 8.75 For each private sewage disposal system 42.00 For each water heater and/or vent 8.75 For each gas piping system of one to five outlets 5. 75 For each additional gas piping system outlet (per outlet) 1.25 For each industrial water pretreatment interceptor including the trap and vent, except kitchen-type grease interceptors functioning as fixture traps For each installation, alteration or repair of water piping and/or water treating equipment 8.75 8.75 each For each repair or alteration of drainage or vent piping, each fixture 8.75 For each lawn sprinkler system on any one meter including backflow protection devises therefore For atmospheric-type vacuum breakers not included in item above 1-5 Over 5, For each backflow protective device other than atmospheric type vacuum breakers: 2 inch (51 mm) diameter and smaller Over 2 inch (51mm) diameter 8.75 5.75 1.00 each 8.75 16.00 For each gray water system 42.00 Resolution 616 2

For initial installation and testing for a reclaimed water system 32.00 For each annual cross-connection testing of a reclaimed water system (excluding initial test) For each medical gas piping system service one to five inlet(s)/outlet(s)for a specific gas 32.00 50.00 For each additional medical gas inlet(s)/outlet(s) 31.00 SECTION 4: Mechanical Fee. The fees for mechanical and gas piping permits include both a permit issuance fee and a unit fee. The fees are calculated according to the table below: Permit Issuance Fee For the issuance of each mechanical permit 25.00 For issuing each supplemental permit for which the original permit has not expired, been canceled or finale 13.00 Unit Fee Schedule (in addition to 1 and 2 above) 1 Furnaces For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h (29.3 kw) $21.20 For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h (29.3 kw) 15.50 For the installation or relocation of each floor furnace, including vent 15.50 For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater 2 Appliance Vents $8.75 Resolution 616 3

For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit 3 Repairs or Additions For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code 4 Boilers, Compressors and Absorption Systems For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6 kw), or each absorption system to and including 100,000 Btu/h (29.3 kw) For the installation or relocation of each boiler or compressor over three horsepower (10.6 kw) to and including 15 horsepower (52.7 kw), or each absorption system over 100,000 Btu/h (29.3 kw) to and including 500,000 Btu/h (146.6 kw) For the installation or relocation of each boiler or compressor over 15 horsepower (52.7 kw) to and including 30 horsepower (105.5 kw), or each absorption system over 500,000 Btu/h (146.6 kw) to and including 1,000,000 Btu/h (293.1 kw) For the installation or relocation of each boiler or compressor over 30 horsepower (105.5 kw) to and including 50 horsepower (176 kw), or each absorption system over 1,000,000 Btu/h (293.1 kw) to and including 1,750,000 Btu/h (512.9 kw) For the installation or relocation of each boiler or compressor over 50 horsepower (176 kw), or each absorption system over 1,750,000 Btu/h (512.9 kw) 5 Air Handlers For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4719 L/s), including ducts attached thereto $26.00 $36.00 $51.00 $100.00 Resolution 616 4

Note: This fee does not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code. For each air-handling unit over 10,000 cfm (4719 L/s) $21.00 6 Evaporative Coolers For each evaporative cooler other than portable type 7 Ventilation and Exhaust For each ventilation fan connected to a single duct For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit $8.75 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood 8 Incinerators For the installation or relocation of each domestic-type incinerator For the installation or relocation of each commercial or industrial type incinerator $21.00 $35.00 9 Miscellaneous For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which no other fee is listed in the table 10 Gas Piping Gas Piping One to Five outlets For each additional outlet 11 Process Piping For hazardous process piping system (HPP) one to four outlets $8.75 $7.00 $1.00 $7.00 For hazardous process piping system (HPP) of five or more $1.00 Resolution 616 5

outlets, per outlet For non hazardous process piping system (NPP) one to four outlets For non hazardous process piping system (NPP) of five or more outlets, per outlet $2.50 $1.00 Section 5: according to the table below: Excavation and Grading plan review fees. The fees are calculated Value Plan Review Fee 50 cubic yards or less No fee 51 to 100 cubic yards $27.00 101 to 1000 cubic yards $42.00 1001 to 10,000 cubic yards $55.00 10,001 to 100,000 cubic yards $55.00 for the first 10,000 cubic yards plus $26.50 for each additional 10,000 100,001 to 200,000 cubic yards $293.50 for the first 100,000 cubic yards plus for each additional 10,000 200,001 cubic yards or more $ 433.00 for the first 200,000 cubic yards plus $9.50 for each additional 10,000 Section 6. according to the table below: Excavation and Grading Permit Fees. The fees are calculated Value Permit Fee 50 cubic yards or less $ 27.00 51 to 100 cubic yards $ 42.00 101 to 1000 cubic yards $42.00 for the first 100 cubic yards plus $20.00 for each additional 100 cubic Resolution 616 6

yards or fraction thereof. 1001 to 10,000 cubic yards $222.00 for the first 1000 cubic yards plus $16.50 for each additional 1000 10,001 to 100,000 cubic yards $370.50 for the first 10,000 cubic yards plus $70.50 for each additional 10,000 100,001 cubic yards or more $1005.00 for the first 100,000 cubic yards plus $38.50 for each additional 10,000 Section 7. Other Fees. Fees for other services are as follows: Type of service Permit Fee Inspection outside of normal business hours $100 Re-inspection $100 Manufactured Home Placement Permit $500 Residential/Commercial Fire Inspections $250 Fire Investigations ( actual costs will be charged if investigation is preformed by an outside agency) $100 Installation of woodstove $100 Re-roof Residential $100 Commercial Re-roof Bid Price Inspection for which no fee is specifically indicated $100 Additional Plan Review required by changes, additions or revisions to plans minimum charge 2 hour Demolitions Residential $100 $50 Flat Fee Use of outside consultants for plan checking and/or inspections Actual Cost + 10% Non-Compliance Failure to obtain a Permit Permit fees doubles Section 8. Residential Valuation per Square Foot Used to calculate Value of Project being permitted. Single Family New House/Duplex $92 Per Square Foot Resolution 616 7

Tri-Plex or Multy-Family Addition Garage Pole Building Carport/Patio Cover Wood Deck Wood Deck with Roof Cover $90 Per Square Foot $75 Per Square Foot $36 Per Square Foot $24 Per Square Foot $19 Per Square Foot $15 Per Square Foot $25 Per Square Foot Section 9. Washington State Building Code Surcharge For Each Building Permit: $4.50 For Residential Multi-Unit Structures: $4.50 for each Permit issued PLUS $2.00 per Dwelling Unit after the first. Be it further resolved this resolution will take effect upon its passage by the City Council. Passed by the City Council of the City of Kalama at a regular meeting held on, 2017. ATTEST: Pete Poulsen, Mayor Coni McMaster, Clerk/Treasurer Approved as to Form: City Attorney Resolution 616 8