Chapter 1. Introduction

Similar documents
Heights, Elk Grove, Folsom, Galt, Rancho Cordova and Sacramento. For more information, see the Glossary.

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

Storm Water Design Control Measures. Today s municipal sponsors

3. Are there any projects exempt from the definition of Regulated Projects?

Post - Construction Hydromodification Development Requirements

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

Technical guidance to meet stormwater management design requirements; and,

Working Group Meeting

ROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP)

Background / Regulatory Requirements

City of Richland Stormwater Management Plan

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Chapter 4 - Preparation of Stormwater Site Plans

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS

Huntington Stormwater Utility

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

Low Impact Development in Coastal South Carolina: A Planning and Design Guide

Draft Rhode Island Stormwater Design and Installation Standards Manual

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

PRELIMINARY PROJECT REVIEW PROCESS

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ORDINANCE NO WHEREAS, the City provided the proposed code amendments to the Washington State Department of Commerce on September 20, 2017; and

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Stormwater Management Guidance Manual: Customizing and optimizing stormwater requirements for port-specific land uses and customers.

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

Project phasing plan (if applicable) 12 copies of site plan

Weston s Wetlands, Stormwater, & Open Space

A P P E N D I X D. Project Stormwater Plan Worksheets

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Prepared for: Central Coast Low Impact Development Initiative centralcoastlidi.org

Worksheet #14 Water Runoff Management

UNIVERSITY OF NORTHERN IOWA

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

Item 10E 1 of 5

Ventura County Stormwater Technical Guidance Manual

Stormwater Control Plan: Small (Tier 1) Land Development Project

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

[TEMPLATE FOR] STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. [date] [revision date]

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

New Tools/Resources for

Highlands Region Stormwater Management Program Guidance

Preparing Permit Application Submittals

Each Permittee s program must meet the requirements of the Los Angeles County municipal storm water permit (Permit), as summarized in Table 5-1.

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Stormwater Technical Guide

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

New Development Stormwater Guidelines

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

Introduction Post Construction Stormwater Management Performance Requirements

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

Rebecca Dohn October 13, 2017

a great new program that helps make the best use of something we re all familiar with - rainwater. Building a Better Long Beach

Three threshold measures will be applied together to capture project scale and scope and impacts:

Coffee Creek Park Development Low Impact Development (LID)

Water Efficiency Ordinance ZCA No El Monte City Council June 7, 2016

CHOOSING A LANDSCAPE PROFESSIONAL FOR YOUR RIVER-FRIENDLY GARDEN

September 22, IDDE & Storm Drain Maintenance Requirements Steve Teravskis, WGR Southwest, Inc.

WASHINGTON COUNTY OREGON

Low-Impact Development Code Update. Thurston County Community Stakeholder Group June 25, 2015

Green Infrastructure Recommendations For Parks and Public Spaces

Appendix I. Checklists

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

Chapter 1: General Program Information

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

USF System Campus Master Plan Updates Goals, Objectives and Policies

Green Infrastructure and LID Practice Construction Workshop

OC DEVELOPMENT SERVICES REPORT. Public Hearing Proposed Zoning Code Amendment CA County of Orange Landscape Irrigation Code

Preparing a Stormwater Control Plan for a Small Land Development Project

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. Example Commercial Project. February 21, 2018

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

COUNTY OF PRINCE WILLIAM 5 County Complex Court, Suite 120 Prince William, Virginia (703) Metro Fax: (703)

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1

NAPA COUNTY PUBLIC WORKS Standards & Specifications

County of Fairfax, Virginia

Low Impact Development Site Design

POST- CONSTRUCTION STANDARDS PLAN

SEMSWA s Role in the Land Development Process

Update on the State of California Model Water Efficient Landscape Ordinance (CA MWELO)

Zoning Ordinance Article 3

Title of Program: Residential Rain Garden Program Facilitator s Guide Number of Sessions: One Date of Publication: 12/2014

Stormwater Runoff and the District of Columbia RiverSmart Homes Defined:

CITY OF HOLLY SPRINGS STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax:

Planning and Growth Management Committee

Planning & Development. Background. Subject Lands

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

5/22/2012. Low Impact Development through NPDES Permits TAKE AWAY MESSAGES. Municipal Stormwater NPDES Permits

MONTGOMERY COUNTY PLANNING DEPARTMENT

Transcription:

Chapter 1. Introduction Purpose This (manual) outlines planning tools and requirements to reduce urban runoff pollution to the maximum extent practicable (MEP) from new development and redevelopment projects. This manual is a collaborative effort of the Sacramento Stormwater Quality Partnership 1 and is intended to satisfy the regulatory requirements of their respective municipal stormwater permits. (See the section Background Information later in this chapter for more about the Partnership and permit requirements.) Goals This Design Manual This comprehensive manual outlines a consistent set of stormwater quality management design standards for many new and redevelopment projects in the urbanized parts of Sacramento County. It provides planning and design tools for use by planners, architects, landscape architects, engineers, and environmental professionals. The Sacramento permitting agencies have the following goals for this manual: Protect the quality of our local creeks and rivers. Consolidate all stormwater quality design requirements into one document. Provide a consistent set of requirements for stormwater quality management that apply in the urbanized part of Sacramento County; this is intended to facilitate better area-wide compliance with clean water laws. Promote the consideration of stormwater management early in the site planning and project design process; the optimal, most cost-effective approach often involves integrating stormwater controls into overall site design. Provide tools and criteria (including maintenance and construction considerations) for selecting and designing a range of stormwater quality control measures. Incorporate recommendations of the local vector control districts so that stormwater quality control facilities do not create mosquito breeding habitat. The stormwater quality development standards are intended to protect our valuable creek and river resources for future generations. Photo source: Shutterstock.com 1 The Sacramento Stormwater Quality Partnership includes the County of Sacramento and the Cities of Citrus Heights, Elk Grove, Folsom, Galt, Rancho Cordova and Sacramento. For more information, see the Glossary. Page 1-1

Background Information Under the federal Clean Water Act, stormwater discharges are regulated through National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Permits. In California, the State Water Board and its nine Regional Boards oversee implementation of the Clean Water Act, and the Central Valley Regional Water Quality Board (Regional Board) issues and enforces NPDES stormwater permits and the State water quality law, Porter Cologne, within the Central Valley. Phase I NPDES permits have been issued to municipalities with a population greater than 100,000 (and certain industries and construction projects) since 1990. The Regional Board began issuing Phase II NPDES general permits to smaller municipalities in 2003. Municipal stormwater permits require municipalities to regulate and manage the quality of urban runoff throughout their jurisdictions, including runoff from new development and significant redevelopment projects. Sacramento Areawide Stormwater Permit Requirements The Sacramento Areawide NPDES Municipal Stormwater Permit is a Phase I permit and applies to the County of Sacramento along with the Cities of Citrus Heights, Elk Grove, Folsom, Galt, Rancho Cordova and Sacramento. Originally issued in 1990, the Sacramento stormwater permit has been reissued several times. The most recent permit (NPDES Permit No. CAS082597) was adopted in December 2002, reissued in September 2008, and reissued again in April 2015. The Central Valley Water Board replaced it with a Region-wide MS4 Permit in June 2016. The Permittees function independently on many tasks, including reviewing, processing and permitting plans for new development and redevelopment in their respective jurisdictions. However, they work together on other tasks and projects, such as the creation of this manual. This manual is an outgrowth of prior steps taken to comply with the municipal stormwater permit. The Permittees (collectively referred to as the Sacramento Stormwater Quality Partnership, or Partnership) began conditioning development projects in Sacramento County to include stormwater quality control measures in the mid 1990 s. The City and County of Sacramento published the Guidance Manual for On-Site Stormwater Quality Control Measures in January 2000; that document was widely referenced by all the Permittees and has since been replaced by this manual. This manual is the second edition of the Stormwater Quality Design Manual for the Sacramento Region, replacing the May 2007 version. In July 2003, the Permittees published their Stormwater Quality Improvement Plans, which described their comprehensive program to comply with their municipal stormwater permit and reduce pollutants in urban runoff to the maximum extent practicable. The New Development program element of the plans called for an assessment of existing development standards and amendment/adoption of new standards as needed to better address the permit. (As used here, the term development standards collectively refers to the policies, ordinances, codes and design standards established and enforced by each of the permitting agencies.) In December 2003, the Partnership submitted a Development Standards Plan (DSP) to the Regional Board; the DSP assessed the existing development standards (as of 2003) and proposed actions that Page 1-2

would be taken to amend the standards within one year of approval of the DSP. The Regional Board officially approved the DSP on May 18, 2005 and gave the Permittees until May 18, 2006 to complete the process of amending/adopting new standards. According to the municipal stormwater permit, the Permittees had until May 18, 2007 to publish technical design guidelines to help the development community understand and implement the new standards. The required technical guidance was initially developed in the 2007 version of this manual. The 2018 version of the manual expands upon the 2007 version to address more prescriptive LID requirements, new hydromodification management requirements, and full capture trash requirements, as required in the 2016 MS4 General Permit. The DSP affected the types of projects subject to this manual. The Sacramento municipal stormwater permit specifies different categories of new development and redevelopment projects that are subject to development standards related to stormwater quality management. Some of the categories and corresponding thresholds specified in the stormwater permit were effectively modified when the Regional Board approved the DSP in May 2005. Those changes are reflected in this manual (Table 1-2, Table 3-2 and Table 3-3). Agency Collaboration in Developing this Manual This manual is the result of a collaborative planning effort by a steering committee comprised of managers and staff from the following agencies: County of Sacramento, Department of Water Resources City of Rancho Cordova, Department of Public Works City of Sacramento, Department of Utilities City of Citrus Heights, General Services Department, Engineering Division City of Elk Grove, Department of Development Services/Public Works City of Folsom, Department of Public Works City of Galt, Department of Public Works In addition, the local vector control districts were consulted, since several types of stormwater quality control measures could have the potential to support mosquito breeding habitat, if not properly designed, constructed and maintained. Other contributors included local sanitation districts, fire departments and districts and solid waste interests. Using the Manual Intended Audience This manual is primarily intended for people involved in the design or review/approval of development projects. Table 1-1 lists the different professionals who typically should be involved at each phase of a project. It is important to involve many different design professionals early in the planning process when the initial site layout is determined. It is equally important that those involved in site planning and design work collaboratively throughout the site design process; that way, Page 1-3

stormwater quality features can be optimally integrated into the site and project design. Benefits of the collaborative team approach and strategies for involving everyone throughout the process are discussed more in Chapter 2, Integrated Approach to Stormwater Management. The manual also contains some information related to construction and maintenance of stormwater quality facilities; therefore, it may be used by contractors, inspectors, property owners and others as shown in Table 1-1. Finally, the manual may be used by developers, elected and appointed public agency officials, environmental regulatory agencies and interested citizens. Projects Covered by the Manual Table 1-2 lists the types of projects and land uses generally addressed by this manual. If a project falls into one of those categories, see Table 3-2 and Table 3-3 (in Chapter 3, Steps to Managing Stormwater Quality) to see if the project meets the size threshold that triggers the requirements and, if so, to see which specific requirements apply. Development projects potentially subject to this manual include both new development as well as "significant redevelopment" projects. Significant redevelopment means land-disturbing activities on an already developed site. It includes but not limited to: expansion of a building footprint; replacement of a structure; replacement of impervious surface that is not part of routine maintenance activity; and land-disturbing activities related to structural or impervious surfaces. For redevelopment projects subject to this manual, the applicable design standards apply only to the redeveloped area, and not to the entire site, except in cases where untreated drainage from the existing developed portion is allowed to enter/flow through the redeveloped portion. In such cases, any new required treatment control measures must be designed for the entire contributing drainage area. Redevelopment and infill project applicants should check with the local permitting agency at the start of project design to verify whether or not the manual requirements apply. Page 1-4

Table 1-1 Applying the Design Manual to Every Phase of Development Project Phase Typical Decisions/Activities Professionals Involved Initial site layout and planning Site improvement design Building design Landscape and irrigation design Construction Maintenance Building and parking footprints; site access; preservation/integration of existing natural resource features (trees and other vegetation, creek buffers, wetlands, vernal pools, open space); use of natural or existing depressions for siting certain stormwater quality features; identification of existing sewer and drainage facilities; preliminary on-site soils testing to determine which stormwater quality features will work on the site Site contouring and grading; on-site drainage and connections to municipal system; other utilities (sanitary sewer, water, power); pavement selection for parking, roads and walkways Final building footprint; building access; roof type and materials; roof drainage/downspout system; location/type water features (e.g., ponds, waterfalls, fountains); location of landscaping around the building (and possibly selection of vegetation type/style to complement building design or provide consistency with existing vegetation to be preserved on site or in the surrounding area) Final selection of type of trees and other vegetation; final contouring of landscaped areas; installation of vegetation and bark/other ground cover materials; design and installation of irrigation system; construction of water features Installation of stormwater quality facilities; installation of erosion and sediment control measures to protect the facilities from receiving high sediment loads during construction process; final clean-out and preparation of stormwater facilities prior to permitting agency acceptance Building, grounds and landscape maintenance, including maintenance of vegetated stormwater quality facilities (mowing, watering schedule, application of fertilizers, herbicides and insecticides, replacing/repairing damaged vegetation and eroded areas) Architects; planners; environmental consultants; geotechnical and drainage engineers; landscape architects; arborists; and permitting agency planning and engineering staff (initial consultations and preapplication meetings) Civil and other engineers; landscape architects; permitting agency plan review staff (drainage engineers, traffic, fire, etc.) Architects; civil/structural, geotechnical and other engineers as appropriate Landscape architects; municipal arborists; wetland specialists/biologists if applicable Contractors; erosion control specialists; permitting agency inspectors Property owners and managers; maintenance and landscape contractors; permitting agency maintenance staff Page 1-5

Table 1-2 Types of Projects Addressed by This Manual Priority Project Category 2 Single Family Residential Multi-Family Residential Commercial and Light Industrial Automotive Repair Shops Retail Gasoline Outlets Restaurants Hillside Developments Parking Lots Streets/Roads Heavy Industrial Description In general, this category includes detached single-family homes and duplexes. Check with local permitting agency for verification. In general, this category includes attached single-family homes (except duplexes), condominiums, townhomes, and apartments. Check with local permitting agency for verification. Development on private land that is not for heavy industrial or residential uses. This category includes, but is not limited to, hospitals, laboratories and other medical facilities, educational institutions, churches, recreational facilities, parks, commercial nurseries, car wash facilities, mini-malls and other business complexes, shopping malls, hotels, office buildings, public warehouses, kennels, equipment rental facilities, and other light industrial facilities. A facility that is categorized by one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 7532-7534, or 7536-7539. Any facility engaged in selling motor vehicle fuels and categorized by Standard Industrial Classification (SIC) code 5541. Any facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (SIC code 5812). Any development in an area with known erosive soil located in an area with natural slopes having a twenty-five percent or greater grade. All or portion of parking lots exposed to rainfall (uncovered impervious area) for the temporary parking or storage of motor vehicles used personally, for business, or for commerce. Any paved surface used by automobiles, trucks, motorcycles, and other vehicles. Heavy industrial facilities (light industry covered under commercial category) 1 Thresholds for determining which types of stormwater quality measures apply to each project type can be found in Table 3-2 and Table 3-3 in Chapter 3, Steps to Managing Stormwater Quality. 2 Refer to applicable permitting agency s zoning definitions. How the Manual is Organized Chapter 1 provides an introduction. Chapter 2 explains the benefits of integrating stormwater quality management into overall project design and describes strategies and principles for doing so. Page 1-6

Chapter 3 outlines a step-by-step process for fulfilling the requirements of this manual and references the other chapters for more information. Chapter 4 and Chapter 5 provide specific siting and design criteria (as well as construction and maintenance considerations) for a range of stormwater quality control measures. Chapter 4 covers source controls; Chapter 5 covers hydromodification control measures, low impact development measures, and treatment controls. Chapter 6 provides guidance for design of green streets for municipal projects, as well as incorporation of associated LID design elements. The Appendices provide additional detail on a number of topics. In addition: Appendix C lists permitting and contact information related to discharges to the sanitary sewer; that is included since some source control measures call for discharging potentially polluted site runoff to the sanitary sewer. Appendix F lists sources for stormwater management information not covered by this manual (as described in the next section). Reference materials used to develop each chapter are listed at the end of that chapter, and references used to develop the various control measure fact sheets are presented at the end of each fact sheet in Chapter 4 and Chapter 5. The two main reference documents were the Stormwater Quality Design Manual for the Sacramento and South Placer Regions (May 2007) and the California Stormwater Quality Association s statewide document, California Storm Water Best Management Practice Handbook for New Development and Redevelopment (January 2003, revised September 2004). Also referenced were the Sacramento Stormwater Quality Partnership Hydromodification Management Plan (July 29, 2011, revised February 14, 2013) and the Low Impact Development Standards Development, Stormwater Quality Design Manual Update and BMP Sizing Tool Enhancement Task 1: Develop Low Impact Development (LID) Standards for New Development and Redevelopment Projects and Associated Work Report (June 23, 2012). Stormwater Management Information Not in this Manual This manual does not include: CASQA s California BMP Handbook for Development was referenced in the creation of this Design Manual, with many adaptations made for the Sacramento Region. In the event of conflicts between this manual and the CASQA handbook, this manual will generally take precedence. Contact your local permitting agency for clarification. Drainage/flood control design standards Temporary erosion and sediment controls and other pollution controls used during construction activities On-going operational practices to control pollution at industrial and commercial facilities once they are constructed (such as making sure employees don t dump hazardous or liquid wastes in the trash). Page 1-7

For information about those topics, see the references listed in Appendix F. Obtaining the Manual and Updates Go to www.beriverfriendly.net to download this manual (PDF format) and obtain information for ordering a hard copy. The manual will be updated periodically to reflect new information. To determine if updated information or errata sheets are available, check www.beriverfriendly.net regularly or contact one of the local permitting agencies listed in the front of this manual. Questions and Comments We welcome your questions and comments and will also consider this information in making future updates and improvements. For information related to projects in Sacramento County, contact the appropriate permitting agency listed at www.beriverfriendly.net (new development). Send questions and comments on the design manual to: dfadl@cityofsacramento.org with stormwater design manual in the subject line. Page 1-8