PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

Similar documents
TENTATIVE MAP CHECKLIST

Project phasing plan (if applicable) 12 copies of site plan

Neo-Traditional Overlay Application

CITY OF ZEELAND PLANNING COMMISSION

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

Application for Site Plan Review

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

Site Development Plan (SDP) Checklist

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Major Development Order Approval Process. Introduction. In This Handout. Pre-Application Meeting. Meetings

SUBMITTAL REQUIREMENTS

SITE PLAN REVIEW PROCESS

Site Plan Review Residential Accessory Building

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX

PRELIMINARY PROJECT REVIEW PROCESS

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Planning Commission Staff Report June 5, 2008

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

PLANNED UNIT DEVELOPMENT APPLICATION

SPECIFIC PLAN Requirements

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

ARTICLE 17 SITE PLAN REVIEW

CITY OF POWAY DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

CONCEPT PLAN APPLICATION

SITE PLAN REVIEW APPLICATION

MAJOR SITE PLAN APPLICATION COVER SHEET

APPLICATION FOR MINOR SITE PLAN REVIEW

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

3. Are there any projects exempt from the definition of Regulated Projects?

Chapter 4 - Preparation of Stormwater Site Plans

REQUIRED CHECKLIST FOR Better Streets Plan Section 138.1(c)(2)

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

SITE PLAN (REVISED 8/13/18) l. Development Data Table

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES

COMMERCIAL DESIGN REVIEW APPLICATION

LND-B LAND USE APPLICATION FOR OFFICE USE ONLY:

Chapter RM MULTI FAMILY BUILDING ZONES

ARTICLE VI: SITE PLAN REVIEW

Asbury Chapel Subdivision Sketch Plan

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

ORDINANCE NO WHEREAS, the City of Kalama has many areas of timberland and open areas inside its City limits adjacent to residential areas;

APPLICATION FOR MINOR SITE PLAN REVIEW

REZONING APPLICATION MPD SUPPLEMENT

4. To assure that adequate screening and buffering will be provided between the planned project and contiguous properties;

Appendix I. Checklists

Huntington Stormwater Utility

HILLSIDE BUILDING COMMITTEE PLAN REVIEW DIRECTIONS

Glenborough at Easton Land Use Master Plan

TABLE OF CONTENTS ADOPTED FIRE CODES... 3 AFPD SERVICE AREA... 3 SITE AND DEVELOPMENT SUBMITTAL REQUIREMENTS... 4 PLAN REVIEW FEES...

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT Coast Highway APN

STAFF REPORT INTRODUCTION

I Street, Sacramento, CA

Zoning Ordinance Section 1.100

CRESCENT RESOURCES INC.

Highway Oriented Commercial Development Criteria

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

Plan Submittal Checklist

ZONING COMPLIANCE PERMIT APPLICATION

FEE SCHEDULE Construction Services and Permitting

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

CITY OF MARIANNA. MUNCIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850) Major Development Order Approval Process

C-I-10. The effect of establishing a comprehensive site review as follows will: B. Reduce the cluttered aspects of current development by:

CITY-COUNTY PLANNING BOARD DRAFT STAFF REPORT

CHAPTER SPECIAL PURPOSE AND OVERLAY ZONING DISTRICTS

Three threshold measures will be applied together to capture project scale and scope and impacts:

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

D1 September 11, 2013 Public Hearing APPLICANT:

Chapter LANDMARKS AND HISTORIC SPECIAL REVIEW DISTRICTS A.120 Enforcement A.130 Severability. Tacoma Municipal Code

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

City of Lafayette Study Session Staff Report Design Review Commission

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Department of Planning & Development Planning Unit

APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

PARKLET PROPOSAL PACKAGE & PROCESS

Essential Skills: Reading and Interpreting Maps and Plans

UNIFIED DEVELOPMENT CODE

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

Note: Staff reports can be accessed at Special Permit Application No.

Community Development Department Commercial Permit Application

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Mayor Leon Skip Beeler and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

Sec Development design approval and procedures.

4.500 Preston Road Overlay District

S000 SITE REVIEW APPR NO. FIRE CODE COMPLIANCE ITEM

RULES AND REGULATIONS FOR GENERAL DEVELOPMENT PLANS

Transcription:

Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Business License Building Fire Prevention Planning Public Works 707.648.4310 707.648.4374 707.648.4565 707.648.4326 707.651.7151 PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN) Appointments may be required for some planning application submittals. Appointments must be made at least 24 hours in advance. Please call the main desk (707) 648-4326 to set up the appointment. What is a Planned Development? Planned Development (PD) is both a zoning district and project development process which allows for the flexible application of zoning regulations. The planned development process facilitates the development or redevelopment of land which because of special circumstances would be difficult to develop through conventional zoning ordinance regulations. The PD district may be applied to an area which can be developed as a single unit of land. What are the steps in the process? To determine if the property and use are appropriate, you should submit the proposed project for preliminary review. Please refer to the Preliminary Review" handout. If the project area is not already designated as Planner Development, an application for a zoning amendment to a Planned Development district (residential, commercial, industrial, mixed use) is required. Please refer to the "General Plan and Zoning Amendments" handout. Planned development applications are subject to the environmental review process. Please refer to the "Environmental Review" handout. After approval of the zoning amendment, the application procedure for the planned development consists of two steps: Master Plan approval and Unit Plan approval. What is a Master Plan? MASTER PLANS The Master Plan is the presentation of the overall concept for the proposed project. The Master Plan is intended to give the Planning Division, Planning Commission, and City Council a comprehensive illustration of the intent and purpose of the proposed project. The Master Plan is the presentation of the overall concept for the proposed project and is intended to give the City a comprehensive illustration of the intent and purpose of the proposed project. The Unit Plan describes the specific design and uses for the project as proposed conceptually in the Master Plan and is intended to give the City a more refined and detailed description of structures, landscaping, design features and uses within a particular part of the project. The Planning Manager may waive the requirement for a Master Plan if the project is of such a small size that it will be developed all at once rather than in phases or if a specific plan has already been prepared for the area. In that case, only a Unit Plan application would be required.

What is required for a Master Plan submittal? MASTER PLAN CHECKLIST The following items must be submitted for a complete application. To ensure that all items are provided, please check off the box for each item that is shown. If an item is not applicable, write N/A next to the box. Incomplete applications will not be accepted. Application: A completed planning application signed by the property owner and applicant. Fee: An application fee of $. A public notice fee of $. Description: Three (3) sets of a written description which includes the site location, total project acreage, existing character and use of the site and adjoining properties including current zoning, description of the project and its intent and purpose, provision of infrastructure, relationship of the project to the Vallejo General Plan. Site Plan: Three (3) copies of 24 x 36 (full-size) plans to include the following: Scope and phasing of the project Topography, natural features and, if applicable, location of view corridors All buildings and structures Public and private rights-of-way Utilities and existing and proposed easements Parking and loading areas Pedestrian areas and public and private open spaces Planting areas Public facilities, if applicable Location of nearest fire hydrants One 8-1/2 x 11 reduction of all plans. C.3 Compliance Table Electronic Plans: A flash drive or CD of all full-size plans in pdf format. Statement of Development Standards: Three (3) copies to include the following: Overall design theme or concept Architecture, lighting, and signage Landscaping Grading Rights-of-way Setbacks, height limits and maximum lot coverage Accessory structures Permitted land uses Floor area ratio and/or number, type, and density of residential development

Environmental Review Documentation: including technical appendices (e.g. traffic, soils, etc.) as required by the Planning Division and as provided by the California Environmental Quality Act (CEQA) Guidelines. Site Photos: Color photos showing the existing property and the adjacent properties. Stormwater Control Plan: Check the table below to determine if the project triggers C.3 (stormwater treatment) requirements. If so, submit a Stormwater Control Plan according to the Contra Costa Clean Water Program (CCCWP) Stormwater C.3 Guidebook (: http://www.cccleanwater.org/stormwater-c-3- guidebook/) and the City of Vallejo Hydromodification Plan (http://www.ci.vallejo.ca.us/city_hall/departments divisions/public_works/engineering_division/current_ development/). Site Plan shall show all existing, new and replaced impervious and pervious surface areas and provide the square footage of these areas in table form to verify if project triggers C.3 requirements. Does my project need to comply with the C.3 (stormwater treatment) requirements? Calculate the total new and replaced impervious surfaces for the project and refer to the table to below to determine if project triggers C.3 requirements. Impervious Area Threshold Projects between 2,500 and 10,000 square feet requiring approvals or permits (includes singlefamily residences) Auto service facilities, gas stations, restaurants, and uncovered parking lots over 5,000 square feet All projects between 10,000 square feet and one acre 1 Projects an acre and larger 1 Requirement Install one or more of the following: Direct roof runoff into cisterns or rain barrels for reuse; direct roof runoff onto vegetated areas; direct runoff from sidewalks, walkways, and/or patios on to vegetated areas; direct runoff from driveways and/or uncovered parking lots on to vegetated areas; construct sidewalks, walkways, and/or patios with permeable surfaces; construct bike lanes, driveways, and uncovered parking lots with permeable surfaces. Submit a Stormwater Control Plan per the Chapter 3 of the CCCWP Stormwater C.3 Guidebook, including features and facilities to ensure runoff is treated before leaving the site. Evaluate feasibility of storage for later use. Use the LID Design Guide in Chapter 4, including sizing factors and criteria for treatment only Prepare and submit a Stormwater Control Plan per Chapter 3 of the CCCWP Stormwater C. Guidebook and use the LID Design Guide in Chapter 4, but modify the sizing factors and criteria for treatment and flow control per the City of Vallejo HMP. Evaluate feasibility of storage for later use. 1 Detached single-family homes that are not part of a larger development are specifically excluded. How is a Master Plan application processed? After acceptance of a complete application, the Master Plan proposal is routed for interdepartmental review and analysis. Depending on staff s review, you may be asked to modify your project to comply with City of Vallejo

development policies and standards. After any project revisions are completed, the Master Plan will be scheduled for a public hearing before the Planning Commission. At least twenty-one (21) days prior to the Planning Commission hearing, property owners within 500 feet of the boundaries of the subject property will be notified of the public hearing. At the hearing, the Commission will consider the information provided by the Planning Division staff and hear comments from the applicant and the public. After the public hearing portion of the meeting is concluded, the commissioners will make a recommendation to the City Council to approve or deny the Master Plan. After recommendation on the Master Plan by the Planning Commission, and subsequent notification to surrounding property owners, a second public hearing is scheduled for the City Council to take action to approve or deny the application. What is a Unit Plan? UNIT PLANS The Unit Plan describes the specific design and uses for all or part of the project as proposed conceptually in the Master Plan. The Unit Plan is intended to give the Planning Division and/or the Planning Commission a more refined and detailed description of structures, landscaping, design features and uses within a particular part of the project. What is required for a Unit Plan submittal? UNIT PLAN CHECKLIST After approval of the Master Plan, or if a Master Plan has been waived, a Unit Plan application may be submitted. The following items must be submitted for a complete application. To ensure that all items are provided, please check off the box for each item that is shown. If an item is not applicable, write N/A next to the box. Incomplete applications will not be accepted. Application: A completed planning application signed by the property owner and applicant. Fees: An application fee of $. A public notice fee of $. Site Plans: Eight (8) copies which include the following: Identification of type and location of all proposed uses Roof plan of building Location of all existing and proposed structures Location of existing trees or natural attributes Location of off-street parking and loading facilities Location and dimensions of street and highway dedications Location of points of entry and exit for vehicles and internal circulation patterns Location of walls and fences and the indication of their height and material of construction Exterior lighting standards and devices Grading and slopes where they affect the relationship of the buildings with cross-sections, amount of cut and fill and a statement of whether or not there will be balanced grading and Location of all utilities and related easements C.3 Compliance Table

Landscaping plans: Eight (8) sets showing number, size, spacing and name of plant materials including planting and irrigation specifications. Architectural Plans: Eight (8) sets which include the following: Plan drawn to scale at ¼ = 1 (minimum) Elevations and cross-sections of all sides of development Show location, size, color and shape of all appurtenances visible from the exterior, including, but not limited to, signs, stairs, ramps, storage areas, solid waste storage area, utility lines, meter boxes, transformers, mechanical equipment, awnings, balconies, towers and antennas Perspectives, models or other suitable graphic materials, if required by the Planning Division Colors and material of exterior surfaces and Signage plans Stormwater Control Plan: Check the table below to determine if the project triggers C.3 (stormwater treatment) requirements. If so, submit a Stormwater Control Plan according to the Contra Costa Clean Water Program (CCCWP) Stormwater C.3 Guidebook (: http://www.cccleanwater.org/stormwater-c-3- guidebook/) and the City of Vallejo Hydromodification Plan (http://www.ci.vallejo.ca.us/city_hall/departments divisions/public_works/engineering_division/current_ development/). Does my project need to comply with the C.3 (stormwater treatment) requirements? Calculate the total new and replaced impervious surfaces for the project and refer to the table to below to determine if project triggers C.3 requirements.

Impervious Area Threshold Projects between 2,500 and 10,000 square feet requiring approvals or permits (includes singlefamily residences) Auto service facilities, gas stations, restaurants, and uncovered parking lots over 5,000 square feet All projects between 10,000 square feet and one acre 1 Projects an acre and larger 1 Requirement Install one or more of the following: Direct roof runoff into cisterns or rain barrels for reuse; direct roof runoff onto vegetated areas; direct runoff from sidewalks, walkways, and/or patios on to vegetated areas; direct runoff from driveways and/or uncovered parking lots on to vegetated areas; construct sidewalks, walkways, and/or patios with permeable surfaces; construct bike lanes, driveways, and uncovered parking lots with permeable surfaces. Submit a Stormwater Control Plan per the Chapter 3 of the CCCWP Stormwater C.3 Guidebook, including features and facilities to ensure runoff is treated before leaving the site. Evaluate feasibility of storage for later use. Use the LID Design Guide in Chapter 4, including sizing factors and criteria for treatment only Prepare and submit a Stormwater Control Plan per Chapter 3 of the CCCWP Stormwater C. Guidebook and use the LID Design Guide in Chapter 4, but modify the sizing factors and criteria for treatment and flow control per the City of Vallejo HMP. Evaluate feasibility of storage for later use. 1 Detached single-family homes that are not part of a larger development are specifically excluded. How is a Unit Plan processed? If the requirement for a Master Plan has been waived, the Unit Plan submittal must include all the items required for a Master Plan as well. See previous section 'What is required for a Master Plan submittal?' for specific submittal requirements. Additionally, the application processing procedure would be the same as described for a Master Plan. After acceptance of a complete application, the Unit Plan proposal is routed for interdepartmental review. Unless the Unit Plan requires Planning Commission approval, the Planning Division will make a determination on the application. If one or more of the following situations exist, the Planning Division will forward the Unit Plan application to the Planning Commission for action to approve or deny the application. Sale of on-site or off-site alcoholic beverages; Development of 9 or more residential units if the requirement for a Master Plan has been waived; Manufacturing and/or storage of hazardous and toxic materials; Determination by the Planning Manager that the application warrants a public hearing by the Planning Commission. Can a decision on a Master Plan or Unit Plan be appealed? Yes, any Planning Division determination may be appealed to the Planning Commission through the Planning Commission Secretary. To appeal, the appellant shall submit a letter stating the reasons of the appeal and how it affects them. The appeal must be filed with the Planning Division within 10 calendar days after the decision is made. A public hearing will then be set for the Planning Commission to consider the appeal. If a Commission decision is appealed to the City Clerk, a public hearing before the City Council will be scheduled. If no appeal is filed within 10 days of the determination date, the project determination is final.

When are hearings held? The Planning Commission usually holds public hearings on the first and third Mondays of each month at 7:00 p.m. in the City Council Chambers, 555 Santa Clara Street. The City Council usually holds public hearings the second and fourth Tuesdays of the month at 7:00 p.m. in the City Council Council Chambers, 555 Santa Clara Street. When do approvals expire? Approval of a Master Plan application is valid for 24 months from the date of approval unless a complete Unit Plan application has been submitted to the Planning Division for processing, in which case the Master Plan approval remains valid. Approval of a Unit Plan is valid for 12 months form the date of approval unless authorized construction has commenced prior to the expiration date, in which case the Unit Plan is vested and remains valid. If a Unit Plan is approved in conjunction with an approved tentative map of 5 or more lots, the project may be granted up to three 12 month extensions. An extension must be requested by the applicant prior to the initial 12 month expiration date. What if I need more information? For further information please contact the City of Vallejo Planning Division at (707) 648-4326.

SITE PLAN AND ELEVATION CHECKLIST What is a Site Plan? A site plan is an accurately scaled drawing illustrating the existing conditions on a parcel as well as the details of any proposed changes or development. Building elevations and floor plans may also be required. When is a Site Plan required? A site plan is required in order to review development proposals. You should refer to the individual development application handouts for specific information and number of copies required. SITE PLAN CHECKLIST The following items must be shown on the site plan. To ensure that all items are on the site plan, please check off the box for each item that is shown. If an item is not applicable, write N/A next to the box. Incomplete drawings will not be accepted. Scale of drawing and north arrow. (Engineer s Scale) Name and address and phone number of property owner. Name and address and phone number of the plan preparer. Name, address and phone number of contractor/builder and Engineer or Architect (designer). Date of site plan preparation. Street address and assessor s parcel number. Topographic contour lines with existing and proposed grades. Lot size. Lot lines, back of curb or sidewalk, street center lines and street names. Location of all existing buildings, proposed building(s), building additions, signs, open space, sidewalks and other improvements as applicable. Location and nature of all easements. Location and nature of existing and proposed utility lines and equipment. Location of the nearest fire hydrant or water source for fire suppression. Dimensions between all buildings and between all new buildings and property lines. Square footage of buildings. Location of existing and proposed landscaping. Location of existing and proposed parking. Flood zone information. Lot coverage calculations. C.3 Compliance table.

What are Building Elevations? Building elevations are scaled drawings of each side of a building or structure. When are Building Elevations required? Building elevations are required when exterior changes are proposed to the building(s). BUILDING ELEVATION CHECKLIST If elevations are required, the following items must be included. To ensure that that the elevations are complete, please check off the box for each item that is shown. If an item is not applicable, write N/A next to the box. Incomplete drawings will not be accepted. Location, dimension and style of doors. Location, dimension and style of windows. Location, dimension and style of chimneys. Floor-to-floor heights. Locations and type of exterior or roof-mounted equipment. Final grade level of ground adjacent to the building in relation to the floor level. Types of wall finishes and colors. Location and type of exterior stairs. Overall structure height from the lowest point on the site covered by any portion of the building to the topmost point of its roof. What if I need more information? For further information please contact the City of Vallejo Planning Division at (707) 648-4326. NOTE: All plans should be collated and folded into a size no larger than 9 x 13.