Material Design for Central Chutes

Similar documents
Gravity and Pneumatic Waste and Linen Handling Systems NFPA 82 Inspection Form

Miller Waste Solutions Group Products and Services Guide

Over 40 years of Dependable Service

WASTE SOLUTIONS GROUP LET US HELP YOU GET YOUR CHUTE TOGETHER. Waste Solutions Group Products and Services Guide

Polymer Dilution Blend and Feed Specifications For General Use

For a sustainable Future

Product Specifications. Vertical Floor Consoles By First Co.

VERTICAL FAN COIL UNITS

CP1-C5 COMPACTOR SPECS 2009

Standard 24 Diameter Chute 16 GA Aluminum Standard 15x18 bottom hinged self-closing doors

TECHNICAL DATA DOUBLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC/ PNEUMATIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

SECTION AIR DUCT ACCESSORIES

TECHNICAL DATA. 319a. January 27, 2012

ROTARY DRYER CONSTRUCTION


Desiccant Dehumidifier

Recycle Encourage material Recycle. Automated separate collection & storage. Space saving Convey large amount of waste at high speed

HID312, HID525 and HID540 Meridian Ice Maker-Dispensers Technical Service

Master in Architecture. (Services in High Rise Buildings)

TECHNICAL DATA OBSOLETE

ARCHIVE GUARDING OF PAPER BALING PRESSES

Mechanical System Description

STERI-VAC CENTRAL SUCTION SYSTEM

PROJECT: NITESH PALO Bangalore FIRE SAFETY MEASURES

S_Series Click to go to the page. S-Series Bag Filter

INSTALLATION INSTRUCTIONS TXV Horizontal Slab Coils WLSH

1.0 CONDITIONS FOR CHILLED WATER SUPPLY (PRIMARY SIDE BY DHCS SUPPLIER)

City of Duluth Festival Center 04/25

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

All series is using Hitachi scroll compressor, low vibration and high efficiency. Internal thermostat embedded compressors, and it can react quickly.

NOZZLES FOR BOTTLE, DRUM, AND TANK WASHING

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC RELEASE

Progressive Cavity Sewer Systems

GIRTON CABINET WASHER MODEL 794A

SUVA CITY COUNCIL Health Services Department

Dansereau Dental. P r e - C o n s t r u c t i o n G u i d e

Installation Operation Maintenance

USER S MANUAL. Heat (Energy) Recovery Ventilator. Vents Frigate HRV 120 S Vents Frigate ERV 120 S

CHAPTER 5 Water, Plumbing, and Waste

Installation Operation Maintenance. Ductable water unit FWD FWD-SVX01D-E4

Table of Contents SPECIFICATIONS Page 2. FOR THE INSTALLER Page 3. FOR THE PLUMBER Page 4. INSTALLATION Page 5. INITIAL START UP Page 6

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

APPENDIX L ALTERNATE PLUMBING SYSTEMS

Understanding the Benefits of Compaction

Application guide FLATAIR - FLCK/FLHK. Providing indoor climate comfort

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

Flow Control for Fire Protection

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION)

A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems.

I.O.M. #116 7/10 INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE. Covers Models from 25 to 100 tons.

DUST COLLECTION TRAINING. Revision 2013

Warewashing. Warewashing. Single Tank Rack Type Dishwasher with Atmospheric Boiler

VERSO Air Handling Units

RSV Chimney Fan USA CAN. Start Up and Configuration. ... Chapter 5. Maintenance and Troubleshooting... Chapter 6. Job Name: Installer:

PLASMAC Ltd. Units 11&12 Aylesbury Business Centre Chamberlain Road Aylesbury Bucks. HP19 8DY. UK

Condensate Pumps Jones Boulevard Limerick Airport Business Center Pottstown PA Tel:

Wallace & Tiernan Gas Feed Systems V2000 Chlorinator

Pressurisation units & expansion vessels

SINGLE INTERLOCK, SUPERVISED PREACTION SYSTEM WITH ELECTRIC RELEASE

Process engineering. Collection and disposal of commercial food waste ACO Waste-Jet Wet refuse collection system

TOPAZ ADIABATIC COOLER

INTEGRA PLUS ABC. 230V~ 50Hz. Stock Ref. N. Installation and Wiring Instructions IPX2

INTRODUCTION. Special Applications of Package Air Conditioners. Instant Cooling Requirement in Wedding Ceremonies

NOZZLES FOR BOTTLE, DRUM, AND TANK WASHING

The Enviro-Clean Air Scrubber keeps the Atmosphere Clear and Creates Clean Air

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

SINGLE INTERLOCK, SUPERVISED PREACTION SYSTEM WITH WET PILOT ACTUATION

EN l Senking Batch Transfer Drying Tumbler DT Senking Batch Transfer Drying Tumbler DT High performance with less energy

BESF Box Ventilator. Installation & Operating Manual USA CAN READ AND SAVE THESE INSTRUCTIONS

SECTION STEAM CONDENSATE PUMPS

INDUSTRIAL REMOTE FILTER

ODOR CONTROL SERVICES & PRODUCTS

USER S MANUAL. Heat Recovery Ventilator. Vents Brig HRV 200 Vents Brig HRV 300

S Y D. HWP 35, 47, 58 (c/w EC Motor & UC7 Controller) Ducted Water Cooled R410A Packaged Air Conditioner. Installation & Maintenance

Flow Control for Fire Protection

SLP98UHV WARNING. WARNING Sharp edges. Be careful when servicing unit to avoid sharp edges which may result in personal injury. Service Literature

G71MPP WARNING. WARNING Sharp edges. Be careful when servicing unit to avoid sharp edges which may result in personal injury. Service Literature

User manual. Dishwasher ZDT12041FA

BESB Box Ventilator USA CAN. Product Information. Mechanical Installation. ... Chapter 3. Electrical Installation. ... Chapter 4

IC-45AV Vertical Clean Centrifuge

- Sewage and Sludge Pumps

T F E

WASTE MANAGEMENT CLEANING COMPOSTERS FOOD WASTE MANAGEMENT IP COMPACTORS

Industrial Dust Aspiration Solutions. For optimal protection of plant and environment.

Installation Manual. Instrucciones de instalación y manual de usuario 1

RS Chimney Fan For Gas & Oil Applications. Installation & Operating Manual USA CAN

FUEL OIL DAY TANKS. SST Level Controller: UL 508 LISTED

PRE-INSTALLATION GUIDE

EHH SERIES DRAW THROUGH FAN COILS CFM

OPEN SPRINKLER SYSTEM

LOW STATIC HYDRONIC DUCTED UNIT

2012 INTERNATIONAL FUEL GAS CODE VENTS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

OPTIONAL SPRING MTG HANGING CENTRES WATER CONN'S: TWO BSP MALE. 19 mm (3/4") ELECTRICAL CONDUIT HOLES ACCESS PANEL OUT (WATER) IN 485 MOUNTING

Ontario Fire Code SECTION 5.10 COMBUSTIBLE DUST PRODUCING PROCESSES. Illustrated Commentary. Office of the Ontario Fire Marshal

TOTALPAC2 Integrated Fire Protection System

Fibreglass reinforced polyester (FRP) water collection basin with sloping base and smooth internal finish with rounded corners for easy cleaning.

S D HWP 77, 96. Ducted Water Cooled R410A Packaged Air Conditioner. Installation & Maintenance. Fig. 1 Nomenclature. Fig.

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Transcription:

WASTE SOLUTIONS

Why Central Chutes? In the rapidly growing and highly competitive world of today; high-rise buildings, large apartments serving commercial and residential, and construction buildings have become hallmarks of urban development. This development usually comes with a significantly increased challenge in removing solid waste, refuse or garbage from high-rise buildings with multiple levels. Central Chutes have therefore been developed as effective solutions to the problems of garbage collection and disposal for multiple-leveled high-rise buildings for residential and commercial apartments, with the in-built advantages of convenience, efficiency, safety and hygiene. Material Design for Central Chutes Stainless Steel in line with the SS 430 / SS 304 Grade/ Codes. Garbage Chute Thickness - 1.2, 1.5, 2 mm based on the diameter of the Central Chutes. Based on the BS/NFPA codes against fire hazards in high-rise buildings; fiber and plastics are excluded from the design of the Central Chutes. To prevent failure from corrosion; galvanized steel is excluded from the design of the Central Chutes. Where to Install Central Chutes can be installed in residential or commercial high-rise buildings, hotels, hospitals, and more. Central Chutes are excellent for installation in a wide variety of ducts, common lobbies, landings, staircase mid-landings, utility ducts, dry balconies and kitchens. Where Central Chutes are installed: At floor level; intake hoppers shall be installed to every floor level. At mid-landing level; intake hopper shall be installed to alternate floor level. 01 www.centralchutes.com

Our Super Features Central Chutes are developed and installed in line with specifications provided in BS 1703:2005, NFPA 82, IS 6924:2001 and NBC 2005. Central Chutes are weather-proof service life with stainless steel. Central Chutes are designed with a sanitation system for automated internal cleaning. Central Chutes have an exhaust system to provide a lower limit of 20 air exhausts every hour. Central Chutes have intake hoppers that can withstand 90 minutes of fire rated. Central Chutes are also designed with intake hoppers that shut automatically, and discharge-end fire doors for optimal safety. Central Chutes allow for the separate collection of "Dry" & "Wet" garbage. Selection of Central Chutes Size A weighty decision to make when deciding the best trash chute for residential and commercial high-rise buildings is the garbage chute size diameter. The garbage bag size used depends on the amount of garbage generated. As a convention; the size of the intake Hopper is selected based on the garbage bag size employed for garbage collection and disposal in the high-rise buildings. The diameter of the garbage trash chute is therefore selected based on the size of the intake Hopper. Below are lists of the standard Central Chutes size diameter based on the intake Hopper size and the type of high-rise building it would be used in. Type of Building Residential Commercial Hotel & Malls Hospitals Chute Diameter 400 / 600 mm 600 mm 750 mm 750 mm Major Components of Central Chutes Intake Hoppers The intake hoppers for the Central Chutes are opened at the top, and pivoted at their bottoms. The intake hoppers are designed to be fixed with facing the front wall. While the intake hoppers for linen chutes are designed to be manually operated with lateral opening are hung on the sides. The Intake hoppers of the Central Chutes have also been found to retain its integrity throughout a 90-minute fire hazard in a residential or commercial high-rise building.; the intake hoppers of the Central Chutes permit a maximum temperature increase of 121 degree Celsius in 30 minutes for the unexposed surfaces of the trash chute. The Central Chutes permit interlocking Intake Hoppers to comply with the One user at a time principle for high-rise buildings. Floor Frames The total weight of the Central Chutes is distributed on each floor. Therefore, floor frames are designed in various customized types on every floor of the high-rise residential or commercial building to support the Central Chutes. Floor frames for the Central Chutes are usually MS galvanized structural frames developed from 40 40 5mm angles, anchored to floor or beams of the high-rise building. www.centralchutes.com 02

Vent Central Chutes are designed with vents that aid in the complete removal of the foul odor from garbage collected from residential and commercial high-rise buildings. The vents of the Central Chutes are designed to produce a minimal range of 20-40 air changes or exhausts every hour. The vents of the Central Chutes are installed at the roof level, with its exhaust located at a minimum height of 1.2-2m above the roof of the high- rise building, and are remotely operated through a garbage trash chute control panel. The vents designed for the Central Chutes used in high-rise buildings are generally of two (2) types: o o Full-diameter vents Reduced-diameter vents Sanitation System With the aim of providing optimal hygiene; the sanitation system designed with the Central Chutes employs discharge sprinklers with 120 cone profiles attached at the intake portion. The sanitation system of the Central Chutes is designed to ensure that the discharge is kept constant, despite fluctuations and variations in the inlet pressure with the floor level height by employing different sprinklers at different floor levels. The sanitation system of the Central Chutes ensures optimal hygiene by with a daily cleaning cycle of approximately two (2) minutes. The sanitation system is designed to clean the Central Chutes from inside using water and disinfectant sprayed during the cleaning cycles. These cleaning liquids are supplied with PVC Sch 40 piping fitted along the length of the Central Chutes. For convenience; the sanitation system of the Central Chutes is installed at the roof level of the high-rise building, and are operated using a control panel in the garbage room. Discharge The Central Chutes are designed to discharge trash and garbage from high-rise buildings directly to a trolley or compactor. The Central Chutes are also designed to reduce diversion of trash and garbage, permitting a maximum diversion of 15 degrees with the vertical, based on the existing codes. With the aim of ensuring safety against fire hazards; the Central Chutes are designed with discharge end fire cut-off doors. Garbage Trolley For optimal efficiency; the garbage trolley requirement is selected based on the garbage disposal requirements of the high-rise building, with the garbage trolley available in the standard capacities of 240, 330, 660, 770, 1100 liters. To meet the specific needs of commercial and residential high-rise buildings and large apartments; customized garbage trolleys can be fabricated for your Central Chutes. 03 www.centralchutes.com

Fire Safety Central Chutes Intake Hopper The intake hopper of the Central Chutes has a minimum fire rating of 90 minutes. The insulation design of the intake hoppers for the Central Chutes would ensure that the temperature of the side unexposed to the fire would 121 degrees Celsius, where the temperature of the exposed side is 1000 degree Celsius. Fire Sprinklers The fire sprinklers are designed as half-inch IPS (BSP) female threading ready for fitting to the one-inch wet riser of the fire protection system. The fire sprinklers of the Central Chutes are designed to extinguish fire by opening at 68 degrees Celsius. Discharge End Fire Door In a fire outbreak in the garbage room; the discharge end fire door cuts the fire path at 79 degrees. The two-main grade of discharge doors employed with the Central Chutes are: Discharge Door C Type The C type discharge end fire rated doors of the Central Chutes are held on a bearing by a fusible link attached to the top of the slope. In the case of a fire outbreak in the garbage room; this fusible links melt at 79 degrees Celsius and the discharge fire door shuts the upwards path of the garbage trash chute to prevent the spread of the fire. This component is mostly used in garbage chutes. Discharge Door D Type The D-type discharge-end fire rated door employed for the Central Chutes is fitted horizontally against gravity by a fusible link. In the event of a fire outbreak; the fusible link melts at 79 degrees Celsius, and the discharge fire door shuts the upwards path of the garbage trash chute to prevent the spread of the fire. This component is mostly used in linen chutes. www.centralchutes.com 04

Segregation The operations of the Central Chutes are designed to meet the current municipal requirements for the separation of garbage into dry (recyclable) and wet biodegradable garbage. The Central Chutes enable the fully automated segregation of garbage from high-rise buildings using a single chute. To ensure efficiency; the Central Chutes operate one user at a time, and the intake hoppers of the garbage chutes are locked by default. Operational Sequence To operate the Central Chutes, press the wet or dry button. While the Central Chutes are being operated on a floor; the busy indicators and intake hoppers remain locked for all the other floors. The Central Chutes switch between wet and dry modes by rotating the flap doors in the garbage rooms. The Central Chutes provide an indicator of the selected garbage mode as the intake hoppers are operated. The intake hoppers are opened manually, and the individual garbage bags are dropped down the Central Chutes to be disposed on a trolley. The intake hoppers are automatically set to close, and reset the system for the subsequent garbage and trash disposal consuming a total change over time of 10 seconds. Building Requirements for the Installation of Central Chutes The front wall of the high-rise building should be constructed after the installation of the Central Chutes In the design of the high-rise building; 6 Amp. MCB, earth, neutral, single phase power point should be provided near the highest intake floor level for the control panel of the exhaust of the Central Chutes An access door of dimension 600 600 mm should be provided in the design of the high-rise building at 200mm above the highest intake hopper door. Predefined water connections with isolations valves should be provided in the high-rise buildings for the installation of the Central Chutes. 05 www.centralchutes.com CAUTION

No: of Intake Hoppers Size of Water Connection 0-7 1 NB 0-15 1.5 NB 0-25 2 NB 0-40 2.5 NB 0-50 3 NB A half-inch bib cock should be provided at the roof level of the high-rise building for the sanitation system of the Central Chutes. A pressure reducing valve should be provided for the Central Chutes, where the water connection is supplied by a hydro-pneumatic mechanism. A one-inch wet riser should be fitted in the Central Chutes for the fire protection system along the total height of the high-rise buildings. Special fire sprinklers developed for the Central Chutes should be fitted at the topmost intake hoppers, lowest-intake hoppers, and on alternate floors from the top. Chute Diameters Duct / Slab Opening 18 (450mm) 24 x 24 24 (600mm) 30 x 30 30 (750mm) 38 x 36 32 (800mm) 38 x 38 Garbage Room The garbage room for the Central Chutes should be air-tight and non-ventilated without windows or louvers. Floor tiles and wall tiles with a minimum height of 1.8 m should be provided for the garbage room of the Central Chutes. The floor of the garbage room should be sloped towards a gully trap attached to a basement sump or drainage system. In the process of wiring the garbage room for the Garbage Chutes; 6 Amp. MCB, earth, neutral cables should be provided. An outside opening flush door (40mm) with a minimum width of 1m should be provided for the garbage room. The chute duct slabs in the garbage rooms should be closed only after the installation of the Central Chutes. The garbage room that should be provided in a high-rise building for the installation of a standard Central Chutes should be 1.5W 1.5L 2.4H, while the garbage room size for Garbage Chute that segregates wet garbage from dry should be 2.0W 1.5L 2.4H. www.centralchutes.com 06

Static Garbage Compactors for High-Rise Building The static garbage compactor is operated with a fully automated hydraulic system at a pressure of 30,000 psi, and employs an automatic On/Off switch, employs laser beam sensors for garbage bags. Possesses the capacity to reduce the garbage trash volume by 20% with an input capacity of 18,000 liters per hour, or 750kg per hours. The standard capacity of the garbage compaction chamber is 200 liters. The static garbage compactor is designed for automatic garbage disposal into garbage bins. The static garbage compactor is fabricated with steel plates, while the compacting ram of the system is fabricated with steel plates to ensure effective operation at a pressure of 40,000psi. The static garbage compactors are also designed to cut large sized objects with hardened steel blades. To operate the static garbage compactor at its standard cycle time of 40 seconds; a hydraulic power pack is installed and mounted. The static garbage compactor is driven by a 3 phase T.E.F.C motor with a rating of 7.5hp, 1450 rpm, and class 'F' insulation. An external oval gear pump-type with mechanism for balancing pressure is employed with the static garbage compactor for residential and commercial buildings. The electrical control cabinet of the static garbage compactor is designed in compliance with the IP 55 codes, as well as an electrical interlock system for floor intake hoppers. The garbage compactor system further operates an automated disinfected spray. Organic Waste Composter A major issue facing modern society is waste management. More simply put, what should we do with the waste we produce? A growing emphasis has been placed on the three R's: Reduce, Reuse, and Recycle. Composting provides a means of accomplishing all three of the R's. Through composting the amount of garbage sent to the landfill is reduced, the organic matter is reused rather than dumped, and it is recycled into a useful soil amendment. Our Composters are fully automatic and highly compact composting machine which uses special microorganisms to break down and decompose all kinds of organic waste into compost within 24 hrs with a volume reduction of 85-90%. When organic waste is added to it, moisture is sensed by the humidity sensor, due to which the heater turns ON and the composting tank gets heated. Due to this, the water content in the organic waste is evaporated and it goes out to the atmosphere as water vapor through the exhaust system. 07 www.centralchutes.com info@centralchutes.com