REIMERS ELECTRA STEAM, INC. CAUTION:

Similar documents
REIMERS ELECTRA STEAM, INC. INSTRUCTION MANUAL JG & JJ MODELS Serial No.:

REIMERS ELECTRA STEAM, INC. INSTRUCTION MANUAL JG & JJ MODELS

Serial No.: and Up OPERATING INSTRUCTIONS MODEL AR. STEAM GENERATORS CAUTIONS:

CSD-1 CRN Electra Steam, Inc. Instruction Manual for JR06 Steam Generator, JG- and JJ- Models

MODELS R & RH 10 THRU 20 RB SERIES ELECTRIC STEAM BOILERS

REIMERS ELECTRA STEAM, INC MARTINSBURG PIKE CLEAR BROOK, VA PHONE: FAX: /17/2000

MODELS R & RH 24 THRU 120 ELECTRIC STEAM BOILERS

Electra Steam, Inc. RLP 100k 500kW Low Pressure and RHP 100kW 500kW High Pressure Steam Boiler Models. Instructions Manual

R- RH- and RHC-Steam Boiler Models (RB-Series) Serial No and up

RX Series Steam Boiler Instructions Manual

Instructions Manual. RHP120 RHP300 High Pressure Steam Boiler Models MODEL: Electra Steam, Inc. SERIAL #:

R- RH- and RHC-Steam Boiler Models (RB-Series)

RHP120 RHP300 Steam Boiler Series

Installation, Operation and Maintenance Guide G3600 Series Thermostatic Mixing Valves

model NO. LSS GALLON SKID MOUNTED HIGH PRESSURE SPRAYER ASSEMBLY / OPERATION INSTRUCTIONS / PARTS

Instruction Manual HWR MODEL RESISTO-FLO ELECTRIC BOILER


Note: Please provide valve serial number (stamped on cover of valve) when ordering parts. Thermometer. Hot Water Inlet. Cold Water Inlet G3600LF

Note: Please provide valve serial number (stamped on cover of valve) when ordering parts. Tempered Water Outlet. Hot Water Inlet.

Statement of Responsibilities

Installation, Operation and Maintenance Guide AP3900 Series Thermostatic Mixing Valves

Instruction Manual STR MODEL RESISTO-FLO ELECTRIC BOILER

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER

ME SERIES ELECTRICALLY OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE MODELS

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

TA-300, TA-300-LF, TA-350, TA-350-LF

Bob-White Systems: AUTOMATED BOTTLE FILLER

Funne~ Jiffy J-4000 Model Steamer FEATURES INCLUDES: From the library of: Superior Sewing Machine & Supply LLC

BARRINGTON PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET K-4327

SuperKlean Washdown Products

Installation Manual CARBONATOR With Plain-Water Booster

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

High Capacity Instantaneous Steam Fired Water Heater

ARCHERTM ORDERING INFORMATION NOTES T01-C INSTALLATION INSTRUCTIONS VITREOUS CHINA ONE-PIECE TOILET K-3639T/K-3639T-C

Niles Steel Tank Hot Water Generator Installation and Operation Manual

B.I.C.A Built-In Coffee Appliance

OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS. Technical Control Systems Limited MODELS "VIHS"

Water Boilers ME10EN, ME15EN. Table of Contents

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

Series 300 VTB. Installation Instructions

REVE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 现代型分体座便器 CONTEMPORARY TWO-PIECE TOILET K-17178T-S/K-17178T-SP

Blowdown Separator & Aftercoolers Installation, Operation, & Maintenance

Mini Tank water heater Electric undersink Water heaters GL GL 4 - GL 6+

INSTALLATION INSTRUCTIONS

SAFETY OPERATION & MAINTENANCE MANUAL X-405 CARPET EXTRACTOR This unit is intended for commercial use.

REACH ORDERING INFORMATION NOTES T01-B

F-P, F-L, FT-P AND FT-L SERIES 2/3 JACKETED DIRECT STEAM TILTING & STATIONARY KETTLES PARTS AND SERVICE MANUAL

SERVICE MANUAL. Bradford White ElectriFLEX HD (Heavy Duty) Commercial Electric Water Heater CEHD SERIES Immersion Thermostat Models

PALARRE, ROCHELLE WATER-GUARD VITREOUS CHINA SIPHON JET TOILET

Blowdown Separator & Aftercoolers

ERGOMAX 7 INSTALLATION

Owner's Manual. (200 Gallon Lawn Service Skid Sprayer) Technical Specifications. Operation. General Information. Warranty/Parts/Service

SNA-SKID Series - Preassembled Safety Shower Heater Skid Tankless Water Heating Solutions

Hot Water Boilers 810(E), 815(E), 830(E), 850(E) Table of Contents

OPERATING AND MAINTENANCE MANUAL FOR ELECTRIC STAINLESS STEEL HEATER FOR DEIONIZED (DI) WATER ELECTRIC HEATER COMPANY BASE MODEL D

Compact Fabric Steamer

IMAGE V. Parts and Service Manual

Operation Manual SCT14B and SCT18B. Inspection. 3 General Description. 3 General Requirements. 3 Standard Features.

Operation and Maintenance Manual

RecoverX Oil-Filled Hermetic Refrigerant Recovery System. Operation and Maintenance Manual

TECHNICAL INSTRUCTIONS


SAFETY OPERATION & MAINTENANCE MANUAL X-612 CARPET EXTRACTOR

REMOTE FAUCET PUMP SYSTEM

INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

INSTALLATION INSTRUCTIONS

SOLARHOT. SuperVox. Description / Applications System Overview. Installation/ Owner s Manual

Armstrong Flo-H2O Water to Water Instantaneous Heater Installation and Maintenance & Operation

REVE ORDERING INFORMATION NOTES T01-E INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17178T-S2/K-17178T-SBG2/K-17178T-SP2

OUTLET HOT INLET COLD INLET INSTALLATION

COPPER FREESTANDING TUB

REVIVAL LITE VITREOUS CHINA REVERSE TRAP TOILET

SAN RAPHAEL PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET

Commercial Electric Energy Saver Water Heater IMMERSION AND SURFACE MOUNTED THERMOSTAT MODELS

Installation, Operation & Maintenance Instructions

INSTALLATION INSTRUCTIONS

Weil-McLain part numbers are found in Weil-McLain Boilers and Controls Repair Parts Lists.

Operating & Safety Instructions v3.0

Water Softener Installation Guide Effective for all Softeners from our Range

OWNERS MANUAL for HOT WATER DISPENSER FOR EXPORT 2 GALLON MODELS: G-230V 5 GALLON MODELS: G-230V. Includes:

WELLWORTH WATERGUARD VITREOUS CHINA SIPHON JET TOILET

Armstrong J Series Float, Thermostatic Steam Traps, Condensate Controllers & Liquid Drainers Installation and Maintenance Manual

TWIN-FLOIII HEATER INSPECT THE SHIPMENT IMMEDIATELY WHEN RECEIVED TO DETERMINE IF ANY DAMAGE HAS OCCURRED DURING SHIPMENT.

COUTURE ECO-LITE VITREOUS CHINA REVERSE TRAP TOILETS

INSTALLATION SETUP AND OPERATING INSTRUCTIONS THERMOSTATIC WATER MIXING VALVE SYSTEM TM-500, TM-550

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

CHLORIDE GASES CHLORIDES

Installation Manual. Models 99168, 99169, 99170

MEMOIRS VITREOUS CHINA TOILETS

Hot-1 Hot Water Dispenser

KPS-DS, KLS-DS, KPT-DS AND KLT-DS SERIES 2/3 JACKETED DIRECT STEAM TILTING & STATIONARY KETTLES PARTS AND SERVICE MANUAL

SS1095 Ice Maker.

Wilbur Curtis Company, Inc.

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

Table of Contents. Specifications... page 2. Installation... page 3. Customizing... page 4. Reversing door swing... page 5

OPERATING MANUAL MODEL AIR 1500TM AIR DRYER

INSTALLATION AND OPERATION MANUAL STEAM COIL BASE CONVECTION STEAMER MODEL SCX-16

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMPACT POINT-OF-USE ELECTRIC WATER HEATER

Operation and Maintenance Manual BLIZZARD50 CS6-50-VD 120V/60HZ

Transcription:

REIMERS ELECTRA STEAM, INC. 4407 MARTINSBURG PIKE CLEAR BROOK, VA 22624 PHONE:540-662-3811 FAX:540-665-8101 EMAIL:reimers@shentel.net READ THIS FIRST CAUTION: READ ALL INSTRUCTIONS BEFORE INSTALLATION/OPERATION. ENSURE BLOWDOWN PROPERLY/SAFELY PIPED, DO NOT POSITION FACE/BODY OVER FILL FUNNEL. STAND CLEAR OF SAFETY VALVE & SCALDING STEAM. NEVER OPEN FILL VALVE WHEN UNIT IS UNDER PRESSURE. VALVES/PIPES ARE HOT WHEN UNDER PRESSURE OR HEATING UP. DO NOT TOUCH. IF A LEAK IS EVIDENT STEAM FITIINGS CAN BECOME LOOSE DURING SHIPMENT & SUBSEQUENTLY LEAK. IT IS EASY TO RESOLVE THESE LEAKS IF YOU ARE CAREFUL. 1. ENSURE BOILER IS COLD/DRAINED & HAS NO PRESSURE/ELECTRICITY. 2. TIGHTEN *PACKING NUT GENTLY 114TH OF A TURN. CA.VTIO'li: DO NOT OVERTIGHTEN, AS THIS WILL RESULT IN GAUGE GLASS BREAKAGE OR IN VALVE STEM FREEZING & VALVE FAILURE 3. FILL BOILER & OPERA TE NORMALLY. 4. OBSERVE FOR MORE LEAKS & REPEAT STEPS 1 & 2 AS REQUIRED. PACKING NUT LOCATIONS 1.0N EACH VALVE STEM UNDER HANDLE 2. TOP & BOTTOM OF GAUGE GLASS NOTE: The safeguards and instructions appearing on these pages are not meant to cover all possible situations that may occur. Understand that common sense, caution, and care are factors which cannot be built into any product. These factors must be supplied by the person operating the unit.

PHONE:540-662-3811 REIMERS ELECTRA STEAM, INC. 4407 MARTINSBURG PIKE CLEAR BROOK, VA 22624 FAX:540-665-8101 EMAIL:reimers@shentel.net OPERATING INSTRUCTIONS FOR JR. STEAM GENERATORS The REIMERS JR. is a portable, hand-filled steam generator with a 2 gallon capacity, for operation at pressures from 5 to 85 PSI. Designed to the ASME Boiler Code & registered with the National Board of Boiler Inspectors, it is safe when installed, maintained, and used properly. Standard equipment includes: steam gauge, steam valve, blowdown valve, water-fill funnel/valve, check valve, safety valve, water level gauge,, low water cut off & electric cord/plug. OPTIONAL: steam jet with foot chain release or electric solenoid valve. CAUTIONS: READ ALL INSTRUCTIONS BEFORE INSTALLATION/OPERATION. VALVES/PIPES ARE HOT WHEN UNDER PRESSURE OR HEATING UP. DO NOT TOUCH. ADJUSTMENTS: All controls have been set at the factory and should require no adjustments. MODIFICATION/MISUSE: Any modification or misuse of this unit could result in a dangerous ituation. Reimers Electra Steam, Inc. is not liable for any product that has been modified or improperly used. REGISTRATION: Most states & cities require boiler registration/inspection. Check with local government authorities. REPAIR: Repair of this unit must be attempted only by experienced personnel. For repair instructions see the included information. INSTALLATION PIPE INSTALLATION: Steam piping must be of black pipe, not galvanized. Work must be done by an experienced steamfitter. All state/local codes must be met. ELECTRICAL: All wiring must be in accordance with the National Electric Code and any local codes that may apply. Wiring must be done by a competent, certified electrician. Use only copper wire. WATER: Ensure that all electrical components (Electric Foot Switches, etc.) are in a dry location not subject to steam or water. BLOWDOWN VALVE: When the blowdown valve is utilized a large volume of hot water and steam is discharged. Ensure that this valve is properly piped for this discharge. State and local codes must be met as applicable. SAFETY VALVE:Safety valve is designed to discharge hot steam when the set pressure is exceeded. Ensure that the discharge port is pointing toward the back of the unit away from the operator and any aisles. 05-01-93 1. 2. 3. Close blowdown valve (left side of unit). OPERATION Open fill valve under funnel & release air from unit by opening steam valve. CAUTION: DO NOT POSITION FACE/BODY OVER FILL FUNNEL. NEVER OPEN FILL VALVE WHEN UNIT IS UNDER PRESSURE. 4. Pour water into funnel until it reaches the "Fill Level" mark behind the gauge glass. Do not overfill. Close fill valve. NOTE: Overfilling will cause dirt and rust to be carried into the steam lines and onto goods. It will also cause the steam release valve to leak. S. Connect electric cord to grounded 120 volt outlet. 6. push Manual Reset. The light will stay on until the presat working pressure is reached. 7. When the water level gets low, the unit will shut off. To refill, turn off steam pressure to drop to zero. fill with water as in 3 & 4. allow

MAINTENANCE & SAFETY NOTICE The two brass nuts at the top & bottom of gauge glass should be tightened until no leakage, then further tightened just enough to ensure nut is flat on each side (left & right) wnen viewed from the front. PRECAUTIONS Make no adjustments to the gauge glass unless the steam cleaner is unplugged, drained, all pressure is off the unit, and the unit is "cold to the touch". MAINTENANCE ~UTIO!i: REPAIR MUST BE BY EXPERIENCED PERSONNEL. ENSURE BOILER IS COLD/DRAINED AND HAS NO PRESSURE/ELECTRIC. ALL ELECTRICAL/STEAM SAFETY PRECAUTIONS MUST BE TAKEN. TO BLOWDOWN: (FREQOENCY-MINIMOM ONCE PER WEEK) Turn power off, allow pressure to drop to 5 psig, & open blowdown valve. ~rrrioll: STAND CLEAR OF SCALDING WATER/STEAM. ENSURE BLOWDOWN PROPERLY/SAFELY PIPED TO TEST SAFETY VALVE: (FREQUENCY-MINIMUM ONCE PER MONTH) ~UTIOJi: STAND CLEAR OF SAFETY VALVE & SCALDING STEAM. NOTE: Safety valve should be tested at min. operating pressure...if discharge pipe is required, it should not be smaller than valve outlet & must be rigidly supported. 1. Hold trip lever open for five seconds in order to flush off valve seat. 2. Permit valve to "slap" shut. (If leakage evident, repeat test or replace valve) TO TEST ELEMENT: (CONDITION) Unit will not operate (amber light on/unit not hot) when filled with water 1. VOLTAGE TEST = read 120 volts cross element. If no voltage reading, 2. AMPERAGE TEST = read 12.5 amps on each element wire. If no amp ~eading, replade I element '

~UTIO~: USE ONLY INSULATED ELECTRICAL WIRE FOR JUMPER DISCONNECT ELECTRICAL POWER WHEN ATTACHING JUMPER. TO TEST LOW WATER CUTOFF: (CONDITION) If boiler will not operate (amber light not on/unit not hot) when filled with water Manual Reset is pushed ~UTIOll: USE ONLY INSULATED ELECTRICAL WIRE FOR JUMPER DISCONNECT ELECTRICAL POWER WHEN ATTACHING JUMPER. 1. BYPASS CIRCUIT BOARD = Jump circuit board terminals COM & NO. This suspends low water protection. If light comes on, GO TO STEP 12 If not on, CONTACT FACTORY. 2. BYPASS PROBE ONLY = Jump G-LLCO. This will bypass probe. If light comes on, GO TO STEP #2A If light not on, replace circuit board (PART #03465) 2A. CHECK PROBE FOR MINERAL DEPOSITS ~UTIOl1: ENSURE BOILER IS COLD/DRAINED & HAS NO PRESSURE/ELECTRIC. 1. Remove probe cover/probe from top of unit 2. C~ean probe rod with emery cloth 3. Reinstall probe & check wires for loose connections. TO REPLACE GAUGE GLASS: (FREQUENCY = MINIMUM ONCE PER YEAR) ~UTIOll: ENSURE BOILER IS COLD/DRAINED & HAS NO PRESSURE/ELECTRIC. BE CAREFUL NOT TO BREAK GLASS 1. Close gauge glass valves (top and bottom). 2. Open petcock on bottom fixture of drain glass. 3. Loosen nuts at top and bottom of glass. 4. Slide glass up, pullout on bottom of glass and remove. 5. Install glass by reversing above procedure. NOTE: Always install new rubber washers. TO REPLACE HEATING ELEMENT: ~UTIOl1: ENSURE BOILER IS COLD/DRAINED & HAS NO PRESSURE/ELECTRIC 1. Remove panel of cabinet. 2. Disconnect and label terminal wires. 3. Remove 4 nuts from element flange and pullout heating element. ~lean flange surface before installing new element & gasket ~UTIOlt: ENSURE BOILER IS COLD/DRAINED & HAS NO PRESSURE/ELECTRIC NOTE: ASME DATA PLATE IS LOCATED ON RIGHT SIDE OF PRESSURE VESSEL BEHIND LABEL STAMPED WITH NATIONAL BOARD NUMBER OF UNIT.

PARTS LIST FOR MODEL JR. STEAM GENERATOR PHONE 540-662-3811 FAX 540-665-8101 EMAIL:reimers@shentel.net EXTERIOR PARTS 04213 SWITCH RED W/WHITE FRAME 125V 04215 RED LIGHT W/WHITE FRAME 125V 20592 RESET SWITCH MBJ-1 FUNNEL (ALUMINUM) 02490 VALVE, BALL 1/2" 03346 VALVE, BALL Y2 W/LATCH 03222 J VALVE, ANGLE GLOBE 1/4" N.P.T. 02462 VALVE Yz" SWING CHECK 02319 VALVE, GLOBE 1/4" N.P.T. 216S0L-120 SOLENOID 1/4" N.P.T. 120-V 20058 J JET, BRASS #53 02637 SAFETY VALVE 1/2" 100 PSI 02299 PRESSURE GAUGE 0-160 PSIG 20599 CORD 3-WIRE W/SLEEVES,PLUG CAP 120V 04201 GAUGE GLASS 4.75" 02396 GAUGE GLASS FIXTURE SET 02006 GAUGE GLASS WASHER (RUBBER) 02448 GAUGE GLASS WASHER (BRASS) 02283 HEATING ELEMENT, 1500W/120-V 02281 GASKET FOR ELEMENT/THERMOSTAT ASSY. 01314 NUTS FOR STUDS FOR ELEMENT FLANGE 02462 VALVE, CHECK 1/2" SWING 20595 J FOOT SWITCH (ELECTRICAL) 03465 LOW WATER CUT OFF (CIRCUIT BD) 120V 20339-X LOW WATER CUT OFF (ELECTRODE) 04163 PRESSURE CONTROL NOTE: J = Jewelry Model INTERIOR PARTS (REMOVE TOP PANEL)