Technology for Vacuum Systems. Instructions for use

Similar documents
Vacuum in the laboratory. products and solutions

Karlsruher Glastechnisches Werk KGW-ISOTHERM

Betriebsanleitung Operating Instructions

VACUU LAN VACUUm for LAborAtories VACUU LAN LoCAL VACUUm Networks

Instruction Manual Suppository Penetration Tester. Type PM 30

Instruction Manual. IT20K, IT100, IT300 and IT800 Inlet Traps. A Issue F. ITC800 Inlet Chemical Trap. ITD20K Inlet Desiccant Trap

Instruction Manual. IT20K, IT100, IT300 and IT800 Inlet Traps. idealvac.com (505) idealvac.com. ITC800 Inlet Chemical Trap

Further information at Fluid aspiration systems. economic, safe, comfortable. BVC basic, BVC control, BVC professional

Chemistry diaphragm pumps

OWNER S MANUAL FOR DRY VACUUM PUMPS MODELS 2016, 2024, and 8111

Short Path Distillation Unit. KDL 1 BASIC Version 2015

NEW. APPLIED VACUUM TECHNOLOGY. ASK THE EXPERTS!

K 2 Basic. Operating Instructions. Please read the operating instructions carefully before using the unit (05/17)

Labconco XPress Laboratory Equipment Where You Need It, When You Need It

Vacuum pump systems. Operating Instructions Read and observe these Operating Instructions! SC 950 SEM 950 SH 950 SR 950

Pressure sensors. Ex ia I / IIC T6 acc. to ATEX. Features. Description. Measuring ranges. Applications

Laboport Chemically-resistant Laboratory Pumps and Systems

Operation Manual R205BV, R209BV

Instruction Manual. B Issue B. next Pump Accessories

General safety precautions English

Technology for Vacuum Systems. Instructions for use

Hei-VAP Precision. for the highest level of accuracy. Vacuum Pumps. RPM Regulated Vacuum Pumps

General safety precautions English

NEW. APPLIED VACUUM TECHNOLOGY. ASK THE EXPERTS!

General safety precautions English

General safety precautions English

DLCLRA. INSTALLATION INSTRUCTIONS Outdoor Unit Single Zone Ductless System Sizes 36 to 58 TABLE OF CONTENTS

AIR CONDITIONER OWNER S MANUAL. Please read this manual carefully before operating your set and retain it for future reference.

Instruction Manual. Vapour Pump Thermal Snap-Switches. Cooling-Fail Thermal Snap-Switch

Operating Instructions. Accessory Units Melitta Cafina XT Series. Melitta Professional Coffee Solutions

OPERATING MANUAL English Chemical Resistant Diaphragm Pump

Electron Microscopy Sciences

50T Electric Shop Press

Installer manual AG-AA10. Air/air heat pump IHB GB AG-AA10-30 AG-AA10-40/50

VACUUM HEATING AND DRYING OVENS Gentle and safe

SIHI LPH-X - Liquid Ring Vacuum Pump One Stage

APPLIED VACUUM TECHNOLOGY VACUUM PUMPS & SYSTEMS

Installation Instructions

Repair instruction and handling for Isobutane (R600a) refrigerant.

ANLAGENBAU HEAT EXCHANGER w w w. a nla g enba u-b oehm er. d e Version 05/2015

Operation Manual. Airbrush Airbrush-Spray Booth Compressor Suction Unit Paint E420

Vacuum Pumps for moist Gases. Self-drying Vacuum Pump for moist Gases. Series LABOPORT SD N FT Vacuum Pump. Spare parts.

100T Electric Shop Press

Vacuum Controller with Control Unit VC 900

Heidolph Vacuum System. Heidolph Vacuum System. Vacuum pumps. Vacuum accessories. ROTAVAC valve control. VAC control automatic. ROTAVAC vario control

LyoDry Compact Benchtop Freeze Dryer INSTALLATION AND OPERATION MANUAL

Vacuum pumping system

OPERATING INSTRUCTIONS

S-Series Screw. The nnovation. leader

General safety precautions English

Inverted Bucket Steam Traps

92831 TEL: (714) FAX:

SIHI LPH-X - Liquid Ring Vacuum Pump One Stage

K M. Operating Instructions. Before first use of the unit read these operating instructions and act in accordance with them

Rotary Evaporators designed

Operating instructions Open two-stage compressor FZ 16

Verd_GB_ FH :22 Uhr Seite 1 C M Y CM MY CY CMY K Rotary Evaporators Probedruck

Verd_GB_ :55 Uhr Seite 1 C M Y CM MY CY CMY K Rotary Evaporators Probedruck

General safety precautions English

Installation Instructions

INSTALLATION INSTRUCTIONS TXV Coils for Manufactured Housing EMA

Intelligent. Evaporation. Premium Safety Standards Superior Ease of Use Reduced Cost of Ownership

Incorporation Declaration & Operating Instructions GA05118_002_C1

WHAT ARE THE SPECIFICATIONS FOR THE VACUUM

Order by phone Order on-line Order by fax Website

Model Communication Interface Sensors 2JCIE-BL01 Bluetooth low energy Temperature, Humidity, Light, UVI, Absolute pressure, Noise, Acceleration

Oil-Sealed Rotary Vane Pumps

DSEAR - Requirements

INSTALLATION INSTRUCTIONS GEO PRIME TANK. (Patent Pending) GPC

TMH 260 / TMU 260 TMH 260 P / TMU 260 P

INDUSTRIAL VACUUM CLEANER WITH AUTO START/STOP

LSM PUMPER Sigenvej 7 DK 9760 Vrå Tlf.: Fax USERS GUIDE FOR LSM PUMPS TYPE

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

Installation Manual PMV Kit RBM-PMV0363E RBM-PMV0903E

DLCSRA. INSTALLATION INSTRUCTIONS Outdoor Unit Ductless Split System Sizes 09 to 36 TABLE OF CONTENTS

Vacuum Pump V-300 Operation Manual

ORIGINAL OPERATING INSTRUCTIONS ASH VACUUM CLEANER / 18L

Oil-free Scroll Vacuum Pump

How to deal with ...R410A MITSUBISHI ELECTRIC R32 R125 R410A AIRCONDITIO NING

Intelligent. Evaporation.... takes the thinking out of your work

150T Electric Shop Press

Leading Safety Standards Superior Ease of Use Reduced Cost of Ownership. Intelligent. Evaporation

Instruction Sheet DANGER

Instruction Sheet DANGER

Advance Optima Continuous Gas Analyzers AO2060-Caldos15, -Caldos17, -Magnos106, -Uras14 Category 2G Analyzer Modules

Vacuum Pumping process for Large Camera Dewars supplied by PixelVision of Oregon

ROTARY EVAPORATORS EVAPORATION SOLUTIONS

Vacuum - The Universal Conveying Force Suction and transportation of powders, liquids and gases

Buehler Cast N Vac 1000 Embedding System

INSTRUCTION- AND MAINTENANCE MANUAL FOR ELECTROMAGNETIC AIR PUMP JDK-60, JDK-80, JDK-100, JDK-120

Mechanical Vacuum Systems for Secondary Metallurgy Steel Degassing

EN - english. Instructions for installation and operation. Mobile humidity meter DP 207

FINO Kältetrockner. Original FINO

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

Operating instructions

INSTRUCTIONS RHS 700. Recovery, Recycling, Evacuation and Charging Station RHS 700

BASELINE P 100. Chamber machine. 290 x 205 x 90 mm

Intelligent. Evaporation. Leading Safety Standards. Superior Ease of Use. Reduced Cost of Ownership

EYS SEPARATOR EYS 01 G. USER MANUAL for EYS SCREW-PRESS SEPARATOR MODEL EYS 01 G. User Manual for EYS 01G Screw-Press Separator

OWNER S MANUAL FOR DRY VACUUM PUMPS MODELS: / / / 2047

Transcription:

page 1 of 8 Technology for Vacuum Systems Instructions for use GKF 1000i Cold trap

page 2 of 8 Content Safety information!...3 General information...3 Intended use...3 Setting up and installing the cold trap GKF 1000i...3 Ambient conditions...3 Operating conditions of cold trap GKF 1000i...4 Safety during operation...4 Technical data...5 Wetted parts...5 Device parts...6 Use and operation...7 Installing in a vacuum system...7 During operation...7 Maintenance and cleaning...8 Accessories / Spare parts...8 After sales service: Contact your local dealer or call +49 9342 808-5500. DANGER indicates a hazardous situation which, if not avoided, will result in death or serious injury. WARNING indicates a hazardous situation which, if not avoided, could result in death or serious injury. CAUTION indicates a hazardous situation which, if not avoided, could result in minor or moderate injury. is used to address practices not related to personal injury. Trademark index: VACUU LAN (US-Reg.No 3,704,401), VACUU BUS, VACUU CONTROL TM, chemistry-hybrid TM, Peltronic, TURBO MODE TM, VARIO, VARIO-SP TM, VACUUBRAND (US-Reg.No 3,733,388) and also the shown company logos are trademarks of VACUUBRAND GMBH + CO KG in Germany and/or other countries.

page 3 of 8 Safety information! General information Read this manual carefully before installing or operating the equipment. Observe the instructions contained in this manual. Comply with technical data and notes on use and operation. Do not use any damaged equipment. Prior to every use: Check the cold trap for damage. The glass surfaces must be free from damage, notches, cracks or scrapers. Remove the product from its packing-box. If the equipment is damaged, notify the supplier and the carrier in writing within three days; state the item number of the product together with the order number and the supplier s invoice number. Retain all packing material for inspection. In case, mount enclosed components. Intended use Comply with notes on correct vacuum connections, see section Use and operation. Use the cold trap for the intended use only, i.e., for the condensation of vapours in vacuum installations. Suitable coolants: Liquid nitrogen (LN 2 ) or acetone-dry ice (CO 2 ) mixtures. Setting up and installing the cold trap GKF 1000i Prevent any part of the human body from coming into contact with vacuum or with cryogenic coolant. Assemble the cold trap to a base plate or or fixate at a stand mounting. Provide a firm, level platform. Check that the system to be evacuated as well as the hose and ground joint connections are mechanically stable and that all fittings are secure. Note: Flexible elements will shrink when evacuated. Prevent mechanical stress at the connection due to tensile force or vibrations. Connect hoses gas tight towards the vacuum installation and towards the inlet of the vacuum pump. Maximum operating pressure: 1.1 bar absolute. Comply with all applicable and relevant safety requirements (regulations and guidelines). Implement the required actions and adopt suitable safety measures. Ambient conditions Pay attention to the permissible maximum ambient temperatures between +10 C and +40 C (see Technical data ).

page 4 of 8 Operating conditions of cold trap GKF 1000i The cold trap GKF 1000i is not suitable to condensate - unstable substances, - self inflammable substances, - substances which are inflammable without air and - explosive substances. Safety during operation Adopt suitable measures to prevent the release of dangerous, toxic, explosive, corrosive, noxious or polluting fluids when draining condensate. Adopt suitable measures to prevent the formation of explosive or flammable mixtures. Oxygen may condensate at the temperature of liquid nitrogen, use inert gas for venting if necessary. A great amount of gas can be absorbed on cold surfaces. The gases may expand abruptly in case of warming. This may lead to inadmissible overpressure in the system. Risk of bursting! Check coolant level in the cold trap during operation at appropriate intervals. Coolant may overflow unexpectedly, e.g., in case of large amounts of gas. Comply with applicable regulations when disposing of condensates. Take into consideration that the condensate may be polluted. Take adequate precautions to protect yourself and other people from the effects of dangerous substances (inhaling or skin contact). Wear appropriate safetyclothing and safety glasses. Use only genuine spare parts and accessories. Otherwise safety and performance of the equipment might be reduced. Do not use damaged components. Perform a visual check of the cold trap prior to every use. Check the cold trap for damage: There must be no damage, notches, cracks or scrapers on the glass surface. Comply with all applicable safety measures and requirements when using cryogenic coolants. Use only transport receptacles intended for coolants. Wear safety glasses and protective gloves. Do not clamp the covers of coolant receptacles. Ensure pressure compensation between coolant receptacle and atmosphere at any time. Check condensate level regularly and drain condensate in time (condensate drain valve). To the best of our knowledge the cold trap GKF 1000i is in compliance with the requirements of the applicable standards and directives.

page 5 of 8 Technical data Cold trap Connection to vacuum pump GKF 1000i glass tubing, outer diameter 22 mm Connection to recipient female ground joint NS 29/32 Coolant Coolant capacity approx. Lifetime of coolant (for N 2, p < 10-3 mbar, ambient temperature 20 C) approx. Condensate capacity approx. Maximum permissible range of operation pressure Permissible ambient temperature range Dimensions (diameter x height) Weight approx. liquid nitrogen (LN 2 ) or acetone-dry ice (CO 2 ) mixture 1 l 14 h 0.25 l from vacuum up to 1.1 bar absolute +10 C to +40 C 148 mm x 580 mm 4.1 kg Wetted parts Components Cold trap Valve (condensate drain) O-ring (condensate drain) Wetted materials Borsilicate glass PTFE FPM

page 6 of 8 Device parts Position Component 1 connection of recipient (female ground joint NS 29/23) 2 connection of vacuum pump (glass tubing, outer diameter 22 mm) 3 sheet metal shield (protection against disintegration in case of implosion) 4 cover 5 condensate drain valve 6 sight strip for coolant and condensate GKF 1000i 1 2 3 4 5 6

page 7 of 8 Use and operation Installing in a vacuum system PC 3 (1) (2) Remove the transportation safety device (foam insert) in the cove of the cold trap. Grease the ground joints prior to use with vacuum grease. Assemble the cold trap to a base plate or fixate at a stand mounting. Connect the cold trap to the vacuum pump and the recipient. Prevent mechanical stress at the connection due to tensile force or vibrations. Close the condensate drain valve. Due to the O-ring, the valve seals already at small contact pressure of the valve face. PC 3 with GKF 1000i: Assemble the separately packed vacuum hose (1) between the cold trap (connection of vacuum pump) and the inlet of the rotary vane pump / Chemistry HYBRID pump RC 6 (small flange connections NW 16, see figure). During operation Remove cover and plastic insert of the cool trap. Fill coolant into the coolant chamber. Switch on the vacuum pump immediately after filling in the coolant. Open valve (2) between vacuum pump and cold trap (PC 3). Do not pump condensable vapours or gases until the vacuum pump has reached its operating temperature. The coolant consumption is increased if the condensate chamber is not evacuated. The lifetime of the coolant may be restricted due to icing in case of high operating pressures. Vent the cold trap for de-icing or draining of condensate. Check coolant level at appropriate intervals. Check the level of condensate at appropriate intervals and if necessary drain condensate via the condensate drain valve. Vent the system prior to opening the drain valve!. - Wait until the condensate has liquidised, if necessary. Ensure that condensate drain tubing and collecting equipment are chemically resistant against the condensate.

page 8 of 8 Remove the cold trap from the vacuum installation to drain the coolant if necessary. Maintenance and cleaning - The cold trap is maintenance-free. - Clean the metal cover of the cold trap using water only. - Clean the coolant chamber and the condensate chamber using water or solvent. Ensure compatibility of the wetted parts. Comply with applicable regulations when disposing of solvents. Accessories / Spare parts Special coupling... 20667057 (stainless steel; coupling to connect a glass tube with outer diameter 22 mm to a small flange NW 16) Special coupling... 20667055 (stainless steel; coupling to connect a glass tube with outer diameter 22 mm to a small flange NW 25) Coupling... 20662705 (stainless steel; to connect a ground joint NS 29/32 to a small flange NW 25) O-ring 3.5 x 1.5, FPM (at the condensate drain valve)... 23120560 VACUUBRAND GMBH + CO KG -Technology for Vacuum Systems- 2018 VACUUBRAND GMBH + CO KG Printed in Germany Alfred-Zippe-Str. 4 97877 Wertheim / Germany T +49 9342 808-0 F +49 9342 808-5555 info@vacuubrand.com www.vacuubrand.com 20901370 / 01/07/2018