MEETING MINUTES. Attendees

Similar documents
BAYFRONT INDUSTRIAL AREA RENEWAL STRATEGY. Public Open House #1

BAYFRONT INDUSTRIAL AREA RENEWAL STRATEGY

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

The West Vaughan Employment Area Secondary Plan Policies

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

Elfrida Growth Area Study

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

WELCOME and introduction

Niagara GO Hub and Transit Stations Study

TOWN OF INNISFIL SPECIAL COUNCIL AGENDA OUR JOBS INNISFIL HEIGHTS WORKSHOP WEDNESDAY JANUARY 20, :30 P.M.

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Transforming Saint John s Urban Heart -

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

MOUNT PLEASANT SECONDARY PLAN & VILLAGE BLOCK PLAN. Wednesday, March 5, 2008 Informal Public Open House

1 Port Street East: Delivering on the Vision. Andrew Whittemore Director, City Planning Strategies. Ruth Marland. TOPCA May 23, 2017

Community Design Guidelines. Port Wallace DRAFT

General Committee Presentation. Paddy Kennedy, MCIP, RPP Dillon Consulting Limited

Derry Green Corporate Business Park

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Downtown Streetscape Manual & Built Form Standards

City of St. Thomas New Official Plan

Lambeth Main Street Streetscape Improvements

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

City of Welland Commercial Policies. Public Information Centre March 25 th, 2009

MAYFIELD WEST SECONDARY PLAN PHASE 2

PRELIMINARY DESIGN + DEVELOPMENT PLAN

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

ATTACHMENT. To the west, north, and east of the block, primarily singlefamily detached residential patterns, with some townhouses, predominate.

Public may provide comments on the GDP within the next two weeks (December 24)

Downtown Whitby Action Plan

Queensborough Eastern Neighbourhood Node. Community Open House

WITNESS STATEMENT Of. Ronald Blake. On behalf of the Intervenor The Corporation of the City of Markham

Further input invited as Colchester Growth Strategy nears final phase

Report to: Development Services Committee Report Date: April 24, 2017

PMP PRINTING SITE COMMUNITY ENGAGEMENT - PHASE 2

LAKEVIEW LOCAL ADVISORY PANEL. THE COPORATION OF THE CITY OF MISSISSAUGA THURSDAY, NOVEMBER 18, 2010

Getting and Giving the Most

The Trinity River Corridor, offering Dallas areas of natural

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

V. Vision and Guiding Principles

Welcome. Walk Around. Talk to Us. Write Down Your Comments

New Official Plan Quest November 2013

38 Queen s University Campus Master Plan Part 1

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area.

NO: R035 COUNCIL DATE: FEBRUARY 24, 2014

Official Plan Review

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Town of Peru Comprehensive Plan Executive Summary

JASPER PLACE. Area Redevelopment Plan

Complete Neighbourhood Guidelines Review Tool

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

18 May 2016 CAMPUS MASTER PLAN UPATE

FUTURE LAND USE ELEMENT

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

Chair and Members of the Planning, Public Works and Transportation Committee. Tara Buonpensiero, Senior Planner Policy, MCIP, RPP

Niagara Region Official Plan. Table of Contents

Living in Albemarle County s Urban Places

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

7Page 1 CLEMMONS COMMUNITY COMPASS 1 PLAN OVERVIEW

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion

Agincourt Mall Planning Framework Review Local Advisory Committee Meeting #1 Summary

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

Hamilton Pier 7&8 Public Meeting and Workshop #1

Plano Tomorrow Vision and Policies

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

Brampton. Secondary Plan. Review. Bram West. A New Direction in Planning & Public Consultation

West Ocala Vision & Community Plan City Council Work Session. Presented by West Ocala Community Plan Steering Committee

What We Heard. Downtown Georgetown Planning Study. April 4, 2018

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

1 October Dear Citizens of Charlotte and Mecklenburg County,

City of Toronto. Emery Village Transportation Master Plan

Draft Urban Hamilton Official Plan. Amendment No. XX

Background Summary Report

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Gary & Regional Investment Project. October 27, Creating Tomorrow Today Comprehensive Regional Plan - NIRPC

Implementation Guide Comprehensive Plan City of Allen

The Master Plan Framework

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development

CITY OF UNION CITY MINUTES GENERAL PLAN ADVISORY COMMITTEE

EXISTING COMPREHENSIVE PLAN

A. WHAT IS A GENERAL PLAN?

A larger version of this map is located on the last page of this PDF.

Long Branch Neighbourhood Character Guidelines Final Report

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

Policies and Code Intent Sections Related to Town Center

TOWN OF BRUDERHEIM Report to the capital region board

How can we improve mobility and access?

Memorial Business Park Site. Proposed Future Development. Design guidelines. August

4 Study Findings. Port Credit District. Port Credit District

1 Welcome! UBC Okanagan Master Plan Update - Open House

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

Edward R. Sajecki Commissioner of Planning and Building

Urban Design Brief. Watson Parkway North & Watson Road North Guelph, Ontario. Prepared by Coletara Development

Transcription:

Page 1 of 9 MEETING MINUTES Subject: Bayfront Industrial Area Renewal Strategy Focus Group Meeting #2 Date and Time: Thursday, May 24, 2018 4:00 p.m.-6:30 p.m. Location: The Eva Rothwell Centre, Boardroom, 460 Wentworth Street North, Hamilton, ON, L8L5W8 Our File: 16-4534 Attendees Christine Newbold Tiffany Singh Norm Schleehahn Christine Strupat Mark Hefferton Patrick Kennedy Melissa Kosterman Rob Zeidler Juby Lee Steve Rowe Karen Logan Liz Tobin Huzaifa Saeed Larissa Fenn Regrets: Lynda Lukasik Terry Charters Kimberley Gutt Sandi Stride Fawn Sault City of Hamilton, Community Planning City of Hamilton, Community Planning City of Hamilton, Business Development City of Hamilton, Community Planning City of Hamilton, Community Planning Dillon Consulting Limited Dillon Consulting Limited The Cotton Factory Environment Hamilton Keith Neighbourhood Hamilton Industrial Environmental Association Lucy Day Group / Sherman Hub Chamber of Commerce Hamilton Port Authority Environment Hamilton Stelco Sustainable Hamilton & Burlington Centre for Climate Change Management Mississaugas of the New Credit First Nation Notes The purpose of the meeting was to provide a status update to the Focus Group, introduce the Vision and Objectives, discuss draft scenarios and next steps

1. WELCOME AND INTRODUCTIONS Tiffany, Christine and Paddy introduced the purpose of the meeting. All in attendance introduce themselves. Paddy further introduced the projects to attendees. 2. BACKGROUND Paddy initiated the presentation and highlighted a refresher regarding the background and the intent for the project including the study area, reasons for the strategy, phase 1 recommendations, study process, study objectives, and lessons learned. o A question was raised about why certain residential areas are not included in the study area boundaries while some are. Some areas that currently have residential dwellings are in fact zoned industrial. The excluded pockets are the ones that are zoned residential. Many of the residential neighbourhoods found in this area existed before there was zoning regulating separation distance between certain uses. Much of the residential was developed to support the industrial uses Question to group Should we expand the study area to include those outside the employment / industrial use? o A comment was made that citizens are becoming more engaged and usually there is harmony between the existing industries and residential. When there are problems is when industry upsets this balance. o A comment was made that it might be helpful to have the history of Hamilton information available, how it s evolved. The book titled The People and the Bay: A Social and Environmental History of Hamilton Harbour should be made available on the City s website. No action City to locate and link to historic video information. 3. STATUS UPDATE Paddy continued with the presentation and presented a status update for the project including activities since May 2017; who we have engaged with; and, key issues and opportunities. o A concern was raised that we are proposing the elimination of heavy industry and K zoning. It was clarified that industrial uses are not being eliminated. Instead the K zoning under Zoning By-law No. 6593, related to lands around Hamilton Harbour

(port lands) is being replaced with zoning that is generally consistent with other industrial areas in the City, and bringing the lands into the City-wide comprehensive Zoning By-law No. 05-200. This transition has been part of a consultative process between the City and the Hamilton Port Authority. 4. VISION & OBJECTIVES Paddy presented the Vision for the Bayfront as well as the objectives. Project Process during the first portion of the presentation. o The Navy Yards image from Philadelphia provides a very suburban context. Prefer to see more urban context (there was lots of discussion regarding the elements of a suburban business park vs. an urban context.) Encourage walkability, less focus on cars and parking. It Is understood however that there is and will remain a need to maintain the truck and transport traffic which is essential to maintaining a health employment area Trucks and transportation as well as parking will still need to be accommodated. It was noted that several hierarchies of streets will need to be observed to support the functions of the Bayfront. Some more transportation focus and others more pedestrian and public realm focused. o A question was asked if the Transportation Master Plan is connected to this strategy. The TMP is currently being revised. The draft is scheduled to be released in the next few weeks for public comment. It will be reviewed and considered as we move forward with the action and strategy component of this project. o It was noted that for air and water quality, industries should meet the provincial standards and should be held accountable if they fail. It was noted we could add some stronger language in the objectives. However, it was also noted that industries are ultimately accountable to Provincial standards and regulations, so keeping our objectives for the scope of this project higher level and indicating that there is an overall interest in improving air and water quality may be sufficient given our jurisdiction. o A question was asked if we will be providing direction for private properties. It was noted that this study will provide urban design guidelines which will be applicable to both public and Attempt to find more urban industrial examples.

private realms. o There was discussion around tree planting. Trees Please Hamilton was mentioned as a way that citizens are becoming more involved in the urban forest in Hamilton. Citizen scientists are inventorying trees, and collecting particulate matter levels using air monitors. Trees Please is a project of the Hamilton Naturalists Club and Environment Hamilton. Also incentives for landowners to plant trees. o There was a question about if the Steering Committee had seen the scenarios. It was clarified that yes the Steering Committee had seen the scenarios and large landowners that aren t on the committee are being consulted with one-on-one (Empire Steel / 440 Victoria). 5. SCENARIOS Melissa presented the first scenarios in Area 1 Scenario 1. After which the activity began with break out groups to discuss each Area and its scenarios. Group discussion during Area 1 is captured below: o Empire Steel Scenario generally the group felt strongly that the mock up example of changes doesn t capture the significant attributes of the site. The building layout and parking lots in the medium and long term options look too suburban and don t fit the urban context and close proximity to Barton Street. Should try to preserve some of the larger building formats, as they are hard to come by in urban settings and with close proximity to rail and port. Warehousing is an essential component of supply chains that support employment in other areas of the City. Thus, storage and warehousing will continue to be a necessary component to this employment area (especially for the steel industry). The very close proximity to rail is what makes this an ideal industrial site and different from other pockets within the study area. The original brick building may be of cultural heritage value, and could be a great example of adaptive reuse similar to the cotton factory. One suggestion is that the team looks at Hamilton Specialty Bar instead of Empire Steel since there were there were significant opinions on the latter. It was noted that we make sure to show the connections to outside of the study area and now it will affect the No

surrounding neighbourhoods. Barton Street is revitalizing and will be a connector / catalyst for development. Comment that storage and warehousing will continue to be necessary especially in the steel industry. 6. ACTIVITY (DISCUSSION REPORT BACK) AREA 2 o Make sure we have high regard for industrial uses. There are trucks that are required. As area evolves goods movement may change but be cognizant of the dynamics. o Mix of uses / diversity is needed to complement current industrial uses. These supportive uses could include small retail / banks / services. At the edges especially there is a good opportunity for a great mix. o There needs to be a sense of streetscape, building frontages on the street with a good streetscape. There needs to be safety / eyes on the street. o Centre Mall is a good example of what not to do. o Focus on transportation, rail access is important. The most valuable industrial land is located along the rail corridor. Preserve this land for the heaviest industrial uses. AREA 3 o Make sure to call out all things that are going on, Barton Street is becoming more vibrant. o Opportunities for major recreational space, cultural recreation corridor. o There are land use compatibility issues. o Wayfinding is needed in this area. It is something that can be done better. AREA 4 o Operations and maintenance need to be forecasted with improvements otherwise trees will not have a healthy survival rate. o Approach Orlick to sever the property now to get the open space. o Section of Barton Street is not maintained nicely, opportunity for greening. o Public overpasses over the railway, they could act as a gateway feature. o Long grasses and shrubs could cause CPTED issues and wildlife conflicts (coyotes), sightlines etc. o Entrances on Barton should face the street, bring buildings to street edge. o More planting along Barton, opportunity to provide permeable

paving solutions. o Wayfinding and water stations where possible along the offroad trail. o Move the pipeline trail proposal up from the medium term to the short term. o At the edges, opportunity to provide mix of uses in buildings, above grade. Maybe residential if it s allowed. o Do not ignore the rail corridor, it is part of the necessary infrastructure landscape. 7. ADJOURNMENT Tiffany and the team thanked participants for attending the focus group and for their participation. Noted that we will send electronic information to the Focus Group including the Hamilton Chamber of Commerce. Meeting adjourned at 7:00pm. No Meeting Adjourned Please send revisions to Melissa Kosterman at mkosterman@dillon.ca

MEETING MINUTES Page 7 of 9 ACTIVITY AREA 2 Discussion Maps DILLON CONSULTING LIMITED

Page 8 of 9 AREA 3 Discussion Maps DILLON CONSULTING LIMITED

Page 9 of 9 AREA 4 Discussion Maps DILLON CONSULTING LIMITED