NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

Similar documents
SECTION SODDING

SECTION SODDING

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod.

Section Seeding

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

SECTION 900 TURF ESTABLISHMENT

LAWNS Chapter 12. Topic Outline. Establishing a Lawn. Establishing a Lawn

A. Provide labor and materials necessary for installation of turf sod and other related work as required.

Turfgrass Sod General

a. Section includes planting soils specified by composition of the mixes.

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

SECTION TURF AND GRASSES

Section 815. LANDSCAPING

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

ITEM 164 SEEDING AND EROSION CONTROL BLANKET

SECTION FINE GRADING AND SOIL PREPARATION

A. Surface parking areas shall be constructed of bituminous paving.

SECTION LANDSCAPING

Lawn Solutions Australia. Simple specifications for turf installation

SECTION 605 PLANTING

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

Content. 1. Particular Preambles for Standard Method of Measurement. 2. Particular Specification for Soil Fiber System. 3.

SITE TOPSOIL & FINISH GRADING

EXTERIOR PLANTS

Section 9 Landscaping and Street Trees

Section Lawn & Grasses Pearl s Premium DRAFT. Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification.

SECTION SOIL PREPARATION

Lawn Care for Disease Control

Water Efficient Lawn Care for North Texas

Earthwork Excavating, Backfilling, and Compaction for Utilities Irrigation System Landscaping.

LAWN. (fane utd 'TfCacHtciuutce. Extension Circular 657 May Federal Cooperative Extension Service Oregon State College Corvallis

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

Exhibit A. Scope of Work

SECTION LANDSCAPING

What You Need to Know About Home Lawn Fertilizers

SECTION LANDSCAPE

Guide for Laying Your New Lawn

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

B /02. Lawn WATER MANAGEMENT

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

Installing and caring for your low maintenance lawn

Lesson 2 of 4. Self-Guided Educational Module

Your Yard and Pond are Connected RYAN RYCZEK ENVIRONMENTAL SPECIALIST II

XERISCAPE The conservation of water and energy through creative landscape.

SECTION AMENDED TOPSOIL

Marine Advisory. 100% Recycled / 20% Post-Consumer

Hollywood Management Guidelines

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

Tel

2015 Pond Area Landscape Maintenance Specifications

Section 816. TURF ESTABLISHMENT

Wildflower Planting for Golf Courses

Lawn Problems. an integrated pest management approach. Grow Green Landscape Professionals Training June 23, 2015 Austin, TX

INSTALLATION TIPS. Site Preparation

Watering Guide. 1. Trees, Shrubs, Perennials, Annuals Sod Seed Pruning Plants Fertilizing Plants...

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

CARING FOR YOUR NEW Landscape

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

DIVISION II PLANTING SECTION 02950

Content. 1. Particular Specification for Green Roof System. 2. Drawing. 3. Particular Preambles for Standard Method of Measurement

Get help from landscape experts.

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule.

Spring Turf Care. Pedro Perdomo Nisso America, Inc. HGS March

Preparing Your Lawn for Spring and Summer. Pedro Perdomo Nisso America, Inc. HGS March

SOD INSTALLATION AND CARE GUIDE. Over 40 Years of QUALITY SOD & QUALITY SERVICE. Delivery, Installation & Pick-Up

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

LAWN RENOVATION & OVERSEEDING

for Owners and Maintenance Staff

317)

Chapter 4 - Lawn establishment

SECTION LANDSCAPE ESTABLISHMENT

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS

Development and Maintenance of Lawn and Turf

Toronto District School Board Church Street Junior Public School

Maintaining a Healthy Lawn

City of Summer side. Turf Management Procedures

How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension

Why Control and Prevent Erosion?

SECTION LANDSCAPING

Chapter 1 - Lawn maintenance scheduling

Homeowner s Guide to Basic Landscape Care in Colorado

Vegetation. Fe=0.90 (When fully established; lower while vegetation is first growing)

SECTION TREES, PLANTS AND GROUND COVERS

ATTACHMENT A BIORETENTION SOIL SPECIFICATION

Virginia Nutrient Management Standards and Criteria Revised July 2014

SECTION TOPSOIL AND SEEDING

This section covers the planting of seed, sod, trees and vegetation.

fertilization: environmental impact

Tips and information for homeowners on lawn care practices, soil health, and common pests.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

5.0 Storm Water Landscape Guidance Introduction

Transcription:

Section 02922 PART 1 GENERAL 1.01 SUMMARY This Section includes the following: A. Restoration of existing lawn areas disturbed by construction shall be by installation of new sod. B. Planting of sod within areas designated on Plans for purpose of surface stabilization, channel stabilization or vegetation buffer strips. C. Sod is defined as blocks, squares, strips of turf grass, and adhering soil used for vegetative planting. To be placed edge to edge for complete coverage. D. Lawn is defined as ground covered with fine textured grass kept neatly mowed. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for sodding is on square yard basis. 2. Refer to Section 01270 Measurement and Payment for unit price procedures. B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for Work in this Section is included in total Stipulated Price 1.03 REFERENCES Texas Department of Agriculture Structural Pest Control Service of the State of Texas. 1.04 SUBMITTALS Conform to requirements of Section 01330 Submittal Procedures. 1.05 RELATED REQUIREMENTS A. Section 01270 Measurement and Payment B. Section 01330 Submittal Procedures 02922-1

C. Section 01576 Waste Material Disposal 1.06 QUALITY ASSURANCE A. Sod only when weather and soil conditions are deemed by Project Manager to be suitable for proper placement. B. Water and fertilize new sod. C. Guarantee sod to be growing 30 days after substantial completion. D. Maintenance Period: 1. Begin maintenance immediately after each section of grass sod is installed and continue for 30 day period from date of substantial completion. 2. Resod unacceptable areas. 3. Water, fertilize, control disease and insect pests, mow, edge, replace unacceptable materials, and perform other procedures consistent with good horticultural practice to ensure normal, vigorous, and healthy growth. Install disease control within guidelines set forth by the Structural Pest Control Service of the State of Texas. E. Notify Project Manager 10 days before end of maintenance period for inspection. 1.07 1.13 NOT USED PART 2 PRODUCTS 2.01 MANUFACTURER(S) (NOT USED) 2.02 MATERIAL AND/OR EQUIPMENT A. Sod 1. Species: Bermuda (Cynodon Dactylon), Buffalo (Buchloe Dactyloides), or St. Augustine (Stenotaphrum Secundatum) Gulf Coast variety to match existing sod. 2. Contents: 95 percent permanent grass suitable to climate in which it is to be placed; not more than 5 percent weeds and undesirable grasses; good texture, free from obnoxious grasses, roots, stones, and foreign materials. 3. Size: 12 inch wide strips, uniformly 2 inches thick with clean-cut edges. 02922-2

4. Sod is to be supplied and maintained in healthy condition as evidenced by grass being normal green color. B. Fertilizer Available nutrient percentage by weight: 12 percent nitrogen, 4 percent phosphoric acid, and 8 percent potash; or 15 percent nitrogen, 5 percent phosphoric acid, and 10 percent potash. C. Weed and Insect Treatment D. Water Provide acceptable treatment to protect sod from weed and insect infestation. Submit treatment method to Project Manager for approval. Install insect and disease control within guidelines set forth by Structural Pest Control Service of the State of Texas. Potable, available on-site through Contractor's water trucks. Do not use private resident's water. E. Bank Sand Free of clay lumps, roots, grass, salt, or other foreign material. 2.03 2.04 NOT USED PART 3 EXECUTION 3.01 GENERAL / MANUFACTURER(S) (NOT USED) 3.02 PREPARATION A. Verify that soil placement and compaction have been satisfactorily completed. Verify that soil is within allowable range of moisture content. B. Top soil shall be free of weeds and foreign material immediately before sodding. C. Do not start Work until conditions are satisfactory. Do not start Work during inclement or impending inclement weather. D. Rake areas to be sodded smooth, free from unsightly variations, bumps, ridges, or depressions. E. Spread 2 inch layer of bank sand over areas to be sodded prior to planting of sod. 02922-3

F. Apply fertilizer at rate of 25 pounds per 1000 square feet. Apply after raking soil surface and not more than 48 hours prior to laying sod. Mix thoroughly into upper 2 inches of soil. Lightly water to aid in dissipation of fertilizer 3.03 ERECTION/INSTALLATION/APPLICATION AND/OR CONSTRUCTION A. Full Sodding: Lay sod with closely fitted joints leaving no voids and with ends of sod strips staggered. Lay sod within 24 hours of harvesting. B. On slopes 2:1 and steeper, lay sod perpendicular to slope and secure every row with wooden pegs at maximum 2 feet on center. Drive pegs flush with soil portion of sod. C. Prior to placing sod, on slopes 3:1 or where indicated, place Hold/Gro or Roll Lite or equal over topsoil. Securely anchor in place with posts sunk firmly into ground at maximum 16 feet on center along pitch of slope and equal to width of wire mesh horizontally across slopes. D. After sod is laid, irrigate thoroughly to secure 6-inch minimum penetration into soil below sod. E. Tamp and roll sod with approved equipment to eliminate minor irregularities and to form close contact with soil bed immediately after planting and watering. Submit type of tamping and rolling equipment to be used to Project Manager for approval, prior to construction. F. Maintenance 1. Watering: a. Water lawn areas once a day with minimum ½ inch water for first 3 weeks after area is sodded. b. After 3 week period, water twice a week with ¾ inch of water each time unless comparable amount has been provided by rain. c. Make weekly inspections to determine moisture content of soil unless soil is in frozen condition. d. Water in afternoon or at night to enable soil to absorb maximum amount of water with minimum evaporation. 2. Mowing: a. Mow sod at intervals which shall keep grass height from exceeding 3½ inches. b. Set mower blades at 2½ inches. 02922-4

c. Do not remove more than one-half of grass leaf surface. d. Mow sodded areas requiring mowing within 1 month after installation with light-weight rotary type mower. Mow sod only when dry and not in saturated or soft condition. Remove grass clippings during or immediately after mowing. 3. Fertilizer and Pest Control: a. Evenly spread fertilizer composite at rate of 40 pounds per 5,000 square feet or as recommended by manufacturer. Do not place fertilizer until 2 weeks after placement of sod. b. Restore bare or thin areas by topdressing with mix of 50 percent sharp sand and 50 percent sphagnum peat moss. c. Apply mixture ¼ to ½ inch thick. d. Treat areas of heavy weed and insect infestation as recommended by treatment manufacturer. 4. Restrict all traffic from sodded areas until sod is established or for minimum 10 days during growing season. Use wood lath and plastic tape to cordon sodded areas. Maintain tape and lath throughout for minimum 30 days during growing season. 3.04 3.06 NOT USED 3.07 CLEANING A. During course of planting, remove excess and waste materials; keep lawn areas clean and take precautions to avoid damage to existing structures, plants, grass, and streets. B. Remove barriers, signs, and other Contractor material and equipment from project site at termination of establishment period. C. Dispose of unused materials and rubbish in accordance with Section 01576 Waste Material Disposal. 3.08 3.10 NOT USED END OF SECTION 02922-5