Challenge: Migrate Legacy BAS with Smoke Control

Similar documents
Advantage Services Capabilities

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

COMMERCIAL INDUSTRIAL OIL & GAS POWER GENERATION MOTOR CONTROL PLC PROGRAMMING EMERGENCY RESPONSE

Weekly Testing of Dedicated Stairwell Pressurization Fans- Metasys System Extended Architecture Code No. LIT

AUTOCALL FIRE DETECTION SYSTEMS.

Moving to the Cloud: The Potential of Hosted Central Station Services

Weekly Testing of Dedicated Smoke Control Dampers - Metasys System Extended Architecture

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

Integrated Automation Instrumentation & Terminal Devices

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

Trane Family of Terminal Products

SmartStruxure Lite Small Building Systems

THE INTELLIGENCE BEHIND THE MOST INNOVATIVE FIRE DETECTION SYSTEMS

GMS GRAPHICAL MANAGEMENT SYSTEM

DX-9100/9120 Weekly Testing of Dedicated Stairwell Pressurization Fans

Comprehensive solutions for greater safety and security Answers for infrastructure.

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Florida Department of Transportation

Integrated Security and Building Automation Technology Solutions and Services. SDI Security Center of Excellence Charleston, SC

Job Name Control Systems Description Date

MULTI-PHASED FIRE ALARM AND MASS NOTIFICATION SYSTEM UPGRADES: The Authority Having Jurisdiction (AHJ) and Proper Planning

KELTRON LS 7000 ALARM MANAGEMENT SYSTEM Keltron Alarm Monitoring, Dispatch, and Reporting Software

Virginia Tech Standards for Building Automation System

SECURITY SOLUTIONS Banking and finance

BRING YOUR VISION TO REALITY

Community Unit School District 200 Facilities

Computing Services Center

Scott Barrett, President

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager.

A new view on building protection. Cerberus DMS makes building protection smarter, easier and more flexible. Answers for infrastructure.

High Rise Floor Wardens

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Building Automation System (BAS) Design Criteria

2015 BUDGET FIRE DEPARTMENT

P2000 and Metasys System Integration

Ultimate Security Provider

BASIC INFRASTRUCTURE CONT. & TRAD.

Fire & Life Safety. June 2018

Sigler Controls Technical Development Program

POWER UP WITH TP ELECTRIC, INC.

Underfloor Air Systems. How It s Different: Overhead vs. Underfloor Air Systems

Electronic Safety and Security

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

Automatic swing door solutions. We make access in life smart and secure.

Lighting Control Relay Panels Lighting Control Solutions

Renovation Program. Renovation Program GENERAL

Delivering robust, integrated and future proof security into the UK Health Sector

Improved Lifecycle Management for BI. David Brockington SAP Business Objects, Product Management June, 2009

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

The Village of Shirlington

IMPORTANCE of FIREGROUND VENTILATION PRACTICES and DYNAMICS IN FIREFIGHTING (PART I)

Contractor Safety. Workplace Safety & Environmental Division

Micrel Case Study: Reducing Costs for Industrial Gas Cylinders Management 14 January 2008

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

Introduction. Company History & Overview

MISSION CRITICAL FIRE PROTECTION

Energy Commander Paralleling Switchgear

FRED S SORTER REBUILD

Metasys System Extended Architecture Smoke Control System

ESL-IC Smart Room Control

Perimeter Product Overview. Effective protection for your business

Connected Metro TRANSPORTATION MADE SEAMLESS. Unveiling the Capabilities of a Connected Metro

Consent Agenda. Meeting of June 14,2018

BAS Point Trend Data Guidance

AGENDA 282 BUILDING AUTOMATION SYSTEMS GOALS. BAS Systems. HVAC Systems. System Overview Benefits of BAS Future Trends

SECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN

AmpLight Lighting Management System

Climate control precision in Hi-tech environments Jupiter and Mercury Close Control Units

Infrared Inspection Reference Letters Commercial & Residential

Desigo Control Point The embedded building management station

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

Application Manual LT-6617 Rev. 1 July 2017

UNIVERSITY OF TOLEDO

The CWSI System CALL WITH QUESTIONS. RELY ON OUR KNOWLEDGE. DEPEND ON OUR EXPERIENCE. (800)

Fire Operator Workstation (Fire OWS) User s Guide

Facility Commander Wnx

Professional Security Officer Program(PSOP)

Metasys Integrator TITUS Application

DX-9100/9120 Warehouse Smoke Exhaust and Reset Logic for a Rooftop Unit

BP Alaska GC-1. Design Review Project. January 2003

ICONIC TRANSFORMATION LOWES, BROTHER AND THE ONLINE ENDEAVOUR

Smoke Control Manual

Metasys System Extended Architecture Smoke Control UL 864 UUKL Compliance

INNOVATION THAT LEAVES RISK BEHIND.

arm wire free solutions nurse call personal security fire alarms

Advances in Lighting Controls and the Impact of ASHRAE Requirements. Rich Rattray, LC OSRAM SYLVANIA

LonMark. Sheppard Air Force Base Wichita Falls, Texas

HEALTH, ENVIRONMENT AND SAFETY MANAGEMENT FOR FACILITIES MANAGERS COURSE OUTLINE

Redefining Customer Value

Richard H. Bradley Board of Directors Meeting April 25, A 21st Century Sustainability Framework

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

GE Security. Proven. Powerful. Integrated fire and life safety solutions.

NFPA 72 Code Changes vs 2013

PRO-WATCH NOTIFIER SECONDARY FIRE INTERFACE ARCHITECT AND ENGINEERING SPECIFICATION

York 25-Ton VAV Rooftop Unit

Effective Planning for Fire/Life Safety Upgrades

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Transcription:

Application Integration Best Practices and Lessons Learned Legacy BAS Upgraded Without a Single Hour of Downtime This article shares lessons learned and best practices in retaining an existing smoke control system on a project with unique building environmental conditions and building owner requirements. The Jackson Federal Building, in Seattle, Washington is operated by The U.S. Government General Services Administration (GSA). It houses 35 agencies and 2,300 government employees within its 37 stories. Construction of the building was completed in 1974 with pneumatic controls; the legacy BAS consisted of an aging Johnson Controls Metasys system with several generations of controllers, and much of the as-built information was missing, unreadable, or inaccurate. A smoke control system was added during a previous upgrade project. The building underwent an all-around efficiency upgrade, which included upgrading the building controls, replacing aging mechanical systems, replacing all building glazing, and adding lighting control. The existing smoke control application was to be integrated into the new building controls system. The prime contractor on this far-reaching energy management project was Howard S Wright, McKinstry was the Mechanical contractor and Engineer and ATS Automation was the controls contractor. Challenge of smoke control application to the project The ATS Automation engineering team knew before bidding the project that it would be necessary to demonstrate that their proposed solution could co-exist with the Metasys system before their proposal would be accepted. They took the time to research all available technologies and approaches. The creation of a master plan for the project was critical to the success of the project and was, in itself, a major undertaking.

Application Integration Best Practices and Lessons Learned The smoke control system depended heavily on the Metasys HVAC field devices and supervisory controllers. The HVAC and systems were intimately connected; touching either subsystem could have a major impact on the other. The new BACnet building level controllers would need to read the firefighters commands from the N2 controller in the Firefighters panel, and position VAV Boxes based on this input. Then, as the Smoke Control Panel overrode fans to run, the BACnet controller would have to write fan status data back to the N2 controller in the Firefighters Panel to manage the status lights. We were very apprehensive; we knew that this had never been done before, but were prepared to do whatever was necessary to make it happen. Our biggest concern was ensuring it happened right the first time this building is fully occupied, and a failure of the panel would be a very significant issue to the owner. -John Arwine, ATS Automation. Photography by Suraj Joshee Customer Requirement: No Downtime The building was to remain occupied during the upgrade and GSA mandated zero interruptions to tenants activities. VAV boxes and most of the N2 bus wiring were inaccessible, as they were installed above ceilings that were heavily contaminated with asbestos. Asbestos abatement would have added millions of dollars to

Application Integration Best Practices and Lessons Learned the cost of the project, along with displacing building occupants. Zero downtime of mechanical systems and controls was allowed during normal business hours. The requirement was to achieve a completely seamless migration to the new system. Gain Access to the Legacy BAS and Systems The first issue encountered was that the S4 Open: BACnet-N2 Router was not UL Smoke rated; a normal requirement for smoke control systems. However, the design scope depended upon an integration device cohabitating on the N2 trunk with a JCI NCM, and only the S4 Open appliance could do this. So ATS sent this question back to the owner s rep How do we accomplish your scope if there are no approved products? The owner s rep. requested a decision by the Authority Having Jurisdiction (AHJ). Note that this is a Federal property, and is governed by the Federal Fire Marshal, not local authorities. In the end, ATS received the authorization to use the S4 Open Appliance on the network without it being UL approved. After approval to move forward, ATS mounted new Alerton BCM building level controllers and performed as much pre-wiring as possible. Next, a S4 Open: BACnet-N2 Router was installed with each existing NCM to allow the new Alerton head end to co-exist with the Metasys NCMs programmed for HVAC control, the NCM, and the Operator Workstation during the planned transition period. After these preparatory steps, ATS continued with the integration. The Configure Wizard for each S4 Open: BACnet-N2 Router automatically discovered the N2 devices on the bus, provided BACnet point mappings, and activated the co-existence capability of the N2 Router, giving both the NCM and the Alerton BACnet head end equal access to the devices on the N2 bus. Test, Test, and Test Again! With 2,300 occupants in the building during the upgrade, the impact of any false alarm causing an evacuation of the building would have been catastrophic. Caution was the rule: ATS began testing by reading and writing the data from Envision graphics, but without truly taking over control of the building. ATS wrote software in the Alerton BCM global controller to control and optimize the JCI VAV boxes. They worked at night and on weekends to avoid disturbing building occupants, installing and testing their sequences through the S4 Open: BACnet-N2 Router. ATS would then remove the code after testing, letting the NCM run the system during the day. The downstream adapters

Application Integration Best Practices and Lessons Learned and upstream cable provided with the N2 Router facilitated easy changes in configurations as required. The smoke control application was tested until the team was fully confident they understood the effects of every action taken action / reaction, timing issues, etc. The ATS team took the extra time to thoroughly perform testing in order to avoid unexpected actions or lack of action by any of the equipment involved. Improving N2 Trunk Performance ATS planned to follow the S4 Group s recommendation of co-existing with the Metasys head end during a transition period. Aware that the JCI N2 trunks were heavily loaded, the ATS team took advantage of the ability to split trunks in several locations where the wiring could support it, thereby improving trunk loading. ATS also wanted to avoid the risk of coming up short on capacity if unexpected equipment were to be discovered on the network. The S4 Open Routers built-in statistics and performance metrics were instrumental in determining where N2 trunks were overloaded and provided a confirmation of improved performance. Unexpected Problem Requires Custom Solution The final step of the migration plan was to phase out the NCMs one at a time. After all of the Alerton BCM controllers were in place and programmed, it was discovered that scheduling data could not be easily deleted from the NCM one at a time, and writing to schedules from both control systems was problematic In response to this unexpected issue, the S4 Group provided a major enhancement to the S4 Open: BACnet-N2 Router, the ability to force N2 transactions coming from the NCM to utilize the BACnet Priority Array mechanism. This created the ability to move away from dependence on the NCMs one point at a time and smoothly complete the phase out process, and maintain the integrity of the smoke control system. This Supervisory Controller as a BACnet Client feature is now a standard part of all BACnet-N2 Routers. System Validation All pieces of equipment had to be cutover on weekends and ATS employees worked around the clock. After every cutover, but before occupancy, the smoke control system associated with that portion of the system were fully tested. The system was put into alarm and cycled through every

Application Integration Best Practices and Lessons Learned mode of smoke control. Many portions of the system were tested multiple times because they overlapped with several phases of cutover. After processes were in place and fully tested, the NCM s were removed and a fully functional integration with the smoke control application was implemented on the Alerton BACnet global controllers. ATS implemented some of the complex sequences in their global controller because the legacy VAV controllers could not support the required logic. Once the entire facility had been cutover and had passed a 100% confidence test (testing in phases every weekend) and documented, the Federal Fire Marshal was contacted to schedule a formal final test. Lessons Learned and Best Practices Test the interface extensively on a small section and perfect it before making a big deployment. Establish a relationship with the other contractors and the owner to approach and accomplish the project as a team. It pays off in the long run. Make sure that the manufacturers involved are part of your team and committed to the job. Have a methodology to do all the software sequences you intend to perform without any help from the VAV s. In this case, some complex sequences were implemented that would normally require software in the VAV controller that these controllers would not support. Be mindful of traffic levels: The N2 trunk runs at 9600 baud and would be passing a lot more data than the previous system ever had. The trunks were heavily loaded with controllers up to 125 on a single trunk. In this case, asbestos in the ceilings prohibited engineers from redistributing controllers on trunks. Ensure you have the software tools available to replace field controllers in the future. For Metasys N2 devices the essential tools are the HVAC Pro and GX-9100 utilities. And, most importantly, take a full backup of all controllers before you start. The ComBus Quick Tester (Source from The S4 Group) is an excellent investment. Use it to validate that the legacy equipment is properly installed and functional before starting the integration.

Application Integration Best Practices and Lessons Learned The Building Today: A Model Upgrade The new system is completely operated by an Alerton BACnet front end. All new Alerton controllers were installed on large built up AHU s, chiller plant, steam heat exchangers, existing boilers, but ATS was able to make use of the existing JCI VAV controllers on 1200 Dual Duct boxes, a half dozen or so computer room units, and one NCM running the Metasys smoke control application with a dozen JCI controllers downstream providing smoke control functionality. Alerton BCM global controllers collect energy data from dozens of electrical, steam, and water meters. S4 Open: BACnet-N2 routers are installed on every N2 trunk. The end user is quite happy with the new system a state of the art Alerton BACtalk control system that is easy to operate and allows for E-mailing of alarms, energy reporting, and secure web access-- all while saving several million dollars on asbestos abatement / control issues that would have been required to replace all of the VAV box controllers. Federal agencies are looking at this as a model retrofit / upgrade project.

Application Integration Best Practices and Lessons Learned About ATS Automation automation industry. ATS Automation has multiple office locations in Washington, Idaho, Alaska, Montana, and Colorado. The ATS management team has a strong local history of meeting customer commitments. This reputation and demonstrated commitment spans a quarter century in our local marketplaces. All ownership is local, and the entire management team shares a long history and trust in the building Their Seattle area office has created a unique work environment for our employees, combining tradition with modern technologies and innovation. The office is located in the historic "Old Milwaukee Substation" which produced DC power for the Burlington Northern rail line dating back to 1916. A recent addition incorporated many contemporary architectural and energy conservation strategies which further reinforce the ATS commitment to both employees and customers. ATS Automation s Mission Statement: Establish industry recognized excellence in the Facility Systems Business, by providing distinct and preferred products, installations, engineering, integration, and service support. About The S4 Group Delivering seamless open systems integration solutions for non-it and building automation systems. Our unique automation solutions enable new system architectures, compartmentalization of component upgrades, clean integration with existing BAS, as well as seamless integration with IT & enterprise management systems.

Application Integration Best Practices and Lessons Learned With S4 Group technologies, channel partners deliver better value to their clients. Our primary business model is to engage design/build teams, resellers, and mechanical, electrical, and HVAC contractors to extend systems lives, enhance buildings value, and create cost-effective solutions for migration. For more information contact Steve Jones at the S4 Group, Inc. sejones@thes4group.com