Red Deer. AMA Regional Meeting. Electrical, Plumbing, Gas, Private Sewage, Building and Fire

Similar documents
AMA Regional SCO Meeting Building, Fire, Electrical, Plumbing, Gas & Private Sewage October 25, :30 am 4:00 pm

JOINT CODE INTERPRETATION

2014 Alberta Building Code. Part 9 changes relating to Smoke and CO Alarms

BUILDING CODE INTERPRETATION

PORTABLE FIRE EXTINGUISHERS

MEETING NOTES. AMA Regional Building / Fire Safety Codes Officer Meeting

BOMA Calgary Luncheon Thursday, October 11, 2012 Building Owners Responsibilities for Fire Safety Equipment (Fire Alarm) Canadian Fire Alarm

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety

Should you have further questions, please feel free to contact the Fire Prevention Branch.

RESIDENTIAL CARE USER GUIDE UPDATES TO MANITOBA BUILDING/FIRE CODE:

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

BCBC 2012 CHANGES TO PART 3

Major Changes to the 2010 National Construction Codes Contractor s Breakfast January 2014

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

Building Standards Advisory Promoting construction of safe, healthy, habitable buildings

PROPOSED CHANGE TO THE 2007 FIRE CODE (OFC)

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

ELECTRICAL SAFETY Information Bulletin

Major Changes Nova Scotia Building Code 2011 Construction and Maintenance Regulatory Change Industry Briefing

AMA Regional SCO Meeting Building, Fire, Electrical, Plumbing, Gas & Private Sewage March 21, :30 am 4:00 pm

MAINTENANCE OF FIRE PROTECTION DEVICES WITHIN RESIDENTIAL SUITES OF MULTI-FAMILY BUILDINGS

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

Regional Meeting Fire

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

Part 3 BUILDING CODE MYTHS & INTERPRETATIONS

ELECTRICAL SAFETY Information Bulletin

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

AHJ PERSPECTIVE INTEGRATED SYSTEM TESTING. Eddy La Rocque

Fire Safety Plan Information. For Construction and Demolition Sites

PROPOSED CHANGE AFC Smoke Alarms Comment Page: 1 of 1

CFAA Alberta Technical Seminar October 24, 2013 Calgary

Interim Amendments to Ontario s 2012 Building Code Retirement Homes. August 17, 2017

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

BY-LAW AMENDING THE BY-LAW CONCERNING THE SERVICE DE SÉCURITÉ INCENDIE DE MONTRÉAL (RCG )

ELECTRICAL SAFETY Information Bulletin

NFPA Talking Points on NFPA 1 Fire Code update to the 2015 Edition:

IMO UNIFIED INTERPRETATIONS TO SOLAS CHAPTER II-2 AND RELATED FIRE TEST PROCEDURES

CFAA Alberta Technical Seminar 2010

CHANGES TO THE TEXT OF THE 2010 CODE BOOKS

Agency for Health Care Administration

SAFETY CODES COUNCIL ORDER. BEFORE THE FIRE TECHNICAL COUNCIL On June 21, 2012

Community Festival Permit Application - Cypriot Community of Toronto Inc. - Cultural and Wine Festival June 23 and 24, 2007

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

Short Term Accommodations Fire Code Requirements

Business License Pre-inspection Checklist

Is the address of your property clearly visible and marked in large numbers that can be easily seen from the street?

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED

FIRE SAFETY PLAN FOR CONSTRUCTION, RENOVATION AND DEMOLITION SITES

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE, 2000 EDITION SECTIONS

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

ICC Update - Laboratory Issues Code Changes / Proposals / Trends of Interest 10/2005

Report on First Revisions with Statement June 2014 NFPA 101

GAS SAFETY Information Bulletin

S 2758 S T A T E O F R H O D E I S L A N D

SIGNIFICANT CHANGES TO MINOR WORK AND ORDINARY MAINTENANCE

Large Family Daycare Guideline

Fire Sprinklers Working Group Final Report

FIRE SAFETY POLICY. 2.0 Under national, provincial and municipal fire regulations, the Board will ensure compliance with:

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

Please make yourselves familiar with the changes and start implementing them immediately so you can be better prepared for June 30 th, 2018.

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

ENERGY EFFICIENCY AFTER DECEMBER 31, 2016

Habitability Guidelines

COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE

Narrative Reports As Regulated by 780 CMR, Section 903.0

THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #6

BUILDER S PRE-INSPECTION CHECKLIST

IMC Significant Changes Summary Tier I

Construction Codes Advisory Council

Agency for Health Care Administration

CALIFORNIA DEPARTMENT of FORESTRY and FIRE PROTECTION OFFICE OF THE STATE FIRE MARSHAL UL 300

THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #5

COPYRIGHT ULC STANDARDS

January 1, 2014 Mandatory Effective Date

New Facilities. Minimum Requirements

BALTIMORE CITY RENTAL LICENSE INSPECTION FORM RENTAL LICENSING INSPECTOR GUIDANCE

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

The Cannabis Industry: Fire Department Requirements

Rental Housing Inspection Guide

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

2012 B.C. Building Code Compliance Review (Division B Part 3)

Canadian Commission on Building and Fire Codes Comment 215 PROPOSED CHANGE

BUILDER S PRE-INSPECTION CHECKLIST

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

FHCA 2014 Annual Conference & Trade Show

Agency for Health Care Administration

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

150 Elgin - Office Tower and Grant House Renovations

School Fire Safety Checklist

N.J.A.C. 5: A. NEW JERSEY ADMINISTRATIVE CODE Copyright (c) 2016 by the New Jersey Office of Administrative Law

Principal s Guide for Fire Safety Planning in Schools. To be kept in School Administration Office

Recent Revisions and Proposed Key Changes to Fire Code

It should be done through a connection authorization - Should be consistent for all LDCs, to avoid interpretation, public safety risk and liability

Retain. Retain. Retain. Board Advisory. Board Advisory. Retain. Disposition. (Statute, Rule, FBC, Industry)

WORKSHEET 4-1 THE MANITOBA FIRE RISK INDEX FOR THE RESIDENTIAL OCCUPANCY OF HERITAGE BUILDINGS FIRE SAFETY PARAMETERS

An Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010

Transcription:

Red Deer AMA Regional Meeting Electrical, Plumbing, Gas, Private Sewage, Building and Fire

AGENDA 8:30 am Call to Order and Introductions Mike Hill, AMA 8:35 am 8:45 am AMA General Updates Joe Healy, AMA Q & A 8:45 am 9:30 am Safety Codes Council Updates Tyler Wightman, Q & A Safety Codes Council 9:30 am 10:00 am Open Mic What is a kitchen? Air Admittance Valve Temporary Heat Private vs Public Washrooms Non-Metallic Electrical Boxes Wireless Interconnection of Smoke Alarms Q & A COFFEE BREAK 10:00 am 10:20 am Sponsored by the Safety Codes Council 10:20 am 11:45 am Break-Out Sessions Electrical Fairview Room Plumbing / Gas / PSDS Northlands Room Fire / Building Kentwood Room LUNCH 11:45 am 12:45 pm Sponsored by the Safety Codes Council

AMA Updates Joint Session Builders Licencing Regulations currently sit with the Cabinet for approval. The timeline in this document may change, depending on Cabinet s directive. Overview In its aim to strengthen protection of consumers who purchase a new home, the New Home Buyer Protection Amendment Act, if passed, will create a Builder Licensing Program. The Bill is anticipated to come into force December 2017. The Program will require potential builders to first obtain a license in order to build as a requirement for obtaining warranty coverage and building permits in Alberta. To ensure construction activities are not disrupted, the program will be phased in at the enforcement date with full implementation planned for May 1, 2018. The Amending Act requires all new homes to be built by someone with either a valid builder s license or an owner builder authorization. This means that going forward, all owner builders must apply for an authorization regardless of whether they are choosing to build with or without warranty. AMA website: http://municipalaffairs.alberta.ca/builder-licencing-faqs

AMA Updates Joint Session Permit Regulation Review Permit Regulation is under review but not for broad amendment this term. The current Permit Regulation expires on January 31, 2019. There is likely to be solicitation for stakeholder input on potential changes but no changes to the permit regulation until after 2019, unless the changes are needed to accommodate other legislation.

What is a Kitchen? Kitchen counter and fridge receptacles are exempt from CAFCI protection. Yet where a wet bar is installed with the same design, because not considered a kitchen, both CAFCI and TR requirements are enforced. What defines a kitchen? After some discussion it appears that a range is still a key factor in defining a space as a kitchen. Rooms not defined as kitchens are not AFCI protection exempt under CEC 26-724 (f). If a room has a sink, dedicated counter receptacles, a microwave, and fridge circuits in place, should meet the intent of a kitchen as laid out by the CEC. A wet bar counter with a shared circuit receptacle for a blender and bar fridge may not be considered a kitchen. In summary, wet bar receptacles require AFCI protection regardless of intended use such as counter receptacle or fridge. As currently written, only fridges in kitchens are AFCI exempt. There is no dedicated circuits required by code on wet bar counters. GFCI protection for receptacles near sinks is still required, as per CEC 26-700 (11).

Air Admittance Valves There has been considerable discussion regarding Article 2.5.9.2.1 (d) of the National Plumbing Code of Canada which allows for the installation of an Air Admittance Valve where connection to a vent may not be practical. What are your thoughts? Air Admittance Valves 1) Air admittance valves shall only be used to vent a) fixtures located in island counters, b) fixtures that may be affected by frost closure of the vent due to local climatic conditions, c) fixtures in one- and two-family dwellings undergoing renovation, or d) installations where connection to a vent may not be practical.

Construction Heat using a Residential Furnace What are the requirements surrounding the use of the installed residential furnace as the appliance providing temporary heat during construction? What is everyone accepting? A STANDATA is being drafted which will be taken to the Gas Sub Council, to provide parameters around the use of furnaces installed during the construction of a home, as the means of providing heat during construction. A change in manufacturers certified installation instructions for residential style furnaces was made on May 1, 2017. This change restricts these furnaces from being used to heat buildings which are under construction or being renovated. Buildings would be considered under construction or renovation where dusty conditions may be created from installing drywall or textured finishes are present.

Definition of Private vs Public When is a washroom considered private rather than public? The National Plumbing Code requires each lavatory in a public washroom to be equipped with a device capable of automatically shutting off the flow of water when the lavatory is not in use. Examples of these types of water shut-off devices include occupant sensors and self-closing valves. Private use (as applying to the classification of plumbing fixtures) means fixtures in residences and apartments, in private bathrooms of hotels, and in similar installation in other building for one family or an individual. Public use (as applying to the classification of plumbing fixtures) means fixtures in general washrooms of schools, gymnasiums, hotels, bars, public comfort stations and other installation where fixtures are installed so that their use is unrestricted.

Non-Metallic Electrical Boxes When a non-metallic rated box is installed within the same stud space in a rated wall assembly, is firestopping required? Non-metallic electrical boxes are used in construction quite frequently. When these boxes are used in fire separations, a non-metallic box is permitted as long as it does not exceed 160 cm² in size. Where these boxes are within the same stud space in a fire separation, the boxes must be protected by means such as drywall boxes or putty packs OR the boxes must be rated to a Canadian standard for the FRR required for the wall assembly. 9.10.9.6. Penetration of Fire Separations 8) Combustible outlet boxes are permitted in an assembly required to have a fire-resistance rating without being incorporated in the assembly at the time of testing as required in Sentence (3), provided the opening through the membrane into the box does not exceed 160 cm².

Upcoming STANDATAS Wireless Interconnection of Smoke Alarms (14- BCI-XXX) To provide clarification on what is meant in the Alberta Building Code 2014 (ABC 2014) by interconnected smoke alarms, and to recognize the appropriate application of listed devices that perform this function using wireless technology. APPLICATION This STANDATA applies where smoke alarms are required to be interconnected under the ABC 2014, so that the actuation of one smoke alarm will cause all interconnected smoke alarms within the dwelling unit or house with a secondary suite to sound. INTERPRETATION A smoke alarm that is certified in conformance with CAN/ULC-S531, Smoke-Alarms and uses wireless interconnection technology is an acceptable means of meeting the interconnection requirements of Sentence 3.2.4.21.(9) and Sentences 9.10.19.5.(1) and (2).

Breakout Session Locations Electrical Meeting Fairview Room Plumbing, Gas & PSDS Meeting Rotary Room Fire / Building Meeting Kentwood Room

Joint Fire / Building Meeting

AMA Updates Joint Session Harmonization of the Alberta Codes This is a priority ongoing process between Code update and Harmonization using the NBC 2015 as a Base document. The comparison review and analysis between the NBC 2010 NBC 2015, as well as comparing to the ABC 2014 for Alberta specifics and where we can update and Harmonize towards the National Codes. At this time, we have a goal of automatic code adoption of the NBC 2020 with a supplement to address the retained Alberta Specific requirements. The NBC 2020 expected publication date may be around December 2020 or January 2021. Automatic code adoption in Alberta would come into effect one year after publication. Section 3.8 and Part 7 has a number of Alberta Specifics and at this time is being retained, such differences would go into the supplement. Administrative requirements have Alberta Specifics which will be retained. There is a ULC standards committee currently drafting up a National Standard for Relocatable Structures, using ABC Part 10 as the seed document. This should address ABC specific Part 10. Only the Edmonton Airport Vicinity is currently affected by ABC Part 11 and there is currently a review in process for the AVPA, this may address the retention of Part 11 in the ABC. This is a brief overview of the extensive review process and all items may not have been captured, but to give you an idea of our direction towards updating and Harmonization.

AMA Updates Joint Session Next Code Cycle The Government of Alberta is currently reviewing the possibility of skipping the next Code cycle which was to be based on the NBC 2015. The proposal has gone forward to the Minister, and is waiting final response. This was a proposal which was originally brought forward by the Building Sub-Council, and which seems to be the same viewpoint from most SCO s when asked for comment.

NFPA 96 Annunciation for Commercial Kitchens NFPA 96-11 is the standard for hood fans over commercial cooking appliances. In that standard, section 10.6 discusses system annunciation. If the building has a fire alarm system and the hood fan fire suppression system goes off, 10.6.2 requires the suppression system to activate the fire alarm (and annunciate as a separate zone). This seems to be consistently applied. What is not consistently applied is 10.6.1 for annunciation if the building DOES NOT have a building-wide fire alarm system. What are SCO s accepting? NFPA 96

Breweries vs Distilleries What is the difference between a Brewery and a Distillery? Distilleries are referenced within the Alberta Fire Code. Distilleries are occupancies where the distilled beverage alcohol content is more than 20% by volume of alcohol. Distilleries should only be classified as F1 Occupancies. Micro-breweries where the alcohol content by volume is less than 20%, can be reviewed as other occupancy classifications. Section 4.10. Distilleries 4.10.2.1. Building Classification 1) Except as provided in Sentence (2), buildings or parts of buildings in which distilled beverage alcohol is distilled, processed or stored in bulk shall be classified as high-hazard industrial occupancies. Distillery means a process plant where distilled beverage alcohols are produced, concentrated or otherwise processed, and includes facilities on the same site where the concentrated products may be blended, mixed, stored or packaged. Distilled beverage alcohol means a beverage that is produced by fermentation and contains more than 20% by volume of water-miscible alcohol.

Alternative Solution Proposals and Acceptance When should an alternative solution proposal be accepted by the local AHJ? Alternative solution proposals are required by both the ABC and the AFC to achieve at least the minimum level of performance required by Division B in the areas defined by the objectives and functional statement attributes. All proposals must be made to demonstrate that an alternative solution will perform as well as a design that would satisfy the applicable acceptable solutions in Division B not well enough, but as well as. 1.2.1.1. Compliance with this Code 1) Compliance with this Code shall be achieved by a) complying with the applicable acceptable solutions in Division B (see Appendix A), or b) using alternative solutions that will achieve at least the minimum level of performance required by Division B in the areas defined by the objectives and functional statements attributed to the applicable acceptable solutions (see Appendix A).

Upcoming STANDATAS Door Release Hardware for Exit Doors (14-BCV-000) To provide a compliant means to reduce the probability of wandering occupants unknowingly exiting a building or supervised area and exposing themselves or others to undue risks, while still maintaining an acceptable level of safety for the occupants of the building. APPLICATION This Variance applies to doors in Group B, Division 2 and Division 3 occupancies. VARIANCE This variance, which can be applied to new and existing buildings, provides approximately equivalent or greater safety performance with respect to persons and property as that provided for by the Safety Codes Act, the ABC 2014 and the AFC 2014.

Upcoming STANDATAS Buildings Used for Parking, Repairing and/or Servicing Tank Vehicles (14-BCB-XXX) Tank vehicles containing flammable liquids or vapours or combustible liquids or vapours present a unique hazard when they are brought into a building. In addition to the hazard inherent in the product itself, there is a potential for the release of flammable or combustible vapours in significant quantities that can overwhelm a standard ventilation system for a building and become a fire or explosion risk. 1. Buildings to be used for parking tank vehicles which contain flammable or combustible gases or vapours (classified as Group F, Division 1, high hazard industrial occupancies), 2. Buildings to be used for parking, repairing and/or servicing tank vehicles (classified as Group F, Division 2, medium hazard industrial occupancies), 3. Buildings containing both uses, parking tank vehicles that contain flammable or combustible gases or vapours classified as Group F, Division 1 (F-1) according to Sentence 1, and parking, repairing and/or servicing tank vehicles classified as Group F, Division 2 (F-2) according to Sentence 2 provided:

Existing Non-Permitted Secondary Suites The existing Fire STANDATA FCI-08-07 speaks to secondary suite construction exiting prior to December 31, 2008. What should a Building SCO do to ensure conformance of a secondary suite developed after 2008? What are you doing? The previous Standata provided an option for a Safety Codes Officer, when reviewing existing secondary suites constructed prior to December 31, 2008, to use their discretionary powers to alleviate any safety concerns they may have with the suite. FCI-08-07 Secondary Suites STANDATA This Interpretation Bulletin supports the intent to give owners of existing secondary suites time to bring their properties into compliance with the AFC requirements; Requirements in the Alberta Building Code for secondary suites have been adopted and came into force on December 31, 2006, and apply to all new construction.

Bedroom egress Windows Under Decks When a bedroom egress window exits under a deck, what clearances should the deck have to ensure proper evacuation? Where a bedroom egress window is situated below a exterior deck, a concern of whether or not safe evacuation has been provided comes into question. There are some municipalities who have mandated that a minimum headroom clearance be maintained under the deck, for an egress window to open into that area. The ABC is silent on this piece, and only requires a minimum egress dimension of 380mm and a minimum opening size of 0.35m² to be provided. Additionally, the ABC requires that where a window well is installed, that the clearance between the window sash and grade maintain a minimum clearance of 760mm.

Afternoon Break Out Session Locations Fire Meeting Northland Meeting Room Building Meeting Kentwood Room