Environmental Impact Assessment Screening Report for proposed Environmental Improvement Works to the Front of Emily Square, Athy

Similar documents
Parks & Landscape Services Section, Municipal Services Department

Ref: A073350/SM/sm Date: 13 September 2013

Environmental Impact Assessment Report (EIAR) Screening Report

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Habitat Regulations Assessment (HRA) Screening Determination. May 2017

Definition of Cumulative Landscape and Visual Effects

Report To An Bord Pleanála. Potential Significant Effects on the Environment /European Sites

3. Neighbourhood Plans and Strategic Environmental Assessment

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development

What now for home building?

HRA PLANNING Chartered Town Planning and Environmental Consultants

Figure 1- Site Plan Concept

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Rooley Moor Neighbourhood Development Plan

Proposed Variation to the Midleton Town Development Plan 2013

COMMISSION DELEGATED REGULATION (EU) /... of

Assessment of plans. DI Thomas Knoll Knoll Planung & Beratung Vienna, Austria

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

COMMISSION DELEGATED REGULATION (EU) /... of XXX. on the classification of the frost resistance performance for clay tiles under EN 1304

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

THE ENVIRONMENTAL PROTECTION IN THE URBANISTICPLANNING AND LAND DEVELOPMENT IN EUROPEAN UNION LAW

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

JBCE input for the RoHS FAQ document

Derry City and Strabane District Council Planning Committee Report

TABLE OF CONTENTS 1.0 INTRODUCTION... 3

Mayfield West Phase 2 Secondary Plan Transportation Master Plan Second Addendum. Paradigm Transportation Solutions Limited

Proposed Amendment to the

Longbridge Town Centre Phase 2 Planning Application

I615. Westgate Precinct

Circular L8/08 2 September Water Services Investment and Rural Water Programmes Protection of Natural Heritage and National Monuments

BLEWBURY NEIGHBOURHOOD DEVELOPMENT PLAN STATEMENT OF BASIC CONDITIONS

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015

M7 Naas to Newbridge Bypass Upgrade Scheme. Landscape and Visual Impact Assessment Brief of Evidence

Screening neighbourhood plans for strategic environmental assessment. A toolkit for neighbourhood planners

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX. on the European Rail Traffic Management System European deployment plan

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

17A. Wind Microclimate

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Variation (No.16) of the. Dublin City Development Plan

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

ENVIRONMENTAL IMPACT ASSESSMENT

Aebhin Cawley (Scott Cawley Ltd.) Appropriate Assessment in Practice A Consultant s Perspective

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

Presented by: Remy Norbert DUHUZE Director/ER&PC REMA

Strategic Environmental Assessment of the Brailes & Winderton Neighbourhood Plan. SEA Screening Document April 2017

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

Variation No. 2 Introduction & Explanatory Document Variation made on 19th May 2014

APPROPRIATE ASSESSMENT SCREENING IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 6(3) OF THE EU HABITATS DIRECTIVE FOR THE PROPOSED VARIATION OF THE

PLANNING DECISION NOTICE

Sustainability Statement. Whitby Business Park Area Action Plan

COMMISSION DELEGATED REGULATION (EU) /... of

Environmental Impact Assessment (EIA) Training Session

Great Easton Neighbourhood Plan Statement of Basic Conditions

LONGDEN VILLAGE DEVELOPMENT STATEMENT

Proposed Draft Variation (No. 6) of the. Dublin City Development Plan

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

Evaluation of Plan Provisions

Contents of Part 6. Part 6 Zones

Stock-Taking on Integrated Coastal Zone Management (ICZM) in the Black Sea IMPLEMENTATION AUDIT QUESTIONNAIRE 2010

Final Master Plan and Development Control Regulations

COMMISSION DELEGATED REGULATION (EU) No /.. of

7. DOES THE PLAN OR PROJECT NEED AN APPROPRIATE ASSESSMENT?

4 Residential and Urban Living Zones

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

WETHERBY TOWN COUNCIL. Neighbourhood Development Plan Basic Conditions Statement

Envision Sustainable Infrastructure

Assessing the impact of smallscale wind energy proposals on the natural heritage

MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013

Appropriate Assessment in relation to County Donegal Draft Heritage Plan

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

PLANNING POLICY GUIDANCE 5

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Former RAF Sealand Site EIA

46 Burley Street, Leeds, LS3 1LB Retail Statement

(1135/2016) Translation from Finnish Legally binding only in Finnish and Swedish Ministry of Economic Affairs and Employment, Finland

Waterford to New Ross Greenway. Environmental Impact Assessment (EIA) Screening Report

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director. Linton. Yes

My role and specialisms. Worked at spawforths for nearly 13 years. Worked on EIA projects for approx. 10 years and had co-ordinator role for approx.

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Road transport activities and infrastructure can have adverse effects on the environment and community.

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

Firetect C. Fire protective products: Fire protective board

GENERAL PLAN UPDATE ISSUES MEETING. January 21, 2010 City Hall Mitchell Room 6:00 pm 9:00 pm

MEETING OF DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL 7 TH JULY 2014 PROPOSED HOUSING DEVELOPMENT, CLONTIBRET HOUSE, FRASCATI ROAD, BLACKROCK, CO.

Application for Planning Permission. Town and Country Planning Act 1990

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Screening for Appropriate Assessment Ballyroan and Old Orchard Walking and Cycling Scheme

Longmore House Salisbury Place Edinburgh EH9 1SH. 18 January 2008

Review of the Environmental Statement for Brook Green, Braintree, Essex

Stantonbury Neighbourhood Plan

EVALUATION OF MASTER PLAN ALTERNATIVES

Transcription:

Environmental Impact Assessment Screening Report for proposed Environmental Improvement Works to the Front of Emily Square, Athy by CAAS Ltd for Kildare County Council July 2018 CAAS Ltd, 1 st Floor, 24-26 Ormond Quay Upper, Dublin 7 +353 1 8721530

Document Control Author/Reviewer Date Prepared by Paul Fingleton & Andrew Reynolds various dates to 11/07/18 Checked by Paul Fingleton 11/07/18 Status of Draft Final draft for issue by CAAS for Kildare County Council

Table of Contents 1. Introduction... 1 2. The Proposed Development... 1 3. Legislative Basis for EIA... 3 4. Screening Considerations... 4 Class of Development... 4 Infrastructure Projects... 4 Sub-threshold Development... 5 5. Conclusion... 8 List of Figures Figure 1 Site Location... 2 Tables Table 1 Screening Criteria for Sub-threshold EIA... 6 by CAAS for Kildare County Council i

1. Introduction This is an EIA screening report for the proposed Emily Square, Athy, County Kildare. CAAS Ltd has been engaged by Kildare County Council to screen the proposed development to establish whether it requires Environmental Impact Assessment (EIA) and as a result if an Environmental Impact Assessment Report (EIAR) should be prepared in respect of it. CAAS has also prepared an Appropriate Assessment (AA) Screening Report and this is presented as a separate document. The screening process includes an assessment of the details of the proposal with reference to the relevant EIA legislation including the Planning & Development Regulations 2001 (as amended by Planning and Development Regulations 2015), the EIA Directive 2011/92/EU (as amended by Directive 2014/52/EU) and relevant EU Guidance including Interpretation of definitions of project categories of annex I and II of the EIA Directive, EU, 2015 and Environmental Impact Assessment of Projects Guidance on Screening, EU, 2017. The EIA screening covers: (i) Description of the proposed development (ii) The legislative basis for EIA (iii) Screening considerations (iv) Conclusions 2. The Proposed Development The site is located in the centre of the market town of Athy in the south of County Kildare. The site boundary is shown in Figure 1 below and comprises land to the north west of Emily Square, known locally as the Front Square and extends southwards from Leinster Street (N78) to the junction of Emily Row and Meeting Lane. Proposed environmental improvement works to the front (c.0.22 Ha) of Emily Square, Athy, comprising: Footpath widening and resurfacing, Upgrade of street furniture and street lighting, Replacement of existing trees with a single specimen tree, and The removal of 28no. car parking spaces and resurfacing, Reconfigured traffic circulation along the R417 comprising the establishment of a one-way system between Leinster Street and Meeting Lane, running in a north to south direction. Managed access for servicing and deliveries via restricted access bollards to access road on west side of Square together with establishment of a one-way system, running in a south to north direction and the closure of the local access road in front of the Old Town Hall. Sensitive restoration and repositioning of the Maurice Duke of Leinster Drinking Fountain (Protected Structure - RPS No. AY022) and the 1798 Memorial; All necessary services and utility provision and associated site works. by CAAS for Kildare County Council 1

Figure 1 Site Location by CAAS for Kildare County Council 2

3. Legislative Basis for EIA EIA requirements derive from the EIA Directive (Directive 2011/92/EU as amended by Directive 2014/52/EU). As the amended Directive came into force on 16 May 2017 but regulations transposing it into national legislation have not been yet been enacted, the legal principle of direct effect 1 applies. No changes to the prescribed project types or thresholds are required under the amended Directive so the types and thresholds set out in the 2001-2010 regulations remain in effect. EIA legislation as it relates to the planning process has been largely brought together in Part X of the Planning and Development Acts 2000-2010 and Part 10 and Schedules 5, 6 and 7 of the Planning and Development Regulations 2001-2010 (as amended). Part 1 of Schedule 5 to the Planning and Development Regulations lists project types included in Annex I of the Directive which automatically require EIA. Part 2 of the same Schedule, lists project types included in Annex II. Corresponding developments automatically require EIA if no threshold is given or if they exceed a given threshold. Developments which correspond to Part 2 project types by are below the given threshold must be screening to determine whether they require EIA or not. This is done by consideration of criteria set out in Schedule 7. 1 http://eur-lex.europa.eu/legal-content/en/txt/?uri=legissum%3al14547 by CAAS for Kildare County Council 3

4. Screening Considerations Class of Development In the first instance it is necessary to determine whether the project is of a type (or class ) that requires an EIAR. This project does not correspond to any of the prescribed types listed in annex I. However, it can be considered to correspond to the Infrastructure Projects type set out in Annex II, as discussed below. Infrastructure Projects Schedule 5, Part 2 of the Planning and Development Regulations, 2001 includes this project type: 10. Infrastructure projects (b) (iv) Urban development which would involve an area greater than 2 hectares in the case of a business district, 10 hectares in the case of other parts of a built-up area and 20 hectares elsewhere. (In this paragraph, business district means a district within a city or town in which the predominant land use is retail or commercial use.) The EU Guidance on Interpretation of definitions of project categories of annex I and II of the EIA Directive (2015) interprets urban development as taking account of, inter alia, the following: (i) Projects with similar characteristics to car parks and shopping centres could be considered to fall under Annex II (10)(b). This could be the case, for example, of bus garages or train depots, which are not explicitly mentioned in the EIA Directive, but have similar characteristics to car parks. (ii) Construction projects such as housing developments, hospitals, universities, sports stadiums, cinemas, theatres, concert halls and other cultural centres could also be assumed to fall within this category. The underlying principle is that all these project categories are of an urban nature and that they may cause similar types of environmental impact. (iii) Projects to which the terms urban and infrastructure can relate, such as the construction of sewerage and water supply networks, could also be included in this category. The proposed area of the development is 0.22 hectares, which corresponds to 11% of the 2 hectare threshold which applies in the case of a business district, and 2.2% of 10 hectares in the case of other parts of a built up area. Therefore the proposal is a prescribed project type but is well below the threshold. by CAAS for Kildare County Council 4

Sub-threshold Development As the proposed development corresponds to an Annex II project type but does not meet the prescribed thresholds above, it can be considered to be a sub-threshold development. Having regard to the wide scope and broad purpose of the Directive it is appropriate to consider if it is likely to cause significant environmental impacts by reference to the relevant criteria for determining same, as set out in Schedule 7 of the Planning and Development Regulations, 2001. Given the scale of the proposed development it is unlikely to cause sufficiently significant effects to warrant a sub-threshold EIA. However, in order to provide a comprehensive screening. This screening proceeds to consider it against the Schedule 7 criteria nonetheless.schedule 7 specifies Criteria for determining whether a development would or would not be likely to have significant effects on the environment under these three headings: 1. Characteristics of Proposed Development 2. Location of Proposed Development 3. Characteristics of Potential Impacts The table below provides sets out these considerations using both the main and sub-criteria which are specified in Schedule 7. by CAAS for Kildare County Council 5

Table 1 Screening Criteria for Sub-threshold EIA SHEDULE 7 CRITERIA Relevance Commentary 1. Characteristics of Proposed Development The characteristics of proposed development, in particular: 2. Location of Proposed Development The environmental sensitivity of geographical areas likely to be affected by the proposed development, having regard in particular to: the size of the proposed development, the cumulation with other proposed development, the use of natural resources, the production of waste pollution and nuisances, the risk of accidents, having regard to substances or technologies used. The proposed development is an area approx. 0.22 hectares. There are no other proposed or permitted developments that in combination with this development would have significant potential to cause cumulation effects. The proposed development does not include the extensive use of natural resources. Waste produced during the construction process are anticipated to be insufficient to cause significant effects The impacts including noise and dust within acceptable standards are anticipated to be negligible. This takes account of the Traffic Impact Assessment and Construction Management Plan submitted as part of planning application. The potential impacts are anticipated to be negligible given the nature of the proposed development. the existing land use There is minimal change in existing land use associated with this proposed development. the relative abundance, quality and regenerative capacity of natural resources in the area the absorption capacity of the natural environment, paying particular attention to the following areas wetlands coastal zones mountain and forest areas - - The impacts are anticipated to be negligible given the scale of the proposed development. by CAAS for Kildare County Council 6

nature reserves and parks areas classified or protected under legislation, including special protection areas designated pursuant to Directives79/ 409/EEC and 92/43/EEC The Appropriate Assessment Screening Report submitted as part of planning application concludes that the proposed development is not foreseen to give rise to any significant adverse effects on designated European sites. areas in which the environmental quality standards laid down in legislation of the EU have already been exceeded densely populated areas landscapes of historical, cultural archaeological significance POTENTAIL The impacts particularly those of historical, cultural archaeological significance are anticipated to be negligible given the findings of the Archaeology Impact Statement submitted as part of planning application. 3. Characteristics of Potential Impacts The potential significant effects of proposed development in relation to criteria set out under paragraphs 1 and 2 above and having particular regard to: the extent of the impact (geographical area and size of the affected population), the transfrontier nature of the impact, the magnitude and complexity of the impact, The impacts are anticipated to be insufficient given the scale of the proposed development. The impacts are anticipated to be insufficient given the scale of the proposed development. The impacts are anticipated to be insufficient given the scale of the proposed development. the probability of the impact, There are no significant environmental effects anticipated. the duration, frequency and reversibility of the impact. There are no significant environmental effects anticipated. by CAAS for Kildare County Council 7

5. Conclusion The proposed development falls within the scope of the Infrastructure project type prescribed in the Directive or Regulations. However it is considered to be sub-threshold. Having considered the nature, scale and location of the proposal; having regard to the characteristics and location of the proposed development, and having regard to the characteristics of potential impacts it is considered that the project is unlikely to give rise to significant environmental impacts. It is also noted that a separate Appropriate Assessment Screening Report has concluded that there will be no negative impacts on the qualifying interests or species of any Natura 2000 site within a 15km radius of the proposed development. It is concluded that there is no requirement for an Environmental Impact Assessment to be carried out for the proposed Emily Square redevelopment at Athy, Co. Kildare and there is no requirement for an Environmental Impact Assessment Report to be prepared. by CAAS for Kildare County Council 8