CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT PLUMBING. Test Code: 5924 Version: 01

Similar documents
Test Code: 8117 / Version 1

Plumbing Technology/Plumber CIP Task Grid

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

PLUMBING CURRICULA OUTLINE

PHCC Educational Foundation Plumbing Year 4

Level I Chapter 1 Worksheet

plumbing for greywater

CHAPTER 9 VENTS. run undiminished in size and as directly as possible from the building drain through to the open air above the roof.

STACKS AND STACK VENTS

Fixtures Installation

MATERIALS Traps TRAPS. No. IPC IRC Description

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

CHAPTER 31. VENTS Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 425R

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

PLUMBING INSTALLATIONS

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

Plumbing Fundamentals. Ron Grendzinski

CHAPTER 9 VENTS SECTION

Read Only Document Not For Distribution

Plumber A Guide to Course Content

PLUMBING REQUIREMENTS

1. You are required to use a 20 foot ladder placed up against a building that is 40 high. At what

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

Plumber Level 3 Rev. May 2011

PLUMBING DESIGN GUIDELINES SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

Building Utilities 1 Plumbing and Sanitary Systems

Mechanical Inspection Plumbing

UA STAR MASTERY EXAM Plumber Study Guide

Pipe Sizing Table. Hydraulic Load Served (fixture units)

TABLE OF CONTENTS Limitations of Authority...6 Table Swimming Pool, Spa, and Hot Tub Permit Fees...7

TABLE OF CONTENTS Limitations of Authority...6 Table Plumbing Permit Fees...7

Sanitary Drainage Systems

Matrix of changes for the National Standard Plumbing Code July 2013

1 Exam Prep Plumber s Handbook Tabs and Highlights

TABLE OF CONTENTS. CHAPTER 2 DEFINITIONS General Applicability Definition of Terms General...

SUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)

ASME STANDARDS IN MODEL CODES

Revised April High School Graduation Years 2016, 2017, and Unit/Standard Number

Plumber Practice Interprovincial Red Seal Exam

PLUMBING FIXTURES CHAPTER 27

2015 UPC Chapter 8 Indirect Wastes RV

$0.98 $ KITCHEN SINK STRAINER, 3-1/2" x BATH TUB DRAIN, 1-15/16" x 2-3/4" x $ $1.89

Heating, Air Conditioning, Ventilation and Refrigeration Maintenance Technology/Technician CIP Task Grid

CHAPTER 10 TRAPS AND INTERCEPTORS TABLE 10-1 HORIZONTAL LENGTHS OF TRAP ARMS (EXCEPT FOR WATER CLOSETS AND SIMILAR FIXTURES) 1, 2

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

1 Exam Prep Plumbing State Contractors Practice Exam 2

CHAPTER VI BUILDING PLUMBING

CHAPTER 10 TRAPS AND INTERCEPTORS

Bill de Blasio, MAYOR. build safe live safe. Rick D. Chandler P.E., COMMISSIONER

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT HVAC MAINTENANCE TECHNOLOGY. Test Code: 5937 Version: 01

Read Only Document Not For Distribution

TABLE OF CONTENTS. CHAPTER 2 DEFINITIONS General Applicability Definition of Terms General...

TUBS & SURROUNDS FIBERGLASS TUB STANDARD FIBERGLASS GARDEN TUB

Read Only Copy Not For Distribution. Chapter 19. Referenced Standards 19.1 REFERENCED STANDARDS 19.2 STANDARDS ORGANIZATIONS

Making Crimp Connections

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT ELECTRICAL POWER AND TRANSMISSION INSTALLERS. Test Code: 5922 Version: 01

APPENDIX J ILLUSTRATIONS

2015 UPC CODE - CHAPTER 8 INDIRECT WASTES

DEFINITIONS CHAPTER 2

DUKE UNIVERSITY CONSTRUCTION STANDARDS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

PLAN REVIEW SUBMITTAL GUIDE

ESSAY: This will be a written paper of 6 essay questions. Candidates are to answer 5 questions in 2 hours for 60 marks.

2009 IPC ,IMC Q &A ANDIFGC

TABLE OF CONTENTS. Part I Administrative... 1

2009 IRC. and Fuel gas Provisions

WARRANTY POLICY & RECOMMENDED MAINTENANCE

2016 Plumbing Supplemental Plan Review List

GARCIA GALUSKA DESOUSA Consulting Engineers

WATER HAMMER ARRESTORS & MISC. SPECIALTIES

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

1 What is the name of the tool shown in the diagram? Basin wrench Footprint wrench Stilson wrench Torque wrench.

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

Plumbing. Definitions. Background Factors. Air Chambers. Air Gap (Drainage System) Air Gap (Water Distribution System) Air Lock.

Pro Vent TM. Provent Systems Inc Capital Circle Lawrenceville Georgia

PLUMBING FIXTURES Reserved

Plumbing Lesson Four: Plumbing System Plan. Student Handouts

Land Use and Environmental Service Agency (Code Enforcement) Plumbing 2010

DEFINITIONS CHAPTER 2

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

ProVent Systems Plumbing Fundamentals. Educational Literature. Comparison of ProVent Design Rules and The International Plumbing Code

Tools of the Trade. Inside the Plumber s Toolbox. I n s t r u c t o r s Guide

STANDARDS TASK GROUP REPORT

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

PRICE BOOK CONTENTS 010 PIPE

Gulfport, Mississippi 21 May 2007

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties:

Acrylic Claw Foot Tub

Experienced Worker Assessment Blueprint HVAC - Heating, Ventilation and Air Conditioning

DOMESTIC WATER PACKAGED BOOSTER PUMPS

CHAPTER 14 REFERENCED STANDARDS TABLE REFERENCED STANDARDS PRE-PRINT. STANDARD NumBER STANDARD TiTLE APPLiCATioN

Steamfitter-Pipefitter A Guide to Course Content

Trade of Plumbing. Module 2: Domestic Hot and Cold Water Service Unit 11: Sanitary Appliances Phase 2

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER ANSWER SCHEDULE

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

CHAPTER 2 DEFINITIONS. Back-Siphonage The flowing back of used, Backwater Valve A device installed in a drainage. bathtub.

AIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015

CHAPTER 10 TRAPS AND INTERCEPTORS The vent pipe opening from a soil or waste No more than one (1) approved slip joint

Transcription:

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT PLUMBING Test Code: 5924 Version: 01 Specific competencies and skills tested in this assessment: Safety Follow rules for fire safety Follow rules for housekeeping safety Follow shop rules Follow rules for material handling safety Follow rules for eye protection Follow rules for hearing protection Follow rules for respiratory protection Follow rules for hand tool safety Follow rules for power equipment safety Follow rules for portable electric hand tool safety Follow rules for MSDS safety Follow safety rules as they relate to ECP (Exposure to Control Procedures: bloodborne pathogens, etc.) Follow OSHA (Occupational Safety and Health Act) regulations Discuss provisions, inspections, and citations of OSHA Identify the different types of ladders and scaffolds used on a worksite Describe how to use ladders and scaffolding safely Properly set up, inspect, and use stepladders, extension ladders, and scaffolding Identify basic hand tools, state their uses, and use them in the trade Identify power tools, safety, and use and maintenance Valves and Devices Identify usage and installation of backflow prevention devices Identify types of valves that start and stop flow Identify types of valves that regulate flow Identify valves that relieve pressure Identify valves that regulate the direction of flow Explain the factors that influence valve selection Disassemble and assemble various types of valves (such as grade valve, glove valve, and flush valve)

Identifying and Joining Non-Ferrous Piping and Tubing Demonstrate skills in joining, cutting, and bending various types of copper tubing: solder, compression, flare, swage, and press fit Prepare and braze a joint Perform tests on all soldered and brazed joints Measure, cut, and assemble PVC, CPVC, and ABS Measure, cut, and assemble PEX and PE Measure, cut, and assemble HDPE Fabricate a crimp joint connection Fabricate a tubing type joint Identifying and Joining Ferrous Piping Thread steel pipe with an adjustable die, power threading machine, non-adjustable die Measure, cut, ream, thread, assemble, and test various types of steel piping Identify and use cast iron tools Measure and cut cast iron soil pipe with a chain cutter Assemble cast iron to various pipe types with no hub, Fernco, rubber gasket joints Construct various types and sizes of steel pipe projects using end to end, end to center, center to throat, and overall improvements Advanced Off-Set Piping Fabrication Calculate simple pipe offsets Blueprint Reading and Transit Operations Identify types of drawings Identify the various lines used on drawings Interpret specifications and dimensions Identify the three basic views of a drawing Create isometric drawings Identify piping systems according to color-coding Identify and set up a level and/or transit Set up the level and/or transit; shoot elevations and grade pipe Pipe Specifications and Supporting Systems Identify pipe and components according to specifications Demonstrate knowledge of pipefitting standards, codes, and specifications Read and interpret pipefitting specifications Identify and explain the types of piping systems Identify piping systems according to color-coding Explain the effects and corrective measures for thermal expansion in piping systems Explain types and applications of pipe insulation Identify various metals and specification process used in the plumbing and heating industry Use hangers to secure horizontal and vertical pipe lines to masonry, metal, and wood

Water Distribution Lines Perform water pressure tests on water supply systems Rough-in water supply lines for bathtubs, wall mounted urinals, water closets, clothes washer, kitchen sink, lavatories Demonstrate knowledge of whirlpool tub installation Demonstrate knowledge of bidet installation Sanitary and Storm Drainage Systems Layout and establish grade/slope for drain lines Install backflow prevention valves Water or air test a drain Install air admittance valves Rough-in water lines and vents for bathtubs, lavatories, dishwashers, water closets, showers, bidets and urinals Install a grease interception trap in waste lines Install garbage disposal units Install sump pumps Install a sewage pump Venting Systems Install soil or waste back vents Install soil or waste loop vents Install vent terminals (roof-flashing) Testing Piping Systems Perform head pressure tests Perform hydrostatic tests Perform leak tests on gas supply lines Plumbing Fixtures Install tank-type water closets Install bathtubs Install wall mounted lavatories Install wall mounted urinals Install kitchen sink Install prefabricated shower base drains Install built-in lavatories Install flush valve-type water closets Install traps and cleanouts

Plumbing Appliances Install dishwashers Install electric water heaters Install gas water heaters Install clothes washing machines Install oil-fired water heater Install water re-circulating pumps Install garbage disposal units Install sump pumps Install a sewage pump Maintain Plumbing Systems Clear obstructions from lavatory drains Remove obstructions from main drain lines Remove obstructions from water closets Repair/replace lavatory trap drains and leaking water faucets or valves Repair leaking shower valves Repair water flush valves on water closets Replace a section of galvanized water supply line Explain how to thaw frozen pipes Disassemble P traps to clear lavatory drains Repair/replace any type of water closets Hydronic Heating Systems and Boilers Identify and explain various boiler fittings and accessories, including thermo expansion devices Discuss the various types of boilers Identify and explain various boiler, steam, and hot water fittings, and piping Identify and explain feed water accessories Identify and explain steam and hot water accessories Explain the operation of a boiler and its various controls Explain the operation of the draft controls Identify and explain boiler safety Describe and design a hydronic heating system Describe and design a primary and secondary loop Explain operation of 3-way or 4-way mixing valve, injection pump, tempering valve accessories/controls of system

Written Assessment: Administration Time: 3 hours Number of Questions: 196 Areas covered: 16% Safety 6% Valves and Devices 8% Identifying and Joining Non-Ferrous Piping and Tubing 6% Identifying and Joining Ferrous Piping 2% Advanced Off-Set Piping Fabrication 6% Blueprint Reading and Transit Operations 7% Pipe Specifications and Supporting Systems 3% Water Distribution Lines 7% Sanitary and Storm Drainage Systems 5% Venting Systems 3% Testing Piping Systems 10% Plumbing Fixtures 7% Plumbing Appliances 8% Maintain Plumbing Systems 6% Hydronic Heating Systems and Boilers Sample Questions: What is the correct practice before using a chisel with a mushroom head? A. peen with a hammer B. grind off and trim C. use as is D. pry off with a wrench When joining CPVC tubing, the plumber should use A. both primer and cement B. Teflon and pipe dope C. CPVC adaptor D. CPVC cement When setting up to survey using a tripod and builder s level, the plumber should first A. take a reading on the rod B. establish a benchmark by using the transit C. select the right target D. level the instrument

The plumber should place the branch vent A. at an equal height as the trap B. 2 inches below the flood level rim C. 6 inches above the flood rim level D. at the same height as the crown weir The minimum size trap for an automatic washing machine box is A. 1-1/2 inches B. 2 inches C. 2-1/2 inches D. 3 inches Performance Assessment: Administration Time: 3 hours Number of Jobs: 2 Areas Covered: 50% Install and Prepare to Leak Test a DWV System Selection of tools/materials, safe handling of tools and equipment, rough-in Lavatory #1, rough-in Lavatory #2, techniques for joining pipe and fittings, installation techniques, accuracy of fittings chosen, workstation left in good condition, adhere to local plumbing code, and leak test. 50% Install and Prepare to Leak Test a Water Supply System Selection of tools/materials, safe handling of tools and equipment, rough-in Lavatory #1, rough-in Lavatory #2, techniques for joining pipe and fittings, installation techniques, accuracy of fittings chosen, workstation left in good condition, adhere to local plumbing code, and leak test. Sample Job: Install and Pressure Test a DWV System Maximum Job Time: 1 hour and 30 minutes Participant Activity: Study the rough-in sketch and drawings provided for two lavatories; measure and cut the pipe to the correct size, selecting appropriate tools; assembly all connections per rough-in dimensions, install appropriate nail plates, and prepare DWV system for leak testing.