Drainage. Alignment K:\D (D102241) SHERFORD\CONSOLIDATED PLANNING DOCUMENTS\MAIN STREET\SHERFORD MAIN STREET NARRATIVE REVISION

Similar documents
Secondary School to Haye Road

Main Street: Deep Lane Junction to Stanborough Cross. Sherford. main street. November 2006

Key Principles. 290 Phasing Principles and Programme

GREATER CAMBRIDGE CITY DEAL. Urban Design Guidance for Transport Infrastructure Projects

Alma Road Rain Gardens, London

Streets for All East of England

Public Consultation. Land at Monks Farm, North Grove. Welcome

GREENVALE CENTRAL PRECINCT STRUCTURE PLAN

BROWNFIELD REGENERATION LONDON

97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015

East Grove Public Realm

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

Proposed Amendment to the

Sherford. Town Code. town code. Sherford

Welcome - Halse Yard, Honiton

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Welcome to our exhibition

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK

Phase 1C. Phase 2B. Phase 1A. Phase 1B. Phasing. Lighting. Phase 2A. Staff House Project. Library Project. p p

RESIDENTIAL ROAD DESIGN GUIDE Rev 0 06/85. Residential Road. Design Guide

To the Lord Mayor and Report No. 312/

4 RESIDENTIAL ZONE. 4.1 Background

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Traffic management in historic areas

Boundaries and Fencing

Town Center (part of the Comprehensive Plan)

Warren Farm, Ampthill

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

8.0 Design and Form of Development 43/

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

paving case study GREAT WESTERN PARK DIDCOT OXFORDSHIRE

3.1 The hybrid planning application proposes the following description of development:

Wolverton Public Realm Design Manual DRAFT

UTT/16/1466/DFO GREAT DUNMOW MAJOR

Welcome to our public exhibition

4. MASTERPLAN FRAMEWORK

The Site. Welcome to the public exhibition for Boothferry Road, Hessle.

Appendix H: Easement cross sections

Welcome to our Public Consultation

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Construction of the A30 Bodmin India Queens Improvement

medium desnity housing

Former North Works, Lickey Road, Longbridge, Birmingham

Making the case for Sustainable Transport Project Potential

West Blackhall Street Public Realm Public Exhibition

GUIDELINES BAYVIEW INSTITUTIONS CONTEXT PLAN LOCATION PLAN COMPONENTS URBAN DESIGN GUIDELINES

6.0 Access & Maintenance

Figure 12: St Andrews, Bow 14 TOWNSHEND LANDSCAPE ARCHITECTS

North Somerset Council Local Development Framework

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

The journey so far. The new masterplan for Dargavel Village

Section 4 - Public Realm & Landscape proposals Landscape Masterplan. Section 4 52

Newcourt Masterplan. November Exeter Local Development Framework

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS

Welcome to our public exhibition

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

I539. Smales 2 Precinct

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

Urban Design Guidelines

1. Local Plan Context

WELCOME. Welcome and thank you for visiting today.

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Planning Application S.08/0408/FUL Proposed Development at Bath Road, Leonard Stanley. Response from Leonard Stanley Parish Council.

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting.

Clairtrell Area Context Plan

It is recommended that the Committee resolve to APPROVE the application and grant planning permission subject to the following conditions:

appendix and street interface guidelines

Chapter 24 Route Window SE5 Arsenal Way shaft. Transport for London

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

1. Creating a liveable, vibrant, safe and inclusive city centre for the benefit of people of all ages to live, work, learn and enjoy.

Site 5 Development Brief

Draft Ada Street Cardiff Area Plan

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

Ward: West Wittering. Proposal Change of use from public highway pavement to residential garden use.

Asbury Chapel Subdivision Sketch Plan

Special Landscape Area (Great Orme and Creuddyn Peninsular). Agricultural land (grade 3a). TPO A14 (1982) - group of trees (G4) on east boundary.

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling

I615. Westgate Precinct

Thank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today.

St. Clair Avenue West Area Transportation Master Plan

University Park, Worcester Non Technical Summary December 2011

Housing development on the edge of Forres

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Derry City and Strabane District Council Planning Committee Report

MATURE SUBURBS RESIDENTIAL DEVELOPMENT GUIDELINES

Proposed Stage One Proposed Stage (Pending) Staging. Blenheim CBD Streetscape Final Report 50

AOTEA SUPERMARKET ZONE. Zone Introduction

EHTF & Streetscape. Context. Streetscape: a definition. What function? More context. Ian Poole

PDP DESIGN & ACCESS STATEMENT

Stratford Neighbourhood Plan Questionnaire

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Calderdale the Next Chapter

PUTTING THE HEART INTO BATTERSEA. A vision

edge of gas line corridor setback edge of gas line corridor aligned with Schlumberger building 37.0 m AOD 33.0 m AOD max

Transcription:

The Main Street therefore provides a key link for a HQPT bus system between the Park and Ride, through Sherford onto the A379 and Plymouth City Centre. There is no definitive description of an HQPT system, however in this instance it is generally taken to mean a reliable high frequency public transport service that provides a cost effective and quicker alternative to cars with modern clean buses. Furthermore, it is a service that has the capacity to carry large numbers of people. The Main Street must allow the buses to perform to these criteria. No decision regarding the type of vehicle to be used for HQPT has been taken. Nevertheless it is envisaged that in order to achieve the necessary patronage levels, high capacity Bendi Buses may be used. The vertical and horizontal alignment of the Main Street has been designed to allow Bendi Buses to operate at speeds of up to 30mph, through the urban area. However it is anticipated that actual speeds will be close to those identified for each of the described Character Areas. In order to ensure that buses travel through Sherford substantially quicker than the car, priority will be given to buses approaching signalised junctions. Presently nine sets of traffic signals are proposed on the Main Street (if those situated on the existing highway at Deep Lane, Haye Road and Stanborough Cross are not included) each one provided with vehicle actuated switching to give bus priority at all of these junctions. On leaving the Park and Ride, the HQPT will be given priority onto the Main Street at the Northern Avenue junction and will run on the Main Street to the Bridge where, when necessary, it will switch onto its own running lane in the centre of the street. It will then run in the main carriageway until it reaches the Secondary School where it is allowed a straight line across the open area in front of the school entrance bypassing the signalised junction with Southern Avenue. The Haye Road Junction has been designed to provide a segregated approach for the westbound HQPT to receive priority over vehicles waiting to join Haye Road. This can be adapted to allow HQPT buses to turn right from Haye Road onto a future dedicated route through the existing Moorcroft Quarry site. In order to ensure that the interim situation of buses travelling on Haye Road and joining the A379 at Stanbourgh Cross is not compromised by other traffic, a 400m long dedicated bus lane from as far back as Vinery Lane ensures that there is a significant advantage for the bus over the car. This enables the buses to reach the stop line at Haye Road without any delay and the provision of a bus gate allows buses reaching the signalised junction at Stanborough Cross always to pass through on the first phase of the lights. This will give the bus a tremendous advantage over the car but most importantly the advantage will be very visible, and will be witnessed most by those in queuing cars watching the bus pass by. It will act therefore to advertise modal shift. The relative performance of the bus will promote patronage and the episodic congestion for other forms of motorised traffic will actively discourage the use both of the car and of this route which will in turn ensure that the current rat-running is curtailed. The manipulation of the light sequences regardless of traffic levels will be a useful tool through early phases. Three stops within Sherford, in addition to the Park and Ride, are to be provided. These are located at the eastern neighbourhood centre near the square-about junction, at the town centre junction with Brixton Road and outside the secondary school. These stops are designed for high capacity buses with low floors and double entrance doors. Drainage The surface water drainage system serving the Main Street will also drain the adjacent urban areas. Gullies located adjacent to the kerb or in channels on the edge of the carriageway will connect to a surface water sewer below the carriageway. These sewers will drain to a number of main soakaway features located below ground in green open space areas adjacent to the highway at the Bridge and at the western playing fields. These features will be sized to store run-off from the designed rainfall events, however to prevent flooding in extreme events an overflow connection to adjacent watercourses will be provided. Scott Wilson s Engineering layout drawings no s D108875 702 to 714 shows the principle route of the surface water drains/sewers and the location of the proposed attenuation/storage features. Where the surface water from the highway is mixed with substantial volume of private development runoff, the sewer will be adopted by South West Water; where the predominant flow is from the highway, the Highway Authority will adopt as a highway drain. The relevant authority will also adopt the soakaway features. Alignment The Main Street route is entirely located on Greenfield agricultural land, with few constraints to its alignment. It was the proposed urban form of Sherford and a desire to seek the less steep areas of topography, which confirmed the detailed route. The topography is generally rolling grassland, which drops 70m from the highest point at Deep Lane junction to the connection point at Haye Road, a distance of approximately 3.5km. The steeper gradients are generally at the eastern end however no gradients are greater than 5% (1 in 20). Scott Wilson Drawings D108875/717 to 722 show a long section drawn through the centreline of the Main Street and they demonstrate that the proposed finished road level generally follows the existing ground. This therefore limits the amount of earthworks involved in the construction of the street. The Cross-Section Drawings D108875/723 to 733 also demonstrate that, in general, the development on each side of the street can be constructed close to the back of footpath level, again without substantial amounts of earthworks. This design philosophy ensures that the Main Street Design will comply with the requirements of The Disability Discrimination Act 2005. Access to the existing properties and road connections on site will be incorporated into the overall Sherford road network. In the interim situation the Main Street construction will provide temporary connections to the existing local road network and make available access to the existing properties on site. K:\D108875 (D102241) SHERFORD\CONSOLIDATED PLANNING DOCUMENTS\MAIN STREET\SHERFORD MAIN STREET NARRATIVE REVISION 080115.DOC

Lighting Lighting of the Main Street will be to Devon County Council highway lighting standards with white light used throughout. Building mounted lanterns will be used wherever possible. Where lighting columns are unavoidable, primarily adjacent to open space areas or where road widths may compromise ambient lighting on the carriageway, they will be designed as a part of the overall street furniture range. Lighting levels will vary along the length of the street and will be dependent upon the volume of traffic on that length and the particular use of the area. For example, the High Street section will have higher lighting levels, taking into account greater pedestrian activity in that area. The road adjacent to the bat corridor will be treated as a special case with lower lighting levels and reduced mounting heights, minimising light spill into the surrounding area. Temporary lighting may need to be provided before adjacent buildings are constructed and this will be dependant upon a number of issues, including the levels of traffic and general activity. Charcon 'Andover' Block Paving All kerbs will be 300mm (nominal) width and have an adjacent edge channel (300mm wide stone or 3x 100x200mm setts) and be formed from reconstituted granite. Trees form a key element of the streetscape with semi mature trees forming avenues along the main corridors. Species will be chosen from varieties that are suitable for intensive urban areas. Lavigne Lonsdale Sheet No 3 shows the method of planting for various conditions within the Main Street corridor. The tree survey in Section 7 shows which trees will need to be removed to accommodate the road corridor, although the tree protection plans need to be finalised during detailed design. Urban Design and Surface Finishes The urban design of the street and the public realm has been designed by Lavigne Lonsdale, taking advice from The Streets for All (South West) Design Compendium. This document, published by the Department for Transport and English Heritage, provides guidance on street material and furniture in great detail and demonstrates local regional characteristics for the south west, including Devon. The material selection relating to buildings and streets, places particular emphasis upon the use of local materials, where historically local geology has been the important source of construction material. Despite the wide range of materials available to today s designers, Sherford and the Main Street in particular, seeks to use a simple palate of colours and materials in order to maintain a consistent character throughout. The surface finishes include the following four types of materials: Black Asphalt Macadam for the carriageway running lanes; Buff coloured spray tar and chip (rolled) for adjacent footways; Reconstituted paving in flags and blocks for footways in key character areas; Reconstituted block paviour (100 x 200-300mm) feature paving in carriageways to define pedestrian crossings, bus lanes and service streets It is also acknowledged that whilst the locations for the street furniture (bollards, seats, bins, lights etc) has been indicated on the surface finishes plans, the actual product range has yet to be finalised. The street furniture is an important element of the public realm and so further design consultation is required so that a coordinated product range for Sherford is produced. Similarly, the public art component needs careful consideration and whilst indicative locations have been identified, further liaison is required. The aim is, of course, to co-ordinate all of the component elements of engineering, architecture, landscape architecture and urban design in order to set the scene and ultimately to create a unique and inspiring piece of townscape. Charcon 'Countryside' Cobbles 100x 100mm K:\D108875 (D102241) SHERFORD\CONSOLIDATED PLANNING DOCUMENTS\MAIN STREET\SHERFORD MAIN STREET NARRATIVE REVISION 080115.DOC

current road corridor sheet 1

@ K H @ S CD B CDS@HK A K H @ CDS C K H @ S D C detailed character areas sheet 2

kennington frontages newton abbot bath see detail bath detailed area a: eastern gateway bath sheet 3

typical section A - A detailed area a: eastern gateway hennef main street sheet 4

see detail (axo) typical section B - B detailed area b: sherford bridge sheet 5

dartmouth collonade axonometric view detailed area b: sherford bridge sheet 6

see detail modbury: raised pavement totnes: high street detailed area c: the high street variation in road widths marlborough: high street kingsbridge: high street sheet 7

primary school collonade bus stop bus stop high street: view looking south town hall & market raised pavements high street: view looking east typical section C - C detailed area c: the high street marlborough: town hall sheet 8

teignmouth sherford kiln secondary school sherford quarry teignmouth youth centre detailed area d: secondary school & bat corridor newton abbot sheet 9