DESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018

Similar documents
Residential Development at Menehay Farm, Bickland Water Road, Falmouth Design and Access Statement

Hengrove Park Phase 1. BUDF Briefing. Kier Living. Stride Treglown job no Prepared by Checked by Date January 2017 Revision -

Amendments to Illustrative Masterplan. Outline Planning Application RU.14/0099. Royal Holloway University of London

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

Longbridge Town Centre Phase 2 Planning Application

Introducing Turley Scotland. Experts in hospitality and leisure

Elephant and Castle. Elephant and Castle Area Vision Map. Elephant and Castle. 216 New Southwark Plan Proposed Submission Version NSP42 NSP49 NSP44

THE RAILWAY PUB, WHEATLEY

AND STATEMENT OF EVIDENCE OF JOHN LONINK ON BEHALF OF CHRISTCHURCH CITY COUNCIL SPECIFIC PURPOSE (GOLF RESORT) ZONE

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

Hybrid Planning Application. March Design and Access Statement Appendix C Grange Road Bridge Crossing. Project 5 SHAPING OUR FUTURE

Proposed Student Accommodation Development

75-89 Wallis Road & 59 Berkshire Road, Hackney Wick, London, E9 5LN

WELCOME. ORPINGTON. Welcome to this exhibition of our proposals for the redevelopment of Bassetts Campus.

design & access statement Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping

Camberwell Camberwell Area Vision Map

URBAN DESIGN BRIEF NORTHVIEW FUNERAL HOME HIGHBURY AVE N, LONDON, ON

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

2. The application, which is a full plans application, is for a commercial development comprising B1, D1, D2 and A3 uses.

YMCA Erdington (Phase 2), 300 Reservoir Road, Erdington, Birmingham, B23 6DB

Proposed Mixed-Use Development at Barking Road, Newham, London. Design & Access Statement. March 2013

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd

3.1 The hybrid planning application proposes the following description of development:

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Director of Development Services

GREENFORD HALL & ADJOINING LAND

Land at Cardigan Street / Belmont Row / Gopsal Street, Eastside, Birmingham, B4 7RJ

COURTHOUSE CAMPUS BARNSLEY Executive Summary March 2010

Welcome to our public exhibition

HERON HILL Breinton HR4 7PP

Former Waverley School Site, Hob Moor Road, Small Heath, Birmingham, B10 9BT

intu Bromley Planning Summary Bringing more to Bromley February 2014

Birmingham University, Pritchatts Road, Adjacent to Gisbert Kapp Building, Edgbaston, Birmingham, B15

Sewanee Village + Request for Builder/Developer Proposals

Building Distinctive Safe and Pleasant. Better

Vision for East Cowes

Public Consultation. Land at Monks Farm, North Grove. Welcome

A New Aldi Foodstore Hesketh Bank Tarleton Banks A59 The proposed site A565 Croston Former Bayleaf Restaurant Holmes A59

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

Welcome to our public exhibition

17A. Wind Microclimate

DRET London Free School - Secondary Planning Application - Design & Access Statement

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

Introduction to MP3. MP3 H4 Park Central (North)

13. London Bridge London Bridge Area Vision

DEVELOPMENT MANAGEMENT REPORT

2bPlanning Scheme. Appendix. Conservation - Removal of Structures. Grangegorman

INTRODUCTION. Land south of Bishopswood Lane, Tadley


1. Local Plan Context

WELCOME TO THE NEW WILTON PARK

Welcome to our exhibition

Proctor Tweedbank Spatial & Matthews Framework Architects

Land to the North of Main Road, Wybunbury

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

WEST GRANGE, GREAT SHELFORD

Former Keighley College Buildings, North Street

A VISION FOR BLAIRGOWRIE

London Bridge London Bridge Area Vision Map

6. Bermondsey 6.1. Bermondsey Area Vision

Former North Works, Lickey Road, Longbridge, Birmingham

OLD WESTWICK. Guildford = Surrey

3.3. Urban Structure Defining a New Hierarchy of Routes and Spaces >Images

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

4 RESIDENTIAL ZONE. 4.1 Background

INTRODUCTION. Land West of Main Road, Stanton Harcourt THE SITE. Why is the Site Suitable for Development?

PROPOSED CARE HOME & ASSISTED LIVING DEVELOPMENT (C2), PYRTON LANE, WATLINGTON

Former Evans Halshaw Garage, East Bay Close, Cardiff.

Barnstaple's new riverside quarter

Application and Proposals. Part 211

WHAT IS THE GRAVESEND HERITAGE QUARTER PROJECT?

Heathfield Littleborough Lancashire

SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK

Test Valley Borough Council Southern Area Planning Committee 8 January 2019

MASTERPLANNING MILTON KEYNES WESTERN EXPANSION AREA ELLESMERE WITNEY LITTLECOMBE CRIBBS CAUSEWAY

ROYAL MINT COURT SECURES PLANNING CONSENT FOR 600,000 SQ. FT. COMMERCIAL SCHEME FOR OVER 6,000 LONDON WORKERS

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Director of Development Services

Barvills Solar Farm Environmental Statement Non-Technical Summary

Linden Homes Proposals for land at Field Road, Ramsey

Appendix B Figures L1 and L2 - Townscape Analysis

Stowford Mill, Ivybridge Introduction

LINDEN HOMES McArthur s Warehouse, Gas Ferry Road. Welcome. Feedback

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

The Grove Catbrook Road, Catbrook, Gwent, NP16 6NQ

TREMATON HALL Trematon, Near Saltash, South East Cornwall

Cycle store. 66 m². Building 4 3B4P. 82 m². Building m² Cycle workshop B3P 51 m². 55 m². Bin store / Plant room.

Site 2 Development Brief

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Land East of Cromwell Lane

Welcome to the Queen s Square, Croydon Consultation

Design and Access Statement Volume III Part 1 of 9 Plot A1. May 2018 Allies and Morrison

The Cedars Diss, Norfolk, IP22 4QQ

Design & Access Statement. West Langarth Urban Development, Truro August 2014

PHASE III: Reserved Matters Submission

HS2 Interchange Station Design

Welcome to our public exhibition

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

22 LUARD ROAD, CAMBRIDGE

Transcription:

DESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018 1

FILE NTHCU-STL-XX-XX-RP-A-9075-RP013 PROJECT New Talybont Halls, Cardiff University CLIENT Cardiff University STRIDE TREGLOWN JOB No. 150858 REVISION 1 12.06.2018 - P01 - First issue for review and comment 2 19.07.2018 - P01 - PLANNING ISSUE 3 4 PREPARED BY Amy Evered CHECKED BY Tom Reed 5 DATE REVISION No. 12.06.2018-6 PROJECT CONTACT TOM REED +44 (0)117 974 3271 tomreed@stridetreglown.com OFFICES SERVICES SECTOR EXPERTISE LONDON BIRMINGHAM MANCHESTER BRISTOL CARDIFF SOLENT BATH PLYMOUTH TRURO ARCHITECTURE INTERIOR DESIGN BIM AND DIGITAL DESIGN SUSTAINABILITY DESIGN MASTERPLANNING AND URBAN DESIGN LANDSCAPE ARCHITECTURE TOWN PLANNING BUILDING SURVEYING HISTORIC BUILDING CONSERVATION PROJECT MANAGEMENT PRINCIPAL DESIGNER GRAPHIC DESIGN OFFICE AND WORKPLACE TECHNOLOGY AND INNOVATION EDUCATION STUDENT LIVING HOTELS AND LEISURE RESIDENTIAL SENIOR LIVING DEFENCE CIVIC, COMMUNITY AND CULTURE HEALTHCARE RETAIL TRANSPORT 2

1.0 INTRODUCTION Outline Proposal Design Team & Applicant 4 2.0 THE SITE & CONTEXT Site Location Cardiff University Site Context Surrounding Buildings Application Site Constraints & Opportunities 6 3.0 DESIGN EVOLUTION Pre-Application 01 (10.11.2017) Pre-Application 02 (21.12.2017) Cardiff City Council Sketch Scheme Pre-Application 03 (09.03.2018) 14 4.0 DESIGN PROPOSALS Use & Amount Layout Scale Appearance & Materials Access 26 3

INTRODUCTION 4

Outline Proposal Proposal Summary The proposal seeks to redevelop the application site (identified adjacent) to provide new purpose built student accommodation for Cardiff University. The existing buildings on site will be demolished under a separate consent. The proposal will broadly comprise of 3 buildings (to be known as the north building, south building and east building) with a total of 18,279sq.m. The development will range in height from 4 to 7 storeys and be connected by a series of landscaped courtyards. A total of 645 study bedrooms will be provided in 6, 7, 8 and 9 bed cluster flats. Communal and ancillary facilities (including laundry, reception, cycle store, common room and plant) will be provided to the ground floor of the south building. Purpose and Scope This Design and Access Statement (DAS) has been prepared by Stride Treglown on behalf of Cardiff University to support the planning application, which seeks detailed planning permission for the proposed development described in this statement. The purpose of the DAS is to support the planning application by illustrating the process that has led to the development of the design proposal and explain the design development in a structured way. This DAS should be read in conjunction with all supporting consultants reports and planning drawings. Design Team & Applicant Client - Cardiff University Project Manager - Gleeds Architect - Stride Treglown Landscape Architect - Stride Treglown Quantity Surveyor - Turner & Townsend M&E Engineer - Amber Structural Engineer - Curtins BREEAM Consultant - MM Sustainable Design Planning Consultant - DPP Aerial view from South-East 5

THE SITE & CONTEXT 6

Site Location Application Site Address Excelsior Rd, Cardiff, CF14 3AT Project Reference New Talybont Halls Location The proposed application site is located in the Gabalfa area of Cardiff to the north of the city centre. The application site currently forms the Brickyard Business Park and a vacant depot to the north-west of the existing Talybont student accommodation development. The site is bounded to the north-east and east by existing retail units. Wider location plan (nts) 7

Cardiff University Talybont residences The development will form the northern most point of the Cardiff University Talybont residences, which currently comprises a number of individual student accommodation buildings as well as university sports, maintenance and social facilities. The development has a total of 2914 bedrooms across the following buildings identifies adjacent. 01 - Talybont Gate 179 single occupancy en-suite study bedrooms 6-10 bed cluster flats with shared kitchen / dining / lounge. Wheelchair accessible accommodation. 1.5 miles from Main Building. 1.5 miles from Heath Park campus. 03 - Talybont South 1252 single occupancy en-suite study bedrooms. 4-8 bed cluster flats with shared kitchen / dining. 0.75 miles from Main Building. 1 mile from Heath Park campus. 02 - Talybont North 972 single occupancy en-suite study bedrooms. 6 bed cluster flats with shared kitchen / dining. Wheelchair accessible accommodation. 130 parking spaces. 1.25 miles from Main Building. 1.25 miles from Heath Park campus. 04 - Talybont Court 511 single occupancy en-suite study bedrooms. 4-7 bed cluster flats with shared kitchen / dining / lounge. Wheelchair accessible accommodation. 2 houses for families. 1 mile from Main Building. 1.25 miles from Heath Park campus. Talybont residences campus plan (nts) 8

New Talybont Halls, Cardiff University / Design & Access Statement Site Context Context Access The site context is characterised by a mix or retail, light industrial / commercial, and residential buildings of varying heights and character. The site is accessed via Excelsior Rd which currently provides access to the adjacent retail park and the Talybont campus to the south-east. Access to the Talybont campus is via a secure gated entrance adjacent Talybont Gate. To the immediate east of the site is Talybont Gate student accommodation and the Cardiff University hockey pitch. Talybont Gate is 6 storeys with a setback roof plant, primarily a mix of brick and HPL cladding. The rest of the Talybont campus is located further to the west. To the north is Booker Wholesale and associated depot, which splits the application site from the Cardiff University greenhouses to the north-east. To the west of the site are a number of retail units, including a large 24hr Tesco Extra to the south-west. Excelsior Rd is accessed via the A48 (Western Ave), a key route through Cardiff. MAINDY The river Taff is located to the south of the site which lies adjacent the Taff trail, a designated cycle and walking route which provides good access links to the south-east. The railway line is to the north of the site, however there are no railway stations within the site vicinity. McDonald s and Halfords are located within an island in the centre of the application site for which existing access must be maintained. A number of mature trees are immediately south of the site, separating the site from the river Taff. Key Main roads Rail line Application site location plan (nts) River Taff Application Site 9

New Talybont Halls, Cardiff University / Design & Access Statement Surrounding Buildings 01 - Talybont Gate 04 - McDonald s West boundary of site Street level view from site entrance on Excelsior Road Retail Unit 1 Storeys (approx 4m) Brick East boundary of site. Street level view from Talybont Residences Newest Student Residence 6 Storeys (approx 20m) Brick and HLP Panels 02 - Talybont Residences 05 - KFC South-east boundary of site Street level view from site entrance on Excelsior Road Retail Unit 1 Storeys (approx 4m) Cladding East boundary of site Street level view Existing Student Residences 4 Storeys Brick 03 - Booker Wholesale 06 - Halfords North-east boundary of site Street level view from Excelsior Road Industrial Retail Unit 1 Storeys (approx 6m) Brick and metal corrugated cladding 01 - Talybont Gate 02 - Talybont residences 03 - Booker Wholesale 04 - McDonald s 05 - KFC 06 - Halfords West boundary of site Street level view from Excelsior Road Retail Unit 1 Storeys Brick and metal corrugated cladding Surrounding materials In assessing the site context a series of key materials have been identified; Brick Metal Cladding HPL Panel Curtain Walling Render Brick 10 HPL panel render Metal cladding Curtain walling

New Talybont Halls, Cardiff University / Design & Access Statement Application Site Environmental Topography The site is brownfield with previous retail / industrial use. The site is generally flat with a localised rise in level of approx 2.5m to the adjacent hockey pitch and existing Talybont Residences. The A48 and railway are located in close proximity to the site and will be a source of noise and air pollution. A number of existing mature trees are to the immediate south of the site. Key Roads Rail line Site analysis plan (nts) Existing trees Application Site 11

New Talybont Halls, Cardiff University / Design & Access Statement Existing views across site 01 02 03 01 - View across application site with Talybont Gate to the right 02 - View of application site and CU hockey pitch from Talybont Gate 03 - View of application site from approach to Talybont Gate 04 - View of application site adjacent McDonald s entrance 05 - View across application site with KFC in the background 04 05 06 07 08 09 06 - View of existing on-site industrial / retail units (to be demolished) 07 - View of application site from Excelsior Road with McDonald s and Halfords in the foreground 08 - View of application site with Talybont Gate in background 09 - View across application site adjacent entrance to Booker Wholesale 12