Heating Coils manifold

Similar documents
Exhaust bellow APPLICATION REPORT. Application: Expansion bellow repaired. Place: Rotterdam. Date: June Job and report done by:

Heating Coils - Tank APPLICATION REPORT. Application: Repair of Heating Coils. Place: Lisnave, Portugal. Date: October Job and report done by:

Basic Maintenance and Testing of DC Electric Motors. Part 2. Howard W Penrose, Ph.D., CMRP President, SUCCESS by DESIGN

Products That Work. Products That Last. Since The Professional s Choice APPLICATION MAINTENANCE INSTRUCTIONS

High-Pressure Washer BY02-VBP-WTR BY02-VBP-WTH. CAUTION : Do not use this device before reading the instructions.

Electric Floor Grinding Machine. Model FG-11. Operator s Manual

STOP RESIN TUB WITH INTEGRAL DRAIN PLANNING BEFORE YOU BEGIN TOOLS AND MATERIALS: GETTING STARTED INSTALLATION INSTRUCTIONS.

45x195mm Ash Gloss Mosaic Tiles to Bathroom Wall Accent (Supplier: Classic Ceramics)

3/4 HP Model Trimmer Operating Instructions

STAINLESS STEEL TUB INSTALLATION

Ekopel 2k. 2K bathtub resurfacing coating. pabrec.com. Description. Package. Advantages. Technical data sheet

PRODUCT CARE AND MAINTENANCE

Schübeler DS-DIA Ducted Fan Series Manual

BG6UL. 6 Inch Bench Grinder Assembly & Operating Instructions

Theory of Operation: How Parts Cleaning Works

Walk-in Refrigerated Rooms. An Overview of Requirements, Options and Construction Details

K2 Compact. K2 Compact, ,

ACRYLIC PEDESTAL TUB

ACRYLIC CLAWFOOT TUB

Installation Manual EF5000 NZ

chiang mai What It Means To Be Green VINYL WALLCOVERING High Durability (Fed. Spec. CCC-W-408D) Fire Testing Type II

1542 Jefferson Street, Teaneck NJ TEL: FAX:

ROTARY TUMBLER LORTONE INSTRUCTIONS AND PARTS LIST. Model 3-1.5B. Model 45C. Model 33B Cyrus Way Mukilteo, WA (425)

Processing instructions V 400. REFRAMIX GP, REFRARAM GP: Basic multi-purpose mixes. REFRAMIX GP, REFRARAM GP: Basic multi-purpose mixes

Complete HVAC Capability. Central Station Air Handling Units. Publication No. WT-CSX-0616A

Model K 520 M Part No

SOLDERING EQUIPMENT AND ACCESSORIES CHEMICAL PRODUCTS

SAAB 99 Series H Type Engine. Installation Guide Silicone Cooling System Hoses. Classic Silicone Hoses

hygienic design CLEANLINESS MADE TO MEASURE: HYGIENIC DESIGN FANS

Portable Dust Collection Systems

INSTALLATION GUIDE AND CHECKLIST

A ROUGH GUIDE TO CONSTRUCT A PASSIVE SOLAR AIR HEATER

Maintenance 5-1. Good maintenance is essential for cleaning results, and long economical life of the washer.

USER MANUAL 300 // CERAMIC HOB - KNOB TCK30

K 2 Compact. K 2 Compact, ,

INLET DAMPER WALL FAN UNIT

IRRIGATION EQUIPMENT LTD. The Perfect Solution for Water Filtration and Irrigation Problems

K 5 Compact Home T250

Installation Instructions. DucoStone and DucoLite Shower Trays 226MEZ 0117CH

Installation Manual EF5000 AUS & NZ

TM585. Refrigerator - Freezer Operation manual. Contents

K 2 Premium Car & Home

Bar Fridge USER MANUAL MB46W

BATHBAY COLLECTION INSTALLATION AND OPERATION INSTRUCTIONS

Bonding teak ship decks with SABA Deckfast MS

K 2 Compact. Compact and tidy storage. Sits comfortably in the hand. Full cleaning power

Care and maintenance instructions for products supplied by VEKSØ A/S

MERIDIAN MODEL# 3793

K 2 Compact Car & Home

P.O.D. Pressure On Demand

Maitenance guide N 3. for oiled DI LEGNO parquet floors white finishing

INSTRUCTION MANUAL HETO CBN 8 / 18 / C Cooling Baths ID: IM.doc Revision 1

CORTEC. CORTEC

DIVISION 15 MECHANICAL

INSTRUCTIONS AND PARTS LIST. Model 3A LORTONE Cyrus Way Mukilteo, WA (425)

SAFETY AND OPERATING MANUAL


TOP 6 RECOMMENDED CLEANING PRODUCTS

COATING WATER HEATERS BY POWDERING, SPRAYING OR FLOODING ON OVERHEAD CONVEYOR CHAIN

Outdoor Furniture STOP. IMPORTANT If you have any problems with this product (missing or damaged parts, assembly issues, etc.),

PS /2 Inch Angle Grinder Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT.

K 3 K 3, ,

G-10s. Instruction Manual. G-Series Cooler UPRIGHT COOLER. Part No.11IPA

Nanoprotech Italia

K K 3.550, ,

TecnoClean Coatings. Benefits

Roofing Adhesive SARNACOL 2172 Spray

K 2.97 M. Specifications Operating pressure, max PSI Water volume GPM Voltage V Amp draw AMPS

Centrifugal Disc Finishing

INTRODUCTION Congratulations on your purchase of the SX-15 hard surface cleaning tool. Years of experience, engineering, and planning have gone into t

Products K 2 Home. Technical data

VELVET MARMORINO. Fine natural mineral lime finish

Power Washer Maintenance

INDUSTRIAL VACUUM SYSTEMS LIQUID AND SWARF VACUUMS INDUSTRIAL VACUUMS BUILD-IN VACUUMS DEDUSTING SYSTEMS STATIONARY VACUUM SYSTEMS

K 4 Compact. K 4 Compact, ,

K2 Compact. K2 Compact, ,

Solids Handling and Reduction Choices for Wastewater Applications

K 2 Plus Home *AU. K 2 Plus Home *AU, ,

Asbestos. Removing. Read this booklet for: steps and care you should take if your home has asbestos-containing material advice about protective gear.

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30)

LITTLE BLASTER LARRY HESS AND ASSOCIATES, INC. BLAST-IT-ALL P.O. BOX 1615 SALISBURY, NC WITH DUST COLLECTOR

Installation of Glass Lined Equipment

Solutions for internal vessel cleaning

English BT3600

Model HD 3501 Part No High Pressure Washer Operator Manual

K 2 K 2, ,

K 2 Car. K 2 Car, ,

K K 2.100, ,

Raychem Heating System

Nu-Brite Same popular Nu-Brite Powerful high foaming action lifts out dirt and grime while brightening coils Excellent & powerful cleaner that is espe

K Balcony. K Balcony, ,

Operating Instructions

Basic Cleaning Concepts

Instructions for Coating Fimbel Garage Door Panels

SJ-22G SJ-25G SJ-29G. Refrigerator - Freezer Operation manual. Contents. Refrigerant: R600a Insulation blowing gas: Cyclopentane ENGLISH

THE CLEAR CHOICE FOR CLEANING

PLATE HEAT EXCHANGER

Cordless Vacuum Cleaner D18 Instruction Manual. Read this user manual carefully before first use. Keep this manual for further guidance in case.

Wax Base Heater & Dispenser

kl-direkt WIND POWER Towers Wet paint overspray Large components Zinc spraying processes Power head Fabrication processes Special edition: Wind Power

Transcription:

APPLICATION REPORT Heating Coils manifold Application: Place: Heating Coils manifold suffering from external corrosion. Tuzla, Turkey Date: November 2014 Job and report done by: Wencon products used: Clients crew 1088 light + 1088 dark, Reinforcement Tape, Cleaner, Perago disc, appl. tools

Introduction: Heating Coils Manifolds suffering from external corrosion problems for several years. Several initiatives to stop the attacks have been done, using different kind of products, but with limited success. Task is to find a viable solution to the problem. Besides, to find a solution that makes the crew able to perform the job, without use of special equipment, but with accessible tools, 1. 2. expected to be on board a tanker. 1. Overview: One out of 14 deck Heating Coils manifold. 3. 2. Piping is heavy attacked by corrosion. Condition of valves, seems to be a lot better by visual inspection. 3. U-bolts to be removed, in order to lift pipes from bearing. Purpose is to achieve free access to application. 4. 4. Free access to a proper surface penetration and a decent application, without individual openings in the coating by every bearing point on the pipeline.

5. To prepare the surface, a Needle gun is used for chipping the complete surfaces - a very time-consuming task. It is a crucial factor, to ensure the best adhesion possible, under these working conditions. 5. 6. By chipping it is very clear, that piping locally suffers from heavy corrosion. 6. 7. Close up picture during chipping. It is important, to obtain as rough surface as possible during Chipping, to ensure the best adhesion. 7. Therefore, do not use wire brush or similar, since this will only polish the surfaces. 8. Wencon Cleaner applied with a brush, to degrease pipings, prior to application. 8.

9. Wencon 1088 Light applied as the first layer, using a brush. To ensure the best adhesion, it is important to rub the Wencon Coating into the dry surface, and hereafter distribute a thick layer of Coating. 9. 10.While 1088 Light is still wet, Wencon Reinforcement Tape is wrapped with 50% overlap. Wencon 1088 Light will penetrate the pores in the tape, and will divide to a smooth surface when using a brush. Afterwards, left for semi curing in approx. 1½ hour before applying second and final layer. 10. A good advice: Place a finger in the coating, that leaves a fingerprint - without sticking to your finger. You are then ready for second layer. 11. 11.Second and final layer, the Wencon 1088 Dark applied, using a brush. After ended application, please allow minimum 12 hours curing, before opening steam valves from the Engine Room. 12. 12. Final result.

Surface preparation WENCON Choose the relevant surface preparation, according to the nature of the job. Seek advice from a Wencon Technician if needed. Specification for surface preparation for Dry Applications Defined as applications, where the Wencon product will be applied to a surface at a temperature minimum 3 degrees above dew point. Use the Wencon Products: Wencon Cream, Wencon Rapid, Wencon Coating, Wencon Ceramic Cream, Wencon Ceramic Coating, Wencon Hi-Temp, all requiring a dry surface. 1. Blast the machine part to SA 2 ½ using sharp-edged blasting media, to a roughness of min. 75 microns. 2. Leave the part for sweating out salts in a warm place for at least 12 hours or heat it up to 30-40 C (86-104 F) using gas torches. 3. Blast again to SA 2 ½ immediately prior to the application. 4. For parts containing lots of water and salt, it may be necessary to repeat 2. and 3. until the surface remains light grey for at least 2 hours after blasting. 5. Always use Wencon Cleaner prior to application. Specification for surface preparation for Wet/Damp Applications Defined as applications, where the Wencon product will be applied to a surface at a temperature less than 3 degrees above dew point. Use the products Wencon UW Putty, Wencon UW Cream and Wencon UW Coating for applications on wet or damp surfaces. 1. Water jet the entire surface with water and sand to a standard equal to SA 2½, as described above. Specification for surface preparation for Emergency/Temporary Applications Perago Treatment Perago is a rubber disk with hard steel spikes mounted on the periphery. Perago can be mounted in a normal drilling machine, and gives a surface close to a blasted surface - clean and rough with sharp edges. Perago dishes can be ordered at Wencon and at all Wencon Distributors. Grinding Wheel grinding is often an acceptable surface preparation for emergency applications, where shot blasting is not possible. When grinding use a coarse stone or flap. Use the Wencon Cleaner before and after grinding. Grinding with sandpaper or emery cloth is only advisable when, for example, carrying out shaft-repair on a lathe. Often the grinding will not hit the dents. Needle Gunning Needle gunning is a method that has almost been forgotten in recent years. Or should we say is mostly used for very rough cleaning or removal of rust. It is possible to do a very nice job using a needle gun, but it takes time and should be closely supervised. It is essential that the marks from the sharp needles cover the whole surface so that none of the original surface remains. It is recommendable to steam clean the surface before needle gunning. Wire Brushing Wire brushing can be a good way of removing scales, rust and old paint. However, you will need to grind the surfaces after the wirebrushing to make the surface as rough as possible. Phone +45 6481 1010 wencon@wencon.com www.wencon.com

WENCON Application data sheet Protection of hot pipes (or cold) 115 When treating flanged pipes, fit the pipes on board and treat them ashore Hot-water, hot-oil or steam pipes will often be exposed to corrosion on the outer side, due to moisture or water in the insulation. Wencon can eliminate this breakdown with a coat of Wencon Hi-Temp. Wencon Hi-Temp is a two-component fluid. It can be applied with a paint brush, and quite exceptionally it can be applied at temperatures of over 120 C (248 F). The cured coating can withstand temperatures up to 160-200 C (320-424 F) depending upon ambient influences. When treating welded pipe systems, fit the pipes on board, cover the ends (approx. 150 mm), and treat the rest ashore. After final assembly grind, clean and coat the welding zones. The coating is very simple to apply and can be made either before or after the pipes have been installed. The most common method, especially with new buildings, is that the pipes are first fitted on board, then removed ashore to be shot-blasted and coated. The only hindrance to making this operation on board is the lack of space. One of the big advantages with the coating is that damages on the finished coating are easily repaired. The repair is limited to grinding the damaged area and applying a new coat. Consumption of material. See chapter 1 in the Wencon Repair Manual. Apply Wencon Hi-Temp For this application use radiator brushes with half the bristles cut off. This makes the brush well suited to the consistency of Wencon Hi-Temp. 1. Grit blast or grind a belt around the area to be repaired, and clean with Wencon Cleaner. 2. Apply the first layer of Wencon Hi-Temp yellow and let it semicure. 3. While the first layer is still tacky, apply the next layer of Wencon Hi-Temp Green. 4. The repair can be reinforced by using Wencon Reinforcement Tape wrapped tight in the wet Hi-Temp. 5. The finished layer thickness shall be 600-800 microns. Phone +45 6481 1010 wencon@wencon.com www.wencon.com APPLICATION DATA SHEET No. 115