SECTION AIR COILS

Similar documents
SECTION AIR-SOURCE UNITARY HEAT PUMPS

SECTION AIR COILS

SECTION WATER-SOURCE UNITARY HEAT PUMPS

SECTION CONVECTION HEATING AND COOLING UNITS

SECTION WATER-SOURCE UNITARY HEAT PUMPS

SECTION (15767) - UNIT HEATERS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION GAS-FIRED RADIANT HEATERS

SECTION ISOLATED POWER SYSTEMS

SECTION AIR COOLED WATER CHILLERS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

SECTION CONVECTION HEATING AND COOLING UNITS

SECTION COMPUTER-ROOM AIR-CONDITIONERS

SECTION AIR DOORS

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services

SECTION FAN COIL UNITS

A. This Section includes air-handling units with coils for indoor installations.

SECTION AIR DUCT ACCESSORIES

SECTION FUEL-FIRED DOMESTIC WATER HEATERS

A. American National Standards Institute (ANSI) : Establishes requirements applicable to certifying direct gas-fired heaters.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

University of Delaware

A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

Construction Standards Page

SECTION PLUMBING EQUIPMENT

Custom Duct Heaters. Special Applications

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

AIR HANDLING UNITS Vibration Isolation Air Filtration Equipment Ductwork.

SECTION ROTARY-SCREW WATER CHILLERS

SINGLE DUCT TERMINAL UNITS

Design and Construction Standards SECTION PLUMBING EQUIPMENT

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.

SECTION AIR HANDLING UNIT

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

SSL / SBS Sales Guide BLOWER-COILS REDUCED-FOOTPRINT, VERTICAL

C. Samples for Initial Selection: For units with factory-applied color finishes.

SECTION AUTOMATIC TRANSFER SWITCHES

Chilled Water DOAS Fan Powered Terminal Units

Complete HVAC Capability. Central Station Air Handling Units. Publication No. WT-CSX-0616A

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Submittal Data Performance Data Electrical Data

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

15900 HVAC INSTRUMENTATION AND CONTROLS

Custom Duct Heaters. Special Applications

UFGS (February 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION REFRIGERATION EQUIPMENT. A. Section Includes: Refrigeration equipment for insulated cold storage rooms including necessary accessories.

.2 Section Waste Management and Disposal.

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION AUTOMATIC TRANSFER SWITCHES

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

SECTION STEAM CONDENSATE PUMPS

SECTION REFRIGERANT PIPING

UNIFIED FACILITIES GUIDE SPECIFICATIONS

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

SECTION HEATING BOILERS

SECTION ELECTRIC-DRIVEN, FIRE PUMPS

UFGS (August 2008) UFGS (January 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION AIR HANDLING UNITS WITH COILS. 1. Central Station Air Handling Units. 1. Section Basic Mechanical Requirements.

Standard Duct Heaters Open Coil

SECTION GENERATOR PARALLELING CONTROLS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

SECTION PACKAGE AIR COOLED WATER CHILLER PART 1 GENERAL 1.01 SECTION INCLUDES. A. Chiller package. B. Charge of refrigerant and oil.

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM

AIR HANDLER SPECIFICATION

SECTION BIOLOGICAL SAFETY CABINETS AND LAMINAR AIRFLOW WORK STATIONS

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

1.1 This section applies to air handling units for HVAC Systems.

SECTION PLUMBING EQUIPMENT

SECTION COMMERCIAL-KITCHEN HOODS

SECTION CUSTOM FABRICATED LABORATORY EQUIPMENT. This section specifies necropsy // dissecting tables // and // animalcage

TABLE OF CONTENTS page 2

SECTION DECENTRALIZED UNITARY HVAC EQUIPMENT

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

Stanford University Facilities Design Guidelines SECTION DECENTRALIZED UNITARY HVAC EQUIPMENT

SECTION ROOFTOP REPLACEMENT AIR UNITS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

VIFB Coil Technical Guide

A. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION HEATING BOILER FEEDWATER EQUIPMENT

1.2 REFERENCES - comply with the following codes and standards:

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

A. Section Common Motor Requirements for HVAC Equipment: Fan motors.

DESIGN GUIDELINES SPLIT TYPE AIR TO AIR HEAT PUMPS PAGE 1 of 6

SECTION COOLING TOWERS

SECTION STEAM CONDENSATE PUMPS

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

Series PACKAGED ROOFTOP UNITS, HEAT PUMPS AND OUTDOOR AIR HANDLING UNITS. Features:

VIFB Coil Technical Guide

Bulletin A Brasch Manufacturing Co., Inc.

Horizontal and Vertical DIRECT DRIVE BLOWER COIL UNITS. Rating and selection at

A. Section includes factory-packaged units capable of supplying up to 100 percent outdoor air and providing cooling and heating.

SECTION AIR COILS

Transcription:

PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 82 16 AIR COILS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. Heating and cooling coils for air handling unit and duct applications 1.2 RELATED WORK A. Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM GENERATION. B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC. C. Section 23 31 00, HVAC DUCTS AND CASINGS D. Section 23 36 00, AIR TERMINAL UNITS: Reheat coils for VAV/CV terminals. E. Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS. F. Section 23 74 13, PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS G. Section 23 82 00, CONVECTION HEATING AND COOLING UNITS H. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training. I. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS 1.3 QUALITY ASSURANCE A. Refer to paragraph, QUALITY ASSURANCE, Section 23 05 11, COMMON WORK RESULTS FOR HVAC, //Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM GENERATION//. B. Unless specifically exempted by these specifications, heating and cooling coils shall be tested, rated, and certified in accordance with AHRI Standard 4l0 and shall bear the AHRI certification label. 1.4 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. B. Manufacturer's Literature and Data for Heating and Cooling Coils: Submit type, size, arrangements and performance details. Present application ratings in the form of tables, charts or curves. C. Provide installation, operating and maintenance instructions. D. Certification Compliance: Evidence of listing in current ARI Directory of Certified Applied Air Conditioning Products. E. Coils may be submitted with Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS, Section 23 74 13, PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS, Section 23 36 00, AIR TERMINAL UNITS, or Section 23 82 00, CONVECTION HEATING AND COOLING UNITS. 23 82 16-1

F. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS. 1.5 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. B. Air Conditioning and Refrigeration Institute (AHRI): Directory of Certified Applied Air Conditioning Products AHRI 4l0-01... Forced-Circulation Air-Cooling and Air-Heating Coils C. American Society for Testing and Materials (ASTM): B75/75M-02... Standard Specifications for Seamless Copper Tube D. National Fire Protection Association (NFPA): 70-11... National Electric Code E. National Electric Manufacturers Association (NEMA): 250-11... Enclosures for Electrical Equipment (1,000 Volts Maximum) F. Underwriters Laboratories, Inc. (UL): 1996-09... Electric Duct Heaters PART 2 - PRODUCTS 2.1 HEATING AND COOLING COILS A. Conform to ASTM B75 and AHRI 410. B. Surgical Suites All Locations: All coils installed in the air handling units serving surgical suites, duct-mounted reheat coils, and air terminal unit-mounted reheat coils shall be equipped with copper fins. SPEC WRITER NOTE: Provide corrosion protection for all coils located in the air-handling unit coils in high-humidity locations (VA HVAC Design Manual Chapter 7) and as determined by the designer for a specific location. Coating should not be used for the chemically corrosive locations where the ph values are not within 3 to 12. C. High Humidity Locations: For air-handling unit mounted coils provide the following corrosion treatment: 1. Epoxy Immersion Coating Electrically Deposited: The multi-stage corrosion-resistant coating application comprises of cleaning (heated alkaline immersion bath) and reverse-osmosis immersion rinse prior to the start of the coating process. The coating thickness shall be 23 82 16-2

maintained between 0.6-mil and 1.2-mil. Before the coils are subjected to high-temperature oven cure, they are treated to permeate immersion rinse and spray. Where the coils are subject to UV exposure, UV protection spray treatment comprising of UV-resistant urethane mastic topcoat shall be applied. Provide complete coating process traceability for each coil and minimum five years of limited warranty. 2. The coating process shall such that uniform coating thickness is maintained at the fin edges. The quality control shall be maintained by ensuring compliance to the applicable ASTM Standards for the following: a. Salt Spray Resistance (Minimum 6,000 Hours) b. Humidity Resistance (Minimum 1,000 Hours) c. Water Immersion (Minimum 260 Hours) d. Cross-Hatch Adhesion (Minimum 4B-5B Rating) e. Impact Resistance (Up to 160 Inch/Pound) D. Tubes: Minimum 16 mm (0.625 inch) tube diameter; Seamless copper tubing. E. Fins: 0.1397 mm (0.0055 inch) aluminum or 0.1143 mm (0.0045 inch) copper mechanically bonded or soldered or helically wound around tubing. F. Headers: Copper, welded steel or cast iron. Provide seamless copper tubing or resistance welded steel tube for volatile refrigerant coils. G. "U" Bends, Where Used: Machine die-formed, silver brazed to tube ends. H. Coil Casing: 1.6 mm (l6 gage) galvanized steel with tube supports at 1200 mm (48 inch) maximum spacing. Construct casing to eliminate air bypass and moisture carry-over. Provide duct connection flanges. I. Pressures kpa (PSIG): Pressure Water Coil Steam Coil Refrigerant Coil Test 2070 (300) 1725 (250) 2070 (300) Working 1380 (200) 520 (75) 1725 (250) J. Protection: Unless protected by the coil casing, provide cardboard, plywood, or plastic material at the factory to protect tube and finned surfaces during shipping and construction activities. K. Vents and Drain: Coils that are not vented or drainable by the piping system shall have capped vent/drain connections extended through coil casing. L. Cooling Coil Condensate Drain Pan: Section 23 73 00, INDOOR CENTRAL- STATION AIR-HANDLING UNITS or Section 23 74 13, PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS. 23 82 16-3

M. Steam Distributing Coils: Conform to ASTM B75 and ARI 410. Minimum 9.5 mm (3/8-inch) steam distributing tubing installed concentrically in 25 mm (one-inch) OD condensing coil tubes. N. Integral Face and Bypass Type Steam Coil: 1. Exempt from ARI Test and Certification. 2. Conform to ASTM B75 and ARI 410. 3. Minimum 16 mm (5/8-inch) steam tube installed in concentrically 25 mm (one-inch) OD diameter tube. 4. Casing: 1.9 mm (l4 gage) galvanized steel with corrosion resistant paint. 5. Tubes and Bypasses: Vertical or horizontal. DESIGNER NOTE: Pneumatic damper operators may be used only while connecting to any existing pneumatic control system. O. Dampers: Interlocking opposed blades to completely isolate coil from air flow when unit is in bypass position; 1.6 mm (l6 gage) steel, coated with factory applied corrosion resistant baked enamel finish. Provide damper linkage and // pneumatic operator(s) // electric operators//. Damper operators shall be of same manufacturer as controls furnished under Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. // 2.2 REHEAT COILS, DUCT MOUNTED The coils shall be continuous circuit booster type for steam or hot water as shown on drawings. Use the same coil material as listed in Paragraphs 2.1. 2.3 WATER COILS, INCLUDING GLYCOL-WATER A. Use the same coil material as listed in Paragraphs 2.1. B. Drainable Type (Self Draining, Self Venting); Manufacturer standard: l. Cooling, all types. 2. Heating or preheat. 3. Runaround energy recovery. ARI certification of capacity adjustment is waived. See Section 23 72 00, AIR-TO-AIR ENERGY RECOVERY EQUIPMENT. C. Cleanable Tube Type; manufacturer standard: l. Well water applications. 2. Waste water applications. 2.4 VOLATILE REFRIGERANT COILS A. Continuous circuit, straight tubes, dry expansion type equipped with multi-port distribution header, less expansion valve. B. Minimum 16 mm (5/8-inch) tube diameter. C. Designed for R22 or other EPA approved refrigerants. 23 82 16-4

2.5 ELECTRIC HEATING COILS A. Standards: ARI 4l0 is not applicable. Electric coils shall meet the requirements of the National Electric Code (NEC) and UL l996. B. General: Aluminized steel frame, spot welded. Duct mounted units may be flanged or slip-in design with built-in terminal box completely factory wired to terminals. Control panels for coils in air handling units may be built-in or remote in NEMA l enclosure. C. Coils: Open type, 80 percent nickel, 20 percent chromium resistance wire, insulated by floating ceramic bushings and supported in aluminized steel brackets spaced on 100 mm (4-inch) maximum centers. Coils shall be mechanically crimped in stainless steel terminals which are insulated from the frame with high temperature molded phenolic bushings. D. Over Temperature Protection: l. Primary system: Automatic reset thermal cutout. 2. Secondary system: Load-carrying manual reset thermal cutout factory wired in series with each heater stage. E. Overcurrent Protection: Comply with UL and NEC. SPEC WRITER NOTE: Specify mercury type contactors when quiet operation (reheat coil above ceiling) is required. F. Contactors: Disconnecting magnetic type, (when required), except for duct mounted reheat coils contractors shall be disconnecting mercury type. G. Airflow Interlock: Diaphragm operated differential airflow pressure switch. SPEC WRITER NOTE: Verify that temperature controls are shown on the drawings. Include these temperature controls in Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. H. Leaving air temperature control for electric coils mounted in air handling units shall be // 3 // // 6 // // l0 // // l8 // step control driven by a unit mounted modulating thermostat. PART 3 - EXECUTION 3.1 INSTALLATION A. Follow coil manufacturer's instructions for handling, cleaning, installation and piping connections. B. Comb fins, if damaged. Eliminate air bypass or leakage at coil sections. 3.2 STARTUP AND TESTING A. The Commissioning Agent will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing 23 82 16-5

schedules with the Resident Engineer and Commissioning Agent. Provide a minimum of 7 days prior notice. 3.3 COMMISSIONING A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS for all inspection, start up, and contractor testing required above and required by the System Readiness Checklist provided by the Commissioning Agent. B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning. 3.4 DEMONSTRATION AND TRAINING A. Provide services of manufacturer s technical representative for four hours to instruct VA personnel in operation and maintenance of units. B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS. - - - E N D - - - 23 82 16-6