Similar documents
SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

The following general requirements will be met for all planter box installations:

DIVISION II PLANTING SECTION 02950

Section 815. LANDSCAPING

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

EXTERIOR PLANTS

OVERALL LANDSCAPE PLAN

2-B-18-UR. Revised: 3/27/2018

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Wisconsin Contractors Institute Continuing Education

Construction Specification for Planting

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

SECTION LANDSCAPE

SECTION 900 TURF ESTABLISHMENT

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

A. Surface parking areas shall be constructed of bituminous paving.

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

SECTION TREES, SHRUBS AND GROUNDCOVERS

317)

BUSINESS PARK TOWN OF OKOTOKS

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

SECTION TREES, PLANTS AND GROUND COVERS

SECTION TREE TRANSPLANTING

B. Finish Grade: Elevation of finished surface of planting soil.

2.1.4 Roof Downspout Rain Gardens

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

City of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS


Low Impact Development Practices

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

ISSUANCES FINAL 4.1 SITE PLAN SUBMISSION

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

SECTION 605 PLANTING

LOT 66 VACANT Ca (4) 3 BICYCLE PARKING SPACES. REFER ARCH. CANOPY ABOVE (SHOWN DASHED) REFER ARCH.

Stormwater Control Plan: Small (Tier 1) Land Development Project

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Analyzing the Bioretention Construction Sequence

VICINITY MAP 1" = 1000'

ABBREVIATIONS. Dwg LID of 1. Abbreviations

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

ANEW LANDSCAPE really

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO.

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.


Planting Trees & Shrubs. Choosing Trees and Shrubs. Tree Quotes

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

St. Monica Food Pantry

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014

SECTION FINE GRADING AND SOIL PREPARATION

Town of Fuquay-Varina

HALIFAX REGIONAL MUNICIPALITY

Planting Trees & Shrubs. and Shrubs Study Guide

Case Study Bioretention Installation and Maintenance

Tree Pits Construction Guide

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

Appendix G. Detailed Design

Dan, this is a list of the items included in the submittal package for the Plan Commission Public Hearing on May 24, 2018:

Installation Manual May 9/14 No revision

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

Milpitas College Extension Milpitas Dry Landscape

Besides performing this function, they also look really nice

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Landscape Restoration Specifications

Preparing a Stormwater Control Plan for a Small Land Development Project

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements.

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging.

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

BIORETENTION FACILITY

PART E SPECIFICATIONS

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

SECTION LANDSCAPING

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

SECTION TURF AND GRASSES

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection?

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program

ACTIVITY: Trees, Shrubs and Vines ES 10

WILSON PLACE FINAL DESIGN

EROSION & SEDIMENT CONTROL

Transcription:

PR 2 PM 3 PR 2 PR 2 BIORETENTION AND FOREBAY PLANTINGS (IN HATCHED AREA) TO INCLUDE: NORTHERN BAYBERRY (MORELLA PENSYLVANICA) VIRGINIA ROSE (ROSA VIRGINIANA) SWITCH GRASS (PANICUM VIRGATUM) DWARF HUCKLEBERRY (GAYLUSSACIA DUMOSA) AB 4 MP 3 AUV 11 MP 2 BH 3 last modified: 04/30/15 printed: 05/07/15 by ca P:\PROVINCETOWN AIRPORT\2011\E2X57800\700 CADD\740-WORK\NOI - PERMIT SET\09-4027_GD.dwg BIORETENTION SIDE SLOPE PLANTINGS TO INCLUDE: AMERICAN BEACHGRASS (AMMOPHILA BREVILIGULATA) BEARBERRY (ARCTOSTAPHYLOS UVA-URSI) SEASIDE GOLDENROD (SOLIDAGO SEMPERVIRENS) BEACH HEATH (HUDSONIA TOMENTOSA) LITTLE BLUESTEM (SCHIZACHYRIUM SCOPARIUM) 102 LF BITUMINOUS CURB FOUR GRAVEL PARKING SPACES TWO GRAVEL PARKING SPACES R2.0' R3.0' 4,158 SF PERMEABLE GRAVEL PAVER PARKING STALLS APPROX. 2,830 SF POROUS ASPHALT DRIVE AISLE R3.0' 9.5' 9.8' 9.4' R10.0' 23 LF BITUMINOUS CURB 24 LF 12" HIGH GRANITE CURB TP #1 R3.0' 9.2' PITCH 21.0' TOC 9.5' 10.5' 18.0' 9.7' 8.3' 1% 8.8' 2.3% 21.0' 10.4' TP #4 2% PAVED FLUME 11.5' 8.3' SS R10.0' R3.0' 9.0' TYP. TP #2 11.4 SILT SOCK 8.8' SS R3.0' R8.0' 11.3' 11.2' 8.3' 8.8' SS TP #3 LIMIT OF DISTURBANCE PAVED FLUME 11.6' 8.8' 8.8' SS BIORETENTION (SEE NOTES FOR PLANTINGS) 5' EMERGENCY OVERFLOW SPILLWAY CREST ELEV.= 6.3' A GRAPHIC SCALE 20 0 10 20 40 80 (in feet) 1 INCH = 20 FEET Horsley Witten Group, Inc. 90 Route 6A Sandwich, MA 02563 Tel: (508) 833-660 Fax: (508) 833-3150 www.horsleywitten.com

EXISTING GROUND EROSION CONTROL BLANKET ON SIDESLOPES BIORETENTION PLANTING (SEE NOTES ON SITE PLAN) PONDING DEPTH (SEE SITE PLAN) BIORETENTION SURFACE BIORETENTION SOIL 30" MIN. 3:1 TYP. POROUS PAVEMENT (SEE DETAIL) CONCRETE FOOTING (MIN. 3,000 PSI) 6" (MIN.) 12" (MIN.) 12" (MIN.) 12" (TYP.) 9" (MIN.) 4" 12" REVEAL 4" VERTICAL GRANITE OR PRECAST CONCRETE CURB SEE PLANS SEE SITE PLAN AND DETAILS FOR SLOPE & MATERIAL (2:1 MAX.) COMPACTED DENSE GRADE GRAVEL OR RECLAIMED ASPHALT SUBBASE APPROVED NATIVE MATERIAL MATERIAL BIORETENTION AREA DETAIL VERTICAL EXCAVATION SLOPE (PREFERRED) OR ALTERNATIVE SLOPE (MAX. 1:1) CONTRACTOR SHALL BE RESPONSIBLE FOR SLOPE STABILIZATION NOTE: APPROVED SUBGRADE 1. VERTICAL CURB MIN. HEIGHT = 24" MIN. WIDTH = 6" 2. VERTICAL CURBING TO BE INSTALLED AS SHOWN ON THE SITE PLAN. 3. PROVIDE CURB EXPANSION JOINTS AT 5'-0" TO 6'-0" O.C. 4. CURB REPLACEMENT IN EXISTING PAVEMENT - SAWCUT EDGE MIN. 12" FROM CURB. 5. CONCRETE CURB - PROVIDE 1" CHAMFER OF EDGE ALONG PAVEMENT SIDE FACE FOR CONCRETE CURB. 6. CONCRETE CURB - TO HAVE A MINIMUM CONCRETE STRENGTH OF 4,000 PSI 7. CEMENT MORTAR JOINTS & INSTALL PREFORMED (1/2") EXPANSION JOINT WHERE REQUIRED. TYPICAL VERTICAL CURB last modified: 04/28/15 printed: 05/07/15 by ca P:\PROVINCETOWN AIRPORT\2011\E2X57800\700 CADD\740-WORK\NOI - PERMIT SET\10-11 - HW-4027_DE.dwg BIT. BERM OR CURB GUTTER LINE R=3.0' MIN. WHERE NOT AT LOWPOINT CONSTRUCT WITH A LOCALIZED LOWPOINT ALONG GUTTER 2" BELOW TYP. GRADE TO AVOID BYPASS 1% MIN. SLOPE NOTES: 1. THE STONE END SECTION TO BE UNDERCUT SO THAT THE INVERT OF THE APRON TO BE AT THE SAME GRADE (FLUSH) WITH THE TOP OF STONE. 2. THE WIDTH OF THE END OF THE APRON TO BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1. 6. THE GEOTEXTILE FILTER FABRIC TO BE MIRAFI 140N OR EQUIVALENT FINISH PAVEMENT TOE FABRIC APPROVED LOW POINT OR LOCALIZED SUBGRADE DEPRESSION WHEN ALONG CONTINUES GUTTER LINE SLOPE EXTEND FLUME 2' MIN. PAST GUTTER (1% MIN. SLOPE) 6" ROAD BASE 6" 2' 1' PLAN VIEW BITUMINOUS APRON STONE & FABRIC TWO LAYERS TYPE I-1 BIT. ASPHALT (SEE PAVEMENT DETAIL) 12" DEPTH APPROVED SUBGRADE SECTION VIEW CHANNEL SECTION LANDSCAPE STONE (D50 = 6") PAVED DRAINAGE FLUME DETAIL 2 WIDTH VARIES 1 6" LANDSCAPE "RIVER ROCK" COBBLE CHANNEL 1 2 4' WIDE AT END EXTEND STONE 4' PAST BOTTOM OF SLOPE 3" BASE OF 3/4" COMPACTED STONE OVER NON-WOVEN FILTER FABRIC ENGINEER APPROVED LOW PERMEABILITY CORE MATERIAL BIORETENTION SURFACE SEE PLAN 1' MIN. RIM ELEV.=6.8' 3 TYP 1 ENGINEER APPROVED LOW PERMEABILITY CORE MATERIAL 3 MAX. 1 SECTION 3' LEVEL SURFACE SEE PLAN 3.0' MIN. SECTION 0.33' MIN. 1' MIN. 5' WIDE 3 MAX. 1 NATIVE FILL NATIVE FILL 0.33' MIN. 3 TYP 2 MAX NOTES: 1. EROSION CONTROL BLANKET TO BE NORTH AMERICAN GREEN BIONET OR APPROVED EQUIVALENT. WATER FLOW WORK AREA PLAN VIEW 5' SURFACE TREATMENT EMERGENCY OVERFLOW SPILLWAY DETAIL AREA TO BE PROTECTED STAKE ON 10' LINEAL SPACING HI-RES ORANGE CONSTRUCTION FENCE SILT SOCK (12" - 18" TYPICAL) SEDIMENT SILT SOCK WORK AREA 1 SECTION STABILIZE W/ EROSION CONTROL BLANKET. KEY IN. CREST ELEV.=6.3' STABILIZE W/ EROSION CONTROL BLANKET. KEY IN. MATCH EXISTING GRADE (SEE PLAN) AREA TO BE PROTECTED NOTES: 1. SILT SOCK MANUFACTURER TO BE SILT SOXX OR ENGINEER APPROVED EQUAL. 2. ALL MATERIAL TO MEET MANUFACTURER'S SPECIFICATIONS. 3. SEDIMENT SILT SOCK TO BE FILLED WITH LEAF COMPOST AND/OR WOODY MULCH PER MANUFACTURER'S REQUIREMENTS. 4. FOLLOWING CONSTRUCTION AND SITE STABILIZATION, COMPOST MATERIAL TO BE REMOVED OR DISPERSED ON SITE, AS APPROVED BY THE ENGINEER. SEDIMENT SILT SOCK DETAIL 3"-4" 12"± 2" x 2" WOODEN STAKE 20" TYP. 6.6" TYP. 9.8" TYP. 3.3" TYP. 0.9" TYP. 2.4" TYP. SEE SITE PLAN (LOAM & SEED TO GRADE OR POROUS ASPHALT) TOP OF GRAVEL ENLARGEMENT SPECIFICATIONS 1. UNIT SIZE - 20" x 20" x 1" 2. STRENGTH - 5720 PSI 3. COLOR - BLACK (STANDARD) 4. UNIT WEIGHT - 19 OZ. OR 4.8 POUNDS 5. RESIN - 100% POST-CONSUMER RECYCLED HDPE/LDPE FINE GRAVEL 3/16" OR LESS (CLEAN, SHARP) RING SECTION WITH 3/16" MINUS GRAVEL FILL NOTES: 1. GRAVELPAVE2 PAVERS SHALL BE MANUFACTURED BY INVISIBLE STRUCTURES, INC. OR AN ENGINEER APPROVED EQUAL. 2. SANDY GRAVEL ROAD BASE MATERIAL SHALL PASS THE FOLLOWING SIEVE ANALYSIS: % PASSING SIEVE SIZE 100 3/4" 85 3/8" 60 #4 30 #40 <3 #200 3. EXTERIOR EDGE SHALL BE ANCHORED PER MANUFACTURER'S REQUIREMENTS OR AS APPROVED BY THE ENGINEEER. GRAVEL PAVE PARKING STALL DETAIL 12" PLAN GRAVELPAVE2 UNITS SEE ENLARGEMENT BELOW MANUFACTURER APPROVED FILTER FABRIC ATTACHED TO GRAVELPAVE2 BOTTOM COMPACTED SANDY GRAVEL BASE COURSE, 95% MODIFIED PROCTOR DENSITY COMPACTED SUBGRADE, 95% MODIFIED PROCTOR DENSITY GRAVELPAVE2 ATTACH WITH SNAP FIT FASTENERS ADJACENT GRAVELPAVE2 UNITS SECTION COMPACTED SANDY GRAVEL BASE COURSE PER MANUFACTURER SPECIFICATIONS Horsley Witten Group, Inc. 90 Route 6A Sandwich, MA 02563 Tel: (508) 833-660 Fax: (508) 833-3150 www.horsleywitten.com

RETAIN SAME FINISH GRADE AFTER PLANTING AS ORIGINAL GRADE BEFORE DIGGING EQ. EQ. GENTLY HAND-LOOSEN SOIL FROM AROUND ROOTBALL WITHOUT SEVERING MAIN ROOTS. SPREAD ROOTS OVER MOUND OF UNDISTURBED SUBGRADE EQ. COVER WITH 1" SAND. MOUND WITH EXCAVATED SOIL TO 3" ABOVE FINISHED GRADE. 2 x ROOT BALL DIAM. EXCAVATE HOLE TO DIAMETER 2X WIDER THAN ROOTBALL. BACKFILL WITH LOAM. PLANTING SPACING DETAIL VARIES VARIES PERENNIAL PLANTING DETAIL last modified: 04/28/15 printed: 05/07/15 by ca P:\PROVINCETOWN AIRPORT\2011\E2X57800\700 CADD\740-WORK\NOI - PERMIT SET\10-11 - HW-4027_DE.dwg REMOVE TOP THIRD OF BURLAP AT ROOTBALL SCARIFY BOTTOM OF PLANTING HOLE 4" DEEP 6" MIN. SURFACE TREATMENT BIORETENTION AREA 2' MIN. 2 x DIAMETER OF ROOTBALL SHRUB PLANTING DETAIL LANDSCAPE STONE (D50 = 6") 1 3 TOE FABRIC APPROVED SUBGRADE 4' SEDIMENTATION BERM DETAIL 3 PRUNE BROKEN OR DEAD BRANCHES AS DIRECTED BY LANDSCAPE ARCHITECT PLANT SHRUB PLUMB TOP OF ROOTBALL TO MATCH FINISH GRADE WITHIN 1" COVER WITH 1" SAND 2"-4" SOIL BERM PREPARED PLANTING SOIL MIXTURE UNDISTURBED PERVIOUS SOIL WIDTH VARIES 1 6" 6" STONE & FABRIC CHANNEL SECTION EROSION CONTROL MATTING (JUTE MESH OR EQUIVALENT) 1 APPROVED NATIVE BACKFILL MATERIAL 3 SEDIMENATION FOREBAY 4'-0" MIN. 3'-0" MIN. 12" MIN. 2x DIAMETER OF ROOT BALL EVERGREEN TREE PLANTING DETAIL REMOVE CONTAINER SCORE ROOTBALL IF POT-BOUND LOOSEN ROOTS PLANT TREE PLUMB - PRUNE BROKEN OR DEAD BRANCHES AS DIRECTED BY LANDSCAPE ARCHITECT NYLON GUY WEBBING- STAPLE OR TIE TO STAKE 3-2"x3"xVARIES WOOD STAKES TO FIRST WHORL OF BRANCHES @ 120 DEGREE INTERVALS AND PLACED PLUMB REMOVE TOP THIRD OF BURLAP AT ROOTBALL 3" SHREDDED MULCH IN TREE PIT OR AS INDICATED PREPARED PLANTING SOIL MIXTURE PERVIOUS SOIL CONTAINER PLANT ROOTBALL TREATMENT POROUS ASPHALT PER SPECIFICATIONS GRAVEL FILTER COURSE: 3/8" PEA GRAVEL RESERVOIR COURSE: 3 4 " CRUSHED STONE GRAVEL FILTER COURSE: 3/8" PEA GRAVEL APPROVED SUBGRADE SOIL PERMEABILITY > 0.5 IN./HR. GENERAL NOTES: 1. SANDY-LOAM AND/OR LOAMY-SAND TOPSOIL MATERIAL SHALL BE EXCAVATED FROM ALL PAVED AREAS PRIOR TO SUB-BASE INSTALLATION. 2. SUB-GRADE (EXISTING MATERIAL) SHALL CONSIST OF INERT MATERIAL THAT IS HARD, DURABLE STONE AND/OR COARSE SAND, FREE FROM LOAM AND CLAY TO A DEPTH NOT LESS THAN 4-FT BELOW THE FINISH PAVEMENT SURFACE. 3. SUBGRADE FILL SHALL BE COMPACTED TO 95% COMPACTION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 4. SEE SITE LAYOUT PLAN FOR PAVEMENT WIDTH AND LOCATION. 5. SEE GRADING PLANS FOR PAVEMENT SLOPE AND CROSS SLOPE. TYPICAL POROUS ASPHALT CROSS-SECTION POROUS PAVEMENT SEE DETAIL 6" 22" TYPICAL BITUMINOUS CURB DETAIL 4" 6" (MIN.) BITUMINOUS CURB NOTES: 1. BERM TO BE CONSTRUCTED OF BITUMINOUS WEARING SURFACE COURSE. 2. BERM TO BE CONSTRUCTED INTEGRAL WITH BITUMINOUS WEARING SURFACE. 3. WHEN BERM IS TO BE CONSTRUCTED ON A FRESH LAID BITUMINOUS SURFACE, THAT SURFACE MUST FIRST BE CLEANED. 4. BERM TO BE FOUNDED ENTIRELY ON THE BASE COURSE. 5. FINISH GRADE AT THE BACK OF THE BERM IS TO BE BROUGHT TO THE TOP OF THE BACK EDGE OF BERM. 4" 3" 3" 12" SEE SITE PLAN FOR SLOPE & MATERIAL Horsley Witten Group, Inc. 90 Route 6A Sandwich, MA 02563 Tel: (508) 833-660 Fax: (508) 833-3150 www.horsleywitten.com

NOTE: SEE SHEET 13 FOR COASTAL DUNE PLANTING SCHEDULE COASTAL DUNES

GENERAL PLANTING NOTES: 1. THE FOLLOWING NOTES ARE PROVIDED AS GENERAL PLANTING GUIDELINES ONLY. THOROUGHLY REVIEW THE PROJECT SPECIFICATIONS FOR ALL LANDSCAPE REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY LANDSCAPE WORK. SUBMIT IN WRITING TO THE LANDSCAPE ARCHITECT ANY QUESTIONS OR CLARIFICATIONS REQUIRED AT A MINIMUM OF 30 DAYS PRIOR TO ORDERING ANY MATERIALS OR BEGINNING ANY LANDSCAPE CONSTRUCTION. 2. SUBMIT TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL ALL REQUIRED LANDSCAPE SUBMITTALS AS DESCRIBED IN THE SPECIFICATIONS INCLUDING A PLANT LIST WITH PLANT SIZE AND QUANTITIES TO BE ORDERED PRIOR TO DELIVERY TO THE PROJECT SITE. 3. FURNISH AND INSTALL ALL PLANTS AS SHOWN ON THE DRAWINGS AND IN THE SIZE AND QUANTITIES SPECIFIED ON THE PLANTING SCHEDULE. PLANT SUBSTITUTION SELECTION MUST BE APPROVED BY BIOLOGIST OR LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 4. ALL PLANTS TO COMPLY WITH APPLICABLE REQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK." LATEST EDITION, PUBLISHED BY THE AMERICAN NURSERY AND LANDSCAPE ASSOCIATION INC. 5. PLANTS TO BE GROWN UNDER CLIMATIC CONDITIONS SIMILAR TO THOSE IN THE LOCALITY OF THE PROJECT FOR AT LEAST TWO (2) YEARS. USE HEALTHY NURSERY GROWN PLANTS, FREE OF DISEASE, INSECTS, AND PESTS. EGGS OR LARVAE, AND HAVE A WELL DEVELOPED ROOT SYSTEM. GENERAL SEEDING NOTES: 1. SEND A REPRESENTATIVE SAMPLE OF THE TOPSOIL TO A TESTING LABORATORY FOR STANDARD SOIL ANALYSIS AS DESCRIBED IN THE SPECIFICATIONS. SUBMIT TO THE LANDSCAPE ARCHITECT AND ENGINEER TEST RESULTS WITH RECOMMENDED SOIL TREATMENTS TO PROMOTE PLANT AND GRASS GROWTH. CORRECT DEFICIENCIES IN THE LOAM AND STOCKPILED TOPSOIL AS DIRECTED BY THE TESTING AGENCY. 2. ALL AREAS THAT ARE DISTURBED AND/OR GRADED DURING CONSTRUCTION ARE TO BE BROUGHT TO FINISHED GRADE WITH AT LEAST 6" MINIMUM DEPTH OF GOOD QUALITY LOAM AND SEEDED WITH A QUICK GERMINATING GRASS SEED SUCH AS NEW ENGLAND EROSION CONTROL RESTORATION MIX OR AS SPECIFIED ON THE PLANS. 3. PRIOR TO THE PLACEMENT OF TOP SOIL, LOOSEN THE SUBGRADE OF ALL PROPOSED SEEDED AREAS TO A DEPTH OF 6" AND RAKE TO REMOVE STONES LARGER THAN 1 INCH, STICKS, ROOTS, RUBBISH AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE TO AN OFF SITE LOCATION. 4. DO NOT SPREAD TOPSOIL IF THE SUBGRADE IS FROZEN, EXCESSIVELY WET, COMPACTED OR NOT PROPERLY PREPARED PER THE NOTES AND SPECIFICATIONS. WATERING NOTES: 1. PROVIDE PROPER PLANT CARE, MAINTENANCE AND WATERING ON SITE UNTIL SUCH TIME AS THE LANDSCAPING IS ACCEPTED BY THE PROPERTY OWNER AS SATISFACTORY PER THE SPECIFICATIONS OR AS DETERMINED BY ANY WRITTEN AGREEMENTS BETWEEN THE CONTRACTOR AND PROPERTY OWNER. 2. ESTABLISH AN APPROPRIATE WATERING SCHEDULE FOR ALL PLANT MATERIAL BASED UPON PLANT SPECIES REQUIREMENTS AND PROVIDE IN WRITING TO THE LANDSCAPE ARCHITECT AND OWNER FOR REVIEW AND APPROVAL, ADHERE TO THE APPROVED SCHEDULE UNTIL PLANTS ARE FULLY ESTABLISHED. EQ. EQ. 6. INSTALL PLANTS WITHIN ONE (1) WEEK OF PURCHASE. IF PLANTS ARE TO BE STORED AT THE SITE PRIOR TO PLANTING, IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THEY ARE PROPERLY MAINTAINED, WATERED, AND REMAIN HEALTHY. EQ. 7. PROCEED WITH PLANTING ONLY WHEN EXISTING AND FORECASTED WEATHER CONDITIONS PERMIT. SUBMIT TO THE LANDSCAPE ARCHITECT IN WRITING THE PROPOSED PLANTING SCHEDULE. OBTAIN APPROVAL OF PLANTING SCHEDULE FROM THE LANDSCAPE ARCHITECT PRIOR TO PERFORMING ANY WORK. 8. SEASONS FOR PLANTING: SPRING: DECIDUOUS: APRIL 1 TO JUNE 15 EVERGREEN: APRIL 1 TO JUNE 15 PERENNIALS: APRIL 15 TO JUNE 1 GROUNDCOVERS: APRIL 15 TO JUNE 1 FALL: DECIDUOUS: SEPTEMBER 15 TO NOVEMBER 15 EVERGREEN: SEPTEMBER 15 TO NOVEMBER 15 PERENNIALS: SEPTEMBER 15 TO NOVEMBER 15 GROUNDCOVERS: SEPTEMBER 15 TO NOVEMBER 15 PLANTING SPACING DETAIL BEACH GRASS CULMS: PLANTS WHILE DORMANT FROM OCTOBER 1ST THROUGH APRIL 3OTH 9. PLANTING UNDER FROZEN CONDITIONS IN EITHER THE SPRING OR FALL WILL NOT BE PERMITTED. PLANTING BEFORE OR AFTER THE ABOVE REFERENCED PLANTING DATES WILL INCREASE THE LIKELIHOOD OF PLANT OR GRASS SEED ESTABLISHMENT FAILURE. ANY DEVIATION FROM THE ABOVE REFERENCED PLANTING DATES IS UNDERTAKEN AT SOLE RISK OF THE CONTRACTOR AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ANY ADDITIONAL MAINTENANCE AND WATERING WHICH MAY BE REQUIRED TO ENSURE SATISFACTORY PLANT AND SEED ESTABLISHMENT. 10. FURNISH ONE YEAR MANUFACTURER WARRANTY FOR TREES, PLANTS, AND GROUND COVER AGAINST DEFECTS INCLUDING DEATH AND UNSATISFACTORY GROWTH, EXCEPT FOR DEFECTS RESULTING FROM LACK OF ADEQUATE MAINTENANCE, NEGLECT, OR ABUSE BY OWNER, OR ABNORMAL WEATHER CONDITIONS UNUSUAL FOR WARRANTY PERIOD. THE DATE OF FINAL ACCEPTANCE OF ALL COMPLETED PLANTING WORK ESTABLISHES THE END OF INSTALLATION AND INITIAL MAINTENANCE PERIOD AND THE COMMENCEMENT OF THE GUARANTEE PERIOD. VARIES VARIES 2' TYP 11. INSPECT ALL AREAS TO BE PLANTED OR SEEDED PRIOR TO STARTING ANY LANDSCAPE WORK. REPORT ANY DEFECTS SUCH AS INCORRECT GRADING, INCORRECT SUBGRADE ELEVATIONS OR DRAINAGE PROBLEMS, ETC. TO THE LANDSCAPE ARCHITECT AND ENGINEER PRIOR TO BEGINNING WORK. COMMENCEMENT OF WORK INDICATES ACCEPTANCE OF SUBGRADE AREAS TO BE PLANTED, AND THE LANDSCAPE CONTRACTOR ASSUMES RESPONSIBILITY FOR ALL LANDSCAPE WORK. 12. PROVIDE PROPER PREPARATION OF ALL PROPOSED PLANTED AREAS PER THE NOTES AND SPECIFICATIONS. 13. ALL PLANT LAYOUT AND ACTUAL PLANTING LOCATIONS ARE TO BE FIELD VERIFIED BY LANDSCAPE ARCHITECT PRIOR TO PLANTING. NOTIFY THE LANDSCAPE ARCHITECT AT A MINIMUM OF 48 HOURS IN ADVANCE PRIOR TO SCHEDULING ANY FIELD INSPECTIONS. 14. POTTED PLANTS: REMOVE THE PLANT FROM THE POT AND LOOSEN OR SCORE THE ROOTS BEFORE PLANTING TO PROMOTE OUTWARDS ROOT GROWTH INTO THE SOIL. 15. PLUGS: PLANT UPRIGHT AND NOT AT AN ANGLE. DIG PLANTING HOLES LARGE ENOUGH AND DEEP ENOUGH TO ACCOMMODATE THE ENTIRE ROOT MASS. PLANT PLUGS WITH NO TWISTED OR BALLED ROOTS AND WITH NO ROOTS EXPOSED ABOVE THE GRADE LINE. HAND PACK THE SOIL AROUND THE ENTIRE PLUG ROOT MASS. 16. DIG THE THE PLANTING HOLE TO THE SAME DEPTH AS THE ROOT BALL AND TWO TO THREE TIMES WIDER. SCORE ALL SIDES OF THE HOLE, PLACE THE PLANT IN THE HOLE SO THE TOP OF ROOT BALL IS EVEN WITH SOIL SURFACE. FILL THE HOLE HALFWAY AND THEN ADD WATER ALLOWING IT TO SEEP INTO BACK FILLED MATERIAL. BE SURE TO REMOVE ALL AIR POCKETS FROM BACK FILLED SOIL. DO NOT SPREAD SOIL ON TOP OF THE ROOTBALL. IF SOIL IS EXTREMELY POOR, REPLACE BACK FILL WITH GOOD QUALITY TOP SOIL. AMEND THE SOIL, AS NECESSARY. 17. CREATE A 2" TO 4" BERM AROUND THE EDGE OF PLANTING HOLE WITH REMAINING SOIL TO RETAIN WATER. 18. REMOVE ALL PLANT TAGS AND FLAGS FROM THE PLANTS.