Carleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University

Similar documents
HEALTH SCIENCES BUILDING

178 Carruthers Properties Inc.

HALF MOON BAY CATHOLIC ELEMENTARY SCHOOL SITE PLAN CONTROL DESIGN BRIEF

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc.

770 BRONSON AVENUE. Zoning By-law Amendment and Site Plan Control

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

Urban Design Review Panel Submission. The Ottawa Train Yards - Office Development. 405 Terminal Avenue. 17 April Table of Contents.

Planning Rationale Fernbank Road, Ottawa. Major Zoning By-law Amendment and Site Plan Control Application Ontario Inc.

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report

2136 & 2148 Trafalgar Road Town of Oakville Region of Halton

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

URBAN DESIGN BRIEF New Street Burlington, ON

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

Public Storage Self-storage Facility (Warehouse)

385 Sussex Drive, Ottawa. Application for Minor Zoning By-law Amendment

PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

141 GEORGE STREET PLANNING RATIONALE

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

776 and 784 St. Laurent Boulevard City of Ottawa

Design Brief and Planning Rationale. for Site Plan Control Application. Harmony Subdivision, Stage 1, Block 104

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

URBAN DESIGN BRIEF. Saginaw Subdivision 124 SAGINAW PARKWAY, CAMBRIDGE OCTOBER 2015 OUR FILE 1422A

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

20 & 30 Frank Nighbor Place

Additional Studies: Site Context

Welcome. Walk Around. Talk to Us. Write Down Your Comments

PLANNING JUSTIFICATION REPORT

Urban Design Brief Woodland Cemetery Funeral Home 493 Springbank Drive

Lacolle Way. Planning Rationale. Zoning By-law Amendment Site Plan Control. November 17, 2016

Urban Design Brief Fanshawe Park Road. Competition Toyota

The Corporation of the TOWN OF MILTON

6. REGIONAL AND COMMUNITY FACILITIES DESIGNATIONS 6.1. OBJECTIVES FOR REGIONAL AND COMMUNITY FACILITIES LAND USE DESIGNATIONS

ESTABLISH AN EFFICIENT TOWN CENTER

242 neighborhoods NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR

Queen Street West - Zoning Amendment Application - Preliminary Report

SITE PLAN APPLICATION

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

K. SMART ASSOCIATES LIMITED

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

5.0 Community Design Plan

The West Vaughan Employment Area Secondary Plan Policies

URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO

MINTO COMMUNITIES INC. HARMONY STAGE II 4025 STRANDHERD DRIVE CITY OF OTTAWA

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

10 COPE DRIVE. May 08, 2018 Planning Rationale and Design Brief. Site Plan Control

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions.

MANOTICK MAIN REGIONAL INC. 5721, 5731 AND 5741 MANOTICK MAIN STREET OTTAWA, ON

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

AMEND DMENT H HOSPITAL

implementation r expression in landscape

Royal Thai Embassy Ottawa. Major Zoning Amendment Proposal for 180 Island Park Drive. Planning Rationale

1350 Ellesmere Road and 1560 Brimley Road Zoning Amendment Application - Preliminary Report

PLANNING RATIONALE 3843 INNES ROAD, ORLEANS 78 UNITS CONDOMINIUM PROJECT MELKART DEVELOPMENTS Inc.

Urban Design Brief. 583, 585 and 589 OXFORD STREET EAST. Salt Clinic Canada Inc.

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

LAND USE ASSESSMENT REPORT (LUAR) PROPOSED AFFORDABLE HOUSING COMPLEX MAIN ROAD PDE FILE NUMBER: REZ

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

Portage Parkway Environmental Assessment Public Information Centre No. 1

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville

Planning Rationale in Support of an Application for Zoning By-Law Amendment. 4495, 4499, 4509 & 4515 Innes Road City of Ottawa

URBAN DESIGN BRIEF NORTHVIEW FUNERAL HOME HIGHBURY AVE N, LONDON, ON

Urban Design Brief. Watson Parkway North & Watson Road North Guelph, Ontario. Prepared by Coletara Development

Urban Design Brief. 875 Wellington Road. Proposed One-Storey Fast Food Restaurant and Two-Storey Restaurant. Wellington Harlech Centre Inc.

Analysis of Environs of Clinton Park located at 901 W 5 th Street

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report

2983 NAVAN ROAD ZONING BY-LAW AMENDMENT

Greystone Village Main Street. Terraces at Greystone. City of Ottawa. Planning Rationale

Commercial Development Permit Area

1071 King Street West Zoning Amendment Application - Preliminary Report

Revised Planning Rationale in Support of an Application for Site Plan Control Leitrim Road City of Ottawa

Re: 1110 Fisher Avenue Proposed Residential Development Revised Proposal File D PLANNING RATIONALE ADDENDUM

Welcome to the Oakridge Centre Open House

Errata 1 Landmark Apartments Project Final Environmental Impact Report

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

Report Regarding Site Plan Control for 55 Wellspring Way (File No. SP-06-16)

Mixed-Use Development 1250 Maritime Way

QUEEN-RIVER SECONDARY PLAN

Figure 1- Site Plan Concept

Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning Division. Pg12013 (File No NNY 34 OZ)

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

PLANNING JUSTIFICATION REPORT

Report to: Development Services Committee Report Date: April 24, 2017

Emery Village Road 2A Municipal Class Environmental Assessment Study

Red Fox Commercial Outline Plan

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

Prepared for: Ontario Limited

Complete Neighbourhood Guidelines Review Tool

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Bel-Air Lexus Automobile Service Station

Public Information Centre #1

Bill Leathem Drive. Planning Rationale. Official Plan Amendment / Zoning By-law Amendment / Site Plan Control. May 2, 2016

150 Eighth Street Zoning By-law Amendment Application Preliminary Report

Transcription:

Carleton University Nicol Building New Sprott School of Business Design Brief and Planning Rationale Carleton University Design Team Proposal New Sprott School of Business Academic Building 2019 October 03, 2017

1.0 introduction 03 2.0 site context 2.1 site location 04 2.2 site description 06 2.3 existing land use designations 07 3.0 design statement 3.1 design proposal 08 4.0 planning rationale 15 4.1 provincial policy statement, 2005 15 4.2 city of ottawa official plan 15 4.3 city of ottawa zoning by-law 2008-250 15 5.0 integrated environment review statement 5.1 overview of technical studies 16 5.2 geotechnical investigation 16 5.3 phase i - environmental site assessment 16 5.4 transportation briefn 16 5.5 servicing and stormwater management report 16 5.6 railway traffic noise & vibration study 17

1.0 INTRODUCTION Carleton University proposes the construction of a new academic building to be constructed on campus. The new academic building will be approximately 100,000 square feet enclosed area (80352 square feet Zoning GFA), to house the Sprott School of Business, to be known as Nicol Building. The new development is proposed to be located in the sector designated in the 2016 Campus Master Plan Update as the Academic West Campus, adjacent to future quad on Parking Lot P2 and it spans the tunnel intersection. The proposed development is foreseen within the planning concepts and strategies of the Master Plan. This Planning Rationale has been prepared on behalf of Carleton University to support an application for Site Plan Control for development of this major facility and to demonstrate how the proposed development is in conformance with the following: Carleton University Master Plan City of Ottawa Official Plan City of Ottawa Zoning By-Law Nicol Building 03

design brief and planning rationale 2.0 SITE CONTEXT 2.1 Site Location The site is located on the south perimeter of the Campus on Campus Ave. The site is bordered on the east by Campus Ave., on the south by an internal vehicular and pedestrian driveway with the Future Quad located on the south side of that driveway. On the north the building fronts the Minto C.A.S.E building and to the west the Architecture Building. Site Location 04

2.2 Site Description The new Sprott School of Business is uniquely sited to act as a natural point of attraction and be a pivotal building block in the enhancement of Carleton s Masterplan, and the important development of Carleton s new Entry Quad. The proposed site is located adjacent to Campus avenue on the intersection of east and west campus, spans the three branches of the tunnel system, and is close to a busy drop-off area. These Characteristics provide the potential to act as a node and create a gateway to the academic campus. 05

2.3 Existing Land Use Designations 2.3.1 City of Ottawa Official Plan The site is located within the General Urban Area as shown on Schedule B - Urban Policy Plan. Instituional uses such as post secondary educational facilities are permitted within this designation. In accordance with Annex 5 of the Official Plan, the site does not fall within a Community Design Plan or Policy Plan area. 2.3.2 Secondary Plans and Site Specific Policies There are no Secondary Plans or Site Specific Policies that apply to this site. 2.3.3 Zoning By-Law 2008-250 The subject property is zoned I2A F(1.5) which is a Major Institutional Zone with no height limit. The purpose of the I2-Major Institutional Zone is to: Ensure that major institutional uses such as hospitals, colleges and universities are located at appropriate locations within areas designated as General Urban Area, Central Area and Mixed Use Centre in the Official Plan Ensure that these large scale, high traffic generating institutions locate only on large parcels of land, with direct access to an arterial road and near rapid transit stations Impose regulations which ensure that the size and intensity of these uses is compatible with adjacent uses Permit minor institutional uses and provide for a range of ancillary service uses. Post secondary educational facilities are a permitted use within the provisions of the Zoning By-Law for the I2A Major Institutional Zone. The zone regulations require minimum front, minimum side, minimum rear, minimum corner and a minimum interior side yard setbacks all of 7.5 metres. There is no restriction on lot coverage. 06

3.0 DESIGN STATEMENT 3.1 Design Proposal The new Nicol Building for Sprott School of Business in Carleton University Campus will be a new 6 storey building plus one level below grade connecting to the tunnel system on campus. It will be located on Campus Avenue adjacent to the existing Architecture Building and features a 3 storey central atrium extending from ground floor to the 3rd floor creating a 3-storey interconnected floor space. The first floor is programmed with public spaces. The three storey atrium designed to encourage collaboration, facilitate learning and set the stage for the Sprott School of Business and Carleton. This dynamic core is linking the Ground Floor to the teaching areas on the Second and Third Floors. The second and third floors house the educational spaces i.e classrooms, breakout rooms, and Lecture Theatre. Faculty and student offices are provided on level 4 and 6, and level 5 is a shell space for future development. The new Sprott School of Business at Carleton University is designed to be a jewel in Carleton s Campus, and to continue Carleton s leadership in robust and meaningful sustainability from core to skin. The buidlings concrete structure utilizes innovative bubble deck technology to replace 30% of the concrete mass with air. This mass reduction translates into a 120 ton reduction in CO2 emissions, and further ripple benefits. The skin of the building is marked by a rhythm of ample glass openings modulated by solid fins which project outwards to shade the glare and heat of the sun, while still providing abundant daylight. The 4th floor roof terrace which is the base for the administrative areas above, is designed as a vegetative green roof that provides a connection with nature to the offices above, and significantly mitigates the heat and glare effects of the south sun from reflecting into the offices above. The school s social heart will be a 3-storey embracing hive animated by indirect light from the large roof monitors above; and opening to views of the Ottawa River to the south. The buildings mechanical and electrical systems are precisely tuned to the changing occupancy of the building. Sensors will detect if, and how many inhabitants are in any given space, and in turn will supply a balanced amount of ventilation, cooling, and electric lighting. During the long cold nights of Ottawa s winter, a separate system of radiant hot water will heat the building without need for forced air. The development of this academic building fits the priority basis on which the Master Plan sees future growth occurring. In support of Carleton s Campus Master Plan to create an environmental responsible and sustainable campus, this building will be designed as an energy efficient building and will incorporate intelligent building features. The project will be designed to achieve Green Globe certification and is on target to obtain a level of 4.5 Green Globes, with an overall score of 84%. 07

08

design brief and planning rationale Nicol Building and Future Entry Quad Nicol Building - Campus Avenue View Looking South 09

design brief and planning rationale Nicol Building - Campus Avenue View Looking North Nicol Building - three storey Atrium 10

4.0 PLANNING RATIONALE 4.1 Provincial Policy Statement, 2005 All decisions affecting land use planning are required by the Planning Act, 1990, s. 3(a) to be consistent with the Provincial Policy Statement. This development proposal conforms to requirements of the Provincial Policy Statement by: efficient use of infrastructures and public services that are available or planned within the settlement area of the City of Ottawa s urban boundary; utilizing existing municipal water supply, sanitary and storm sewers; promoting a healthy active community through on-site development of pedestrian and cycling pathways; protecting public health and safety through investigation of existing condition of the site and review of its past uses to ensure no natural or human-made hazards are present. 4.2 City of Ottawa Official Plan The site is located within the General Urban Area as shown on Schedule B - Urban Policy Plan. Post secondary education facilities are permitted within this designation. In accordance with Annex 5 of the Official Plan, the site does not fall within a Community Design Plan or Policy Plan area. 4.3 City of Ottawa Zoning By-Law 2008-250 As noted in Section 2 above, the site is zoned I2A F(1.5). Post secondary educational facilities are a permitted use within the provisions of the Zoning By-Law for the I2A Major Institutional Zone. There is no height restriction and the zone regulations require all yards to be at least 7.5 metres from property lines. The proposed new facility is not adjacent to Campus property lines. Part 4 and Schedule 1A of the Zoning By-Law stipulates parking provisions. The zoning requirements for parking spaces are none due to the proximity to public transportation and the Campus is in Area Z. Loading spaces and facilities are provided at designated locations on campus. Vehicular ac -cess to loading, garbage and recycling collection has been provided on the north and the west side of the building. The development as proposed conforms to the requirements of the City of Ottawa Zoning By-Law. 11

5.0 INTEGRATED ENVIRONMENTAL REVIEW STATEMENT 5.1 Overview of Technical Studies Technical studies that have been completed as required for the Site Plan Control Application are included in the submission package and their conclusions are briefly summarized below. Each one is in support of the proposed development. 5.2 Geotechnical Investigation The Geotechnical Investigation was prepared by Paterson Group. and is dated November. The subject site conditions are considered satisfactory for the proposed development. 5.3 Phase I - Environmental Site Assessment The above report was prepared by Paterson Group and is dated February 21, 2017. The purpose of the environmental assessment was to research the past and current use of the site and adjacent properties and identify any environmental concerns with potential to have negatively impacted the subject property. Based on the results of Phase I Environmental Site Assessmen, a Phase II Environmental Site Assessment is not required for the property. 5.4 Transportation Brief A Transportation Brief was prepared by AECOM and is dated April 2017. In summary it was estimated that the building will generate 60 vehicle trips in the morning peak hour and 59 vehicle trips in the afternoon peak hour. These vehicles will access the University at the intersections of Bronson Avenue with University Drive and Colonel By Drive with University Drive. The new trips generated by the development will have little impact on future traffic conditions. Therefore, no mitigation measures are required at the two intersections analysed in this Transportation Brief as a direct result of the new business school 5.5 Servicing and Stormwater Management Report The Servicing and Stormwater Management Report for this development outlines site servicing criteria and civil engineering calculations pertaining to the servicing of the new proposed building can meet all required servicing constrains and associated requirements. 5.6 Railway Traffic Noise & Vibration Study The Railway Traffic Noise & Vibration Study for this development describes a transportation noise & vibration study performed for proposed Nicol Building. The major source of transportation noise is the O-Train LRT line to the east. The report shows that the outdoor noise levels are below ENCG objective noise level and as such, no noise control measures or mitigation is required. Also the report indicates that the vibration from the O-Trian LRT will not be perceptible beyond the southeast corner of the Nicol building along the Campus Avenue sidewalk, at a distance of 35m from the railway. Since the vibration levels are low, ground-borne noise is also expected to be low. 12