FOI REQUEST FNR Ministry of Forests Land and Natural Resource Operations DIRECT AWARDS August 2013

Similar documents
PARTNERS IN RESOURCE MANAGEMENT AND SUSTAINABLE DEVELOPMENT

Turkey Creek Streamway Corridor

THE FUTURE OF THE MCABEE FOSSIL BEDS HERITAGE SITE - Aligning the management of the site with fossil management approaches

Milwaukee River Watershed Fish Passage Program. Making Connections Across Our Watershed

CHAPTER 1 Introduction

CANADIAN DAM ASSOCIATION ASSOCIATION CANADIENNE DES BARRAGES

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Community Conservation Workshop. Lake Placid

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Preface. Erie. Scranton. Allentown. Pittsburgh. Harrisburg. Philadelphia

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

SECTION 9 PUBLIC FORUM DRAFT 5/31/2017 SEVEN YEAR ACTION PLAN

Why Are We Here? Mrs. Farrow protected this land. CCPRC Acquires Property. Funding Appropriated. Structure Stabilization

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

The Rocky Mountain Arsenal and the Northeast Greenway Corridor Project:

1.16 million KM 2 5 States, 2 Provinces Integrated Partnerships with neighboring LCCs, NW and NC Climate Science Centers, PNW

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

Conservation Corridor Base and Thematic Maps

Portage County Parks, Trails and Greenways Plan

National Association of Conservation Districts. Kris Hoellen Vice President, Sustainable Programs The Conservation Fund September 19, 2013

Kenilworth Station Art and Landscape Committee (KSALC) June 25, 2015

SUSTAINABILITY PLAN OTTAWA COUNTY PARKS AND RECREATION COMMISSION FALL 2017

Ecosystem Restoration Business Line Budgeting A Systems Approach

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

2017 Canadian Consulting Engineering Awards

The Planning Partnership Baird + Associates TCI Management Consultants Ltd. Plan B Natural Heritage Wills Consulting Engineers Poulos & Chung Limited

Arlington, Virginia is a worldclass

Working together to leverage limited Funds

Scarborough Waterfront Project

City of Missoula and Missoula County Open Space Planning Open House

Green Infrastructure. NYS Department of Environmental Conservation

10.0 Open Space and Public Realm

Community Conservation Workshop. Saranac River Basin Communities

Heritage Impact Assessment York Road Environmental Design Study City of Guelph, Ontario APPENDIX A FIGURES. Project Number TP115100

5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22

SUN-B11-From Gray to Green; Revitalizing Milwaukee s Industrial Heart

TO BE COMPLETED BY APPLICANT

Greenways as an alternative to traditional infrastructure. Green Infrastructure

alum creek park public workshop January 16, 2014

PUBLIC SPACE/AMENITY PROJECTS

Boeckman Road Extension

River Restoration Practices:

APPENDIX F: EXTERNAL APPROVALS

East to West, North to South: NFPA Resources for Fire Safety

Conservation Corridor Planning and Green Infrastructure Themes

PARKS AND RECREATION

City of Surrey Ecosystem Management Study. Integration of ecological processes with land use

SECTION FOUR: MISSION STATEMENT, GOALS & OBJECTIVES

PRELIMINARY CALCINING TEST WORK OF LIMESTONE FINES FROM WESTERN CANADA LIMESTONE LTD FOR DEVELOPING DESIGN CRITERIA OF A LIME PRODUCTION FACILITY

A Vision for Walnut Creek

Map Development 5/15/2012. New Virginia Modeling Tools

Sustainable Waterfront Redevelopment Case Study: Seattle, Washington. By Nicole Faghin, LEED AP

ROARING FORK RAILROAD CORRIDOR

Blackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014

Port of Seattle Street Vacations Summary April, 2016

Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona

DEVELOPMENT PERMIT SENSITIVE ECOSYSTEMS

HLRD Report. Heritage, Lands & Resources Department. Why is it important to plan? November 2010

Pinellas County Greenways

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

Appendices. Contents. Appendices - Sep 1997 CP-1 AP-1

Conserving Large Landscapes One Highway at a Time

Yellowstone to Yukon Conservation Initiative

BURNT BERRY POND COTTAGE DEVELOPMENT PLAN PHASE II ENVIRONMENTAL ASSESSMENT REGISTRATION

Saranac River Trail Greenway C O N D I T I O N S R E P O R T

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

Esté-tiwilh/Sigurd Creek Conservancy

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

Planning a Development in the District of Summerland

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

CITY OF LONDON COVES ESA CONSERVATION MASTER PLAN COMMUNITY WORKSHOP #1

Parks and Open Space Preservation and Dedication. January 26, 2016 Fort Worth City Council Pre-Council Meeting Randle Harwood and Richard Zavala

At the Heart of the Great Lakes

TERMS OF REFERENCE MALASPINA COMPLEX COASTAL PLAN

The purpose of tonight s PIC is to:

Regional Context Statement

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

Planned Manufacturing District Review

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

2014 South Atlantic LCC

INTRODUCTION Key Issues and Findings Goals, Objectives, and Policies - Natural Resources - Map M18 - Environmental Resources

Pass Creek Riparian Planting Project

Enhancing Ecosystems and Biodiversity. Paul Nolan, Green Infrastructure: Planning for the Liverpool City Region

TOWN OF BETHLEHEM MEETING SUMMARY LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

Green Infrastructure. by Karen Engel, NYS DEC. NYS Department of Environmental Conservation

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Objective: Resolution to recommend adoption of the Big Thompson Assessment to the Planning Commission

INTRODUCING THE BALTIMORE CITY GREEN NETWORK VISION PLAN

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan

Pungo/Blackwater Planning Area

PUBLIC ART CALL LIONS GATE COMMUNITY CENTRE. For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive)

Oakland County s Green Infrastructure Vision. L. Brooks Patterson Oakland County Executive

VDOT Tunnel Facilities Action Plan

TOWN OF ESSEX VERMONT

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation

Restoring Water Ecosystems in NYC Parks

Transcription:

FOI REQUEST FNR 2013 00295 Ministry of Forests Land and Natural Resource Operations DIRECT AWARDS August 2013 Name of Contractor AVISON MANAGEMENT SERVICES LTD. 24,000 Dollar Amount of Contract Description of Services Rationale for Direct Award Ecosystem restoration treatment Evaluation ILLIDGE DRILLING & CONTRACTING LTD. 2,000 ENDCS906 Illidge Drilling D. KENDALL & SON CONTRACTING LTD. 183,500 District of Haida Gwaii Engineering Capital Project 71HA201 and Land Based Investment Funding Fish Passage M.C. WRIGHT AND ASSOCIATES LTD. 47,395 Habitat bank remediation Burman BOLSTER CONSULTING LTD. 10,000 LUNDY, DORIS 12,500 Develop revenue sharing summary sheets for the FCRSA program Completing quality assurance and data entry of Archeological Site Inventory IRC BUILDING SCIENCES GROUP BC INC. 3,400 Kiln structural assessment Page 1

VIKING FIRE PROTECTION INC. 1,830 Installation of Fire Safety valve GRAY WIKSTEN, BARBARA 20,000 ATLANTIC INDUSTRIES LIMITED 185,126 GeoBc Atlas Project management support Corrugated steel arch plus anchor assembly, wire mesh forms, wire struts DECKER, LINDA IRENE 2,000 GKMA brochure, Create the brochure showing symbols and label the featured trails with specified coding adding topographical features AMEC ENVIRONMENT & INFRASTRUCTURE THE BRITISH COLUMBIA CONSERVATION FOUNDATION 24,900 Archeological overview assessment 10,000 Spin Lake trout GOODBYE GRAFFITI BURNABY & THE NORTH SHORE THOMPSON RIVERS UNIVERSITY 6,500 2,549 GasWorks vegetation removal Field work at he McAbee Fossil Beds Heritage Site A competitive process would interfere with a ministry's ability to maintain security or order to protect human, animal or plant life or health. Page 2

REGIONAL DISTRICT OF NORTH OKANAGAN SKERMER, NIGEL ANTHONY KISPIOX BAND COUNCIL CELTIC ENGINEERING LTD. 3,200 ASSOCIATED ENGINEERING (B.C.) LTD. GRIEG SEAFOOD B.C. LTD. 25,000 ALLNORTH CONSULTANTS LIMITED TSAYTA TRUCKING LTD. H M C SERVICES INC. 25,000 INDIAN GARDENS RANCH LTD. STONE INDIAN BAND 6,552 5,016 Cyphocleonus Collections and shipping 4,600 Tunnel Dam 11,466 KISPIOX BAND COUNCIL Walker Road bridge removal and road deactivation 2,000 Structural analysis Habitat bank monitoring Burman River area 15,000 Adolf East design and project monitor 15,000 Trucking Carol Byers GRADING OF SLEDHALLA FSR AND OTHER REC FSRS 7,000 Equipment Rental agreement Mistletoe eradication, spacing Williams Lake timber supply area Page 3

Restructuring the FREP Extension Note #28 Temporary access structures: Consideration for site plans and post THOMPSON, STEPHEN ROBERT 350 harvest assessments HUTCHCROFT, DAVID A 13,125 ECOLOGIC RESEARCH 3,000 Completing the quality assurance of archeological reports Management Plan for Grey Wolf in British Columbia Final Edit AURORA WILDLIFE RESEARCH 3,000 Flathead Mountain Goat Inventory 2013 MCINTOSH, TERRY TURNER 5,000 GYUG, LESLIE W 2,500 PROVIDE PLANT LISTS FROM NATURE TRUST GF PROPERTIES JOHNSTONE CREEK ECOSYSTEM RESTORATION Provide treatment and follow up REGIONAL DISTRICT OF KOOTENAY monitoring of invasive plant species BOUNDARY 4,050 along the C & W Rail Trail Corridor Provide treatment and follow up CENTRAL KOOTENAY INVASIVE PLANT monitoring of invasive plant species COMMITTEE 1,665 along the C & W Rail Trail Corridor Rec Site Maint at Gething Ck, Carbon Lk CANADIAN FOREST PRODUCTS LTD. 3,000 & Wright Lk FY 13/14 MULTIPHASE TIMBER SALE LICENCE DEVELOPMENT VARIOUS WMI WOODS MANAGEMENT INC. 25,000 LOCATIONS QUESNEL TSA Page 4

Goshawk Survey & Assess & RP Bio VAST RESOURCE SOLUTIONS INC. 3,600 Work Page 5