Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Similar documents
Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey

PLANNING COMMITTEE. 14 October 2014

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA.

3 Abbey View Mill Hill London NW7 4PB

Reference: 15/06961/RCU Received: 13th November 2015 Accepted: 17th November 2015 Ward: Coppetts Expiry 12th January 2016

an Inspector appointed by the Secretary of State for Communities and Local Government

Mr & Mrs Connolly per Pump House Designs Pump House Yard The Green SEDLESCOMBE, East Sussex. TN33 0QA

DELEGATED DECISION on 1st September 2015

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012.

PARISH / WARD: Peacehaven / Peacehaven East PROPOSAL:

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

PLANNING COMMITTEE 15 September 2015

Report Author/Case Officer: Joanne Horner Contact Details:

Ward: West Wittering. Proposal Change of use from public highway pavement to residential garden use.

3 Tretawn Gardens London NW7 4NP

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1

PLANNING COMMITTEE REPORT

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

Reference: 16/1234/HSE Received: 25th February 2016 Accepted: 2nd March 2016 Ward: High Barnet Expiry 27th April 2016

49 Broughton Avenue London N3 3EN

CA//17/02777/FUL. Scale 1:1,250. Planning Services Canterbury City Council Military Road Canterbury Kent CT1 1YW

18 Birkbeck Road London NW7 4AA. Reference: 15/02994/HSE Received: 14th May 2015 Accepted: 26th May 2015 Ward: Mill Hill Expiry 21st July 2015

25 Clarry Drive, Sutton Coldfield, Birmingham, B74 2QT

REFERENCE: B/00601/12 Received: 11 February 2012 Accepted: 21 February 2012 WARD(S): High Barnet Expiry: 17 April 2012

Application Recommended for Approval Hapton with Park Ward

DEVELOPMENT MANAGEMENT REPORT

2014/0943 Reg Date 06/11/2014 Lightwater

6B Bertram Road London NW4 3PN

Final Revisions: Provision of single storey modular classroom and associated works.

St Michaels C of E Junior & Infant School, Nantmel Grove, Bartley Green, Birmingham, B32 3JS

Ground Floor Flat 15 Redbourne Avenue London N3 2BP

Derry City and Strabane District Council Planning Committee Report

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION)

Garages To Rear Of The Willows 1025 High Road London N20 0QE

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director. Linton. Yes

Land at the Junction of White Farm Road & Harrison Road, Four Oaks, Sutton Coldfield, B74 4LQ

Report Author/Case Officer: Paul Keen Senior Planning Officer (Dev Control) Contact Details:

26 September 2014 CONSULTATION EXPIRY : APPLICATION EXPIRY : 22 July 2014 SUMMARY RECOMMENDATION: PERMISSION

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

Demolition of existing dwelling and erection of 4 no. detached dwellings, including new service road, car parking and landscaping.

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

1. Listed Building and Conservation Area considerations 2. Protection of Known Archaeological Remains 3. Parking

Final Revisions: Reason: For the avoidance of doubt and in the interests of proper planning.

PLANNING COMMITTEE AGENDA 23 rd March 2017

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

Construction of 9 dwellings and associated infrastructure.

Stanryck House, 38 Totteridge Village, London, N20 8JN

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

PART 2 SOUTH DOWNS NATIONAL PARK AUTHORITY SECTION 1 SCHEDULE OF APPLICATION RECOMMENDATIONS

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley

St Marys Church Of England High School Downage London NW4 1AB

2015/0291 Reg Date 13/04/2015 Parkside

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

APPLICATION ITEM LW/17/0325 NUMBER: NUMBER: 8 APPLICANTS. PARISH / Peacehaven / P L Projects NAME(S):

LONDON BOROUGH OF WALTHAM FOREST

Land at Weather Oaks, Harborne, Birmingham, B17 9DD. Erection of 11 new dwellings and associated infrastructure, parking and landscaping

Canterbury City Council Military Road Canterbury Kent CT1 1YW. Title: CA/16/02745/ADV. Author: Planning and Regeneration.

Land off Nursery Road / Church Street, Lozells, Birmingham, B19. Erection of 5 no. dwellings and retention of area of public open space.

14A Moor Hall Drive, Sutton Coldfield, Birmingham, B75 6LP

Tennis Court Rear Of 3-5 Corringway London NW11 7ED

Brookside Walk Children's Play Area, London, NW4

Derry City and Strabane District Council Planning Committee Report

PLANNING COMMITTEE REPORT

Outh SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Joint Director for Planning and Economic Development S/0179/18/OL. Histon. Approval.

INTRODUCTION CURRENT APPLICATION

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

DEMOLITION OF EXISTING BUNGALOW AND REPLACEMENT BUNGALOW. Ms Sukhi Dhadwar

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS

Cllr Jamieson called the application to committee on grounds of style of houses. DETERMINE RECOMMENDED Full Application - Granted

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

2014/0590 Reg Date 26/06/2014 Chobham

Rev John Withy, Sion House, 120 Melmount Road, Sion Mills

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Committee Report. Case Officer: Gemma Walker. Ward: Bacton & Old Newton. Ward Member/s: Cllr Jill Wilshaw.

+ Cllr Ken Pedder - Chairman + Cllr Cathie Whitcroft - Vice-Chairman

Derry City and Strabane District Council Planning Committee Report

MINUTES OF THE PLANNING COMMITTEE MEETING HELD MONDAY 19 TH JANUARY PM BURBAGE MILLENNIUM HALL

37 NAGS HEAD LANE BRENTWOOD ESSEX CM14 5NL

Sutton Coldfield Conservative Club, 138 Jockey Road, Sutton Coldfield, Birmingham, B73 5DF

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Ward: Southbourne. White Croft 14 Breach Avenue Southbourne West Sussex PO10 8NB

It is recommended that the Committee resolve to APPROVE the application and grant planning permission subject to the following conditions:

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Test Valley Borough Council Southern Area Planning Committee 8 January 2019

Southend-on-Sea Borough Council Department for Place! Peter Geraghty Head of Planning & Transport

an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 13 February 2018

Committee Date: 19/03/2015 Application Number: 2014/06414/PA Accepted: 06/01/2015 Application Type: Full Planning Target Date: 03/03/2015

Site off Hattersley Road West (bound by Hattersley Road West to the north west and Sandy Bank Avenue to the south and west), Hattersley

Applicant s partner is an employee of the Council COMMITTEE TO DETERMINE

Borough of Poole. Planning Committee. List of Planning Applications

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

PLANNING COMMITTEE SCHEDULE ITEM: 05

PHASE III: Reserved Matters Submission

UTT/16/1466/DFO GREAT DUNMOW MAJOR

PLANNING COMMITTEE REPORT

Transcription:

138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1 to 9 9to10 11 to 16 47 5 to 8 Ordnance Survey, (c) Crown Copyright 2015. All rights reserved. Licence number 100022432 Site Location Plan Project Title Land on the North West of Epsom Road Waddon Croydon Scale Date 1 : 1250 @ A4 September 2015

PLANNING COMMITTEE AGENDA 15 December 2016 PART 7: Planning Applications for Decision Item 7.4 1 APPLICATION DETAILS Ref: 16/03965/P (Link to related documents on the Planning Register) Location: Electricity Substation and Land Adjoining 154 Epsom Road, Croydon, CR0 4UP Ward: Waddon Description: Demolition of electricity substation; erection of three storey building with accommodation in roofspace comprising 5 one bedroom flats Drawing Nos: Site Location Plan, Drawing Numbers 15/371/04 Rev D and 15/371/05 Rev C. Applicant: Mr Robinson Agent: Mr Robinson Case Officer: Samantha Dixon 1.1 This application is being reported to committee because the ward councillor (Cllr Andrew Pelling) made representations in accordance with the Committee Consideration Criteria and requested committee consideration. 2 SUMMARY OF KEY REASONS FOR RECOMMENDATION 2.1 The principle of the development is acceptable 2.2 The application has been amended to ensure the development would not significantly impact on the highway network, safety, traffic generation or parking 2.3 The proposed development would not have a detrimental impact on the visual amenities of the area. 2.4 The development would not have a detrimental impact on the amenity of the neighbouring residents 2.5 The development would provide an acceptable standard of living for future occupants 3 RECOMMENDATION 3.1 That the Committee resolve to GRANT planning permission. 3.2 That the Director of Planning and Strategic Transport is delegated authority to issue the planning permission and impose conditions and informatives to secure the following matters: Conditions 1) In accordance with submitted drawings 2) Details of materials to be submitted and approved 3) Landscaping scheme to be submitted and approved 4) Development should be carried out in accordance with Tree Protection Plan 5) No obstruction of highway 6) Cycle storage as shown on plans and retained

7) Approval of Demolition/Construction Logistic Plan 8) Water efficiency 9) 19% CO2 reduction 10) Accordance with mitigation outlined in Noise Assessment 11) Contaminated land assessment to be submitted and approved 12) Future maintenance strategy to be submitted to and approved 13) Development to commence within 3 years 14) Any other planning condition(s) considered necessary by the Director of Planning and Strategic Transport Informatives 1) Removal of site notices 2) Community Infrastructure Levy (CIL) Granted 3) Code of Practice on Construction Sites Control of Pollution and Noise from Demolition and Construction Sites and The Control of dust and emissions from construction and demolition. 4) Consultation with Network Rail 5) Requirement for Highway Licence 6) Any other informatives considered necessary by the Director of Planning and Strategic Transport 4 PROPOSAL AND LOCATION DETAILS Proposal 4.1 As originally submitted, planning permission was sought for the demolition of the existing substation and the erection of a two-storey building with accommodation in the roof space to provide 6 x one bedroom flats. The building had a mostly rectangular form with an appearance to mirror those to the south west. 4.2 Transport for London (TfL) objected to the originally submitted scheme as it would conflict with plans for future road widening and improvement works at the fiveways junction. The applicant has therefore amended the scheme to set the development further back within the site. 4.3 The proposal has been increased in height to three-storeys with accommodation in the roofspace. Five x 1 bedroom units are now proposed, one of the units comprising accommodation over two levels. The building would have maximum dimensions of 15.5m in width, 8.5m in depth with an eaves height of 8m and ridge height of 12m. Dormer windows would be inserted in the front and rear roof slopes. A bin store and cycle store would be located at ground floor level within the envelope of the building. Site and Surroundings 4.4 The application relates to a disused electricity substation located to the north west side of Epsom Road. The building is rectangular in shape with a wholly utilitarian appearance. It sits on an almost rectangular block with an area of 230sqm which is bound by metal security fencing. 4.5 The site backs onto a railway line and Waddon Station is located approximately 100 metres to the south west. Immediately to the south west of the site are two blocks of flats which are two-storey with accommodation in the roof space. The Waddon public

house is located opposite the site and there are three storey buildings on Stafford Road to the east which comprise commercial uses at ground floor level with residential units above. 4.6 The site is located in an Archaeological Priority Zone. There are no land use designations for the site identified on the Croydon Local Plan Policies Map. Epsom Road is a one-way street which leads to Purley Way. This area forms part of the wider fiveways junction. Planning History 4.7 None relevant 5 CONSULTATION RESPONSE 5.1 Historic England: No archaeological requirement. Having considered the proposals with reference to information held in the Greater London Historic Environment Record and/or made available in connection with this application, the proposal is unlikely to have a significant effect on heritage assets of archaeological interest. The application site is located within an archaeological priority area, however the development poses a limited archaeological risk. No further assessment or conditions are therefore necessary. 5.2 Transport for London (TfL): As originally submitted, given that the proposal would impact on the delivery of the TfL / London Borough of Croydon Fiveways Scheme, TfL would need to object if the application is not amended. There would be no footway available on the northern side of Epsom Road if the proposal goes through. TfL therefore requires at least 1.6m of the land within the substation boundary to facilitate the delivery of the Fiveways Scheme. In response to the amended scheme: TfL is satisfied with the plans provided. The latest plans (15-371-04 rev. Proposed Site Plan and 15-371-05 rev. Proposed plans and Elevations) show that TfL would be able to accommodate a 1.6m footpath from the building line, which is acceptable. TfL requests conditions to ensure no part of the works impinge on or obstruct the public highway. 5.3 Network Rail: Has provided comment with regard to requirements concerning future maintenance, drainage and construction. A condition should be added to any permission to encourage the development to contact Network Rail to secure protection measures prior to development. 5.4 The views of the Planning Service are expressed in the MATERIAL PLANNING CONSIDERATIONS section below. 6 LOCAL REPRESENTATION 6.1 The application has been publicised by way of one or more site notices displayed in the vicinity of the application site. The number of representations received from neighbours, local groups etc in response to notification and publicity of the application were as follows: No of individual responses: 0 Objecting: 0 Supporting: 0 Comment: 0 6.2 The following Councillor made representations:

Councillor Andrew Pelling [objecting] 6.3 The following issues were raised in representations that are material to the determination of the application, and they are addressed in substance in the next section of this report: Objections With a further public consultation due on TfL proposals it would be unwise not to reserve the land at this site for road widening. 7 MATERIAL PLANNING CONSIDERATIONS 7.1 The main planning issues raised by the application that the committee must consider are: 1. The principle of development 2. Impact on highway network 3. Impact on the character of the area 4. Impact on trees 5. Impact on the residential amenities of the adjacent occupiers 6. Living conditions of future occupiers 7. Other matters Principle of development 7.2 Croydon Local Plan Strategic Policy SP2.1 applies a presumption in favour of development of new homes. The Croydon Plan (UDP) Saved Policy H2 states that housing development will be permitted within the existing built-up area provided it does not conflict with the Council s aim of respecting the character of residential areas and there is no loss of other protected uses. The site is located within an established residential area and the substation is not in use. There is no objection to the principle of the development subject to consideration of all other material planning matters as discussed below. Impact on the Highway network 7.3 The site of the proposed development is on A232 Epsom Road, which forms part of the Transport for London Road Network (TLRN). TfL is the highway authority for the TLRN. TfL is working with the Greater London Authority and Croydon Council to develop a scheme that aims to improve journey times along the A23 corridor by improving facilities and capacity at Fiveways and on the A232. The preferred option includes widening Epsom Road to allow two-way traffic and improve cycling facilities and the pedestrian environment. 7.4 As originally submitted the proposed development would impact on the road improvement scheme as there would be no footway available on the northern side of Epsom Road. In a wider context, TfL also raised concern about the degradation of footway width in the vicinity considering other potential development sites coming forward to the north of the junction. It is estimated that footfall in the area will increase, particularly to and from Waddon Station which would put more pressure on these sections of footway. This would ultimately conflict with the objectives of the

Fiveways Scheme to improve the public realm and pedestrian environment in the area. 7.5 The applicant has subsequently amended the scheme to show the development set back 1.6m so that the front element is given over to become part of the public footpath. TfL have fully reviewed the amended plans and have withdrawn their objection to the proposal. They require conditions to be imposed on any permission to ensure that no part of the development obstructs the highway. 7.6 The site is located within an area with a public transport accessibility level (PTAL) rating level of 3 which is considered to have moderate access to local transport links. The site is located approximately 100m from Waddon train station, there are a number of bus stops in close proximity and there is a large supermarket and a number of public services and facilities within easy walking distance. 7.7 Policy SP8.17 seeks to ensure that there is an appropriate level of car parking and the London Plan Policy 6.13 sets out maximum parking standards for new residential development, requiring developments with 1-2 bedrooms to have less than 1 space per unit. All development in areas of good public transport accessibility should aim for significantly less than 1 space per unit. This is proposed to be a car free scheme as per the residential units immediately to the south west. Given the accessibility of the site to public transport and the proximity to public facilities, a car-free scheme is appropriate in this location. 7.8 A cycle storage area is shown to be located within the ground floor of the development, accessed through the building. 7.9 Refuse storage would also be located within the building with access to the frontage whereby refuse could easily be collected from the highway. Impact on the character of the area 7.10 The London Plan 2015 (Consolidated with Alterations since 2011) Policy 3.5 requires the design of all new housing developments to enhance the quality of local places, taking into account physical context; local character; density; tenure and land use mix. Policies 7.4 and 7.6 indicate that development should make a positive contribution to local character and should incorporate high quality materials that are appropriate to its context. Policies SP1.2, SP4.1 and SP4.2 of the Croydon Local Plan: Strategic Policies (2013) require all new development to be of a high quality that contributes to enhancing a sense of place and improving the character of the area. Policies UD2 and UD3 of the Croydon Plan (2006) Saved Policies 2013 state that development proposals should reinforce and respect existing development patterns, plots and building frontage widths, heights and proportions of surrounding buildings. 7.11 There is no objection to the demolition of the existing utilitarian structure which does not enhance the appearance of the street scene. 7.12 The proposed building is one storey higher than the residential blocks to the south west. The Waddon public house is three-storey in part and the properties to the south east side of Stafford Road comprise three-storeys with pitched roofs over. Given the varied scales and appearances of the adjacent buildings, a development of the proposed height is appropriate in this location.

7.13 Given the constraints of the site, the proposed building has a simplistic rectangular form with a narrow depth. Its vertical appearance is broken up by alteration in the material of the third floor and individually placed rendered elements. The main materials of brick and hanging tile to the elevations under a concrete tiled roof is reflective of development in the area. The roof dormers are subservient within the roof slopes and reflect the dormers in the adjacent buildings. 7.14 Overall, the proposal would cause no harm to the character or appearance of the area. Impact on trees 7.15 There are a group of mature sycamore trees to the north east of the site which as a group are prominent and enhance the appearance of the street scene. A Phase II Arboricultural Impact Assessment has been undertaken which show that limited pruning would be required and with protection measures, the development would not harm the health of the trees. Any permission would be conditioned to ensure the protection measures outlined in the report are adhered to. The Council s Tree Officer has no arboricultural objection. Impact on the residential amenities of the adjacent properties 7.16 London Plan Policy 7.6 states that buildings and structures should not cause unacceptable harm to the amenity of surrounding land and buildings, particularly residential buildings, in relation to privacy, overshadowing, wind and microclimate. Croydon Plan Saved Policy UD8 states that development proposals should not harm the residential amenity of adjoining occupiers. 7.17 The proposed building would be located 5.7m from the residential building to the south west. This building contains five flats over three-storeys. There are no windows in its side elevation facing the site. Given the orientation of the buildings and the positioning of the new building, the proposal would cause no loss of light or outlook to the adjacent block. There are no windows proposed in the side elevation and the balconies in the rear are located so that they would cause no loss of privacy. 7.18 To the rear of the site is a railway line which commercial uses beyond. To the north east of the site there is a gap of 30m from the nearest property. Opposite the site is a public house and roadway junction. 7.19 The proposal will have no harmful impact on the amenities of any adjacent residential properties. Living conditions of future occupiers 7.20 Policy SP2.6 requires that all new homes meet the needs of the residents over a lifetime by achieving the minimum standards set out in the Mayor of London s Housing Supplementary Planning Guidance. The Nationally Described Space Standards (NDSS) provide minimum technical space standards for new dwellings in terms of the internal amenity space. All of the proposed units meet the minimum required internal space standard. 7.21 With regard to external amenity space, the London Housing SPG states that a minimum of 5sqm of private outdoor space should be provided for 1-2 person

dwellings. UDP Policy UD8 requires development proposals to provide residential amenity space to be considered as an integral part of the design of the overall development concept. Each unit has a separate balcony/amenity space which accord with the required space standard. 7.22 The site is located adjacent to a busy road junction and backs onto a railway line. A Noise Impact Assessment has been undertaken which concludes that acceptable internal noise standards can be achieved provided mitigation is implemented in the form of acoustic double glazing and trickle or through-wall vents. The Council s Pollution Team recommends that these recommendations are adhered to and this can be secured by condition. Other Planning Issues 7.23 The applicant has submitted an Energy and Sustainability Statement which outlines that sustainable design and energy management measures have been incorporated to meet the requirements of Policy SP6 and better the current (2013) Part L Building Regulations standard by 19%. The proposed energy strategy is based on utilising passive design measures, super insulated and air tight building fabric, and a high efficiency gas fuelled boiler heating system with flue gas heat recovery. In addition, the development will include the installation of Photovoltaic Panels for the provision of supplementary renewable energy generation such that a significant reduction in CO2 emissions is achieved through renewable technology. 7.24 Having looked closely at the building, there are no visible roof features that would allow bats to access or inhabit the building. The entire site is covered in hardstanding and the only vegetation is scrub and weeds. The site has no obvious ecological presence and as such in this instance is it not considered that there is need for an ecological survey. 7.25 Network Rail have provided advice to the applicant with regard to construction, drainage and future maintenance of the building given the close proximity to Network Rail land. The applicant has confirmed that any future maintenance works could be carried out within the application site and have incorporated scaffold anchor points into the face of the rear elevation to ensure this. Network Rail has requested an informative be placed on any permission to ensure the developer agree an Asset Protection Agreement with Network Rail prior to the commencement of any development on site. 7.26 Community Infrastructure Levy The development would be CIL liable. Conclusions 7.27 All other relevant policies and considerations, including equalities, have been taken into account. Planning permission should be granted for the reasons set out above. The details of the decision are set out in the RECOMMENDATION.