Visual Alarm Devices. Presented prepared by Chris Orr

Similar documents
Visual Alarm Devices - VADs. A pocket guide to planning, design, installation, commissioning and maintenance of VADs for Fire Warning.

Evacuate everyone Sonos Pulse & Nexus Pulse

Fire Systems Design Pocket Guide BS 5839 Part 1:2017 and CoP 0001 for Visual Alarm Devices. Fire Installers Mate. A guide to fire system design

EN54 Part 23 Made Easy CPD PRESENTED BY SIMON ADAMS GENT BY HONEYWELL

Notifier by Honeywell: Non-Addressable Audible & Visual Alarm Devices. Approved to EN54-3/EN54-23

CONVENTIONAL AUDIBLE VISUAL

Are you ready for EN 54-23? New requirements for fire alarm systems from 1 January 2014

Developments in Australian Standard AS (Emergency Lighting)

Information Bulletin

Addressable Loop Powered Visual Alarm Devices

Baseline Data Required for AS

A COMPARISON OF FIRE ALARM SYSTEM REQUIREMENTS IN THE US AND UK. James R. Lugar Jr., P.E. Rolf Jensen & Associates, Inc. SFPE 2012 Savannah, GA

A Guide To BS Understanding the selection, spacing and siting of detectors

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety

AS 1851:2012 The Use and Adoption of the New Standard The impacts and challenges for the fire protection and property management industries.

The Use of Public Address System to Improve Tunnel Safety - Current Practices. Lim Hock Tay

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

2004 AUSTRALIAN STANDARDS UPDATE

VERIFICATION OF FIRE ALARM SYSTEMS

Client Advisory Note June 2015:

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Pocket guide to. Fire Alarm Systems Design BS Standard

EN54-23 Beacons & Sounder Beacons

3.1 Introduction. 3.1 Introduction

Changes in NFPA

SOUTH AFRICAN NATIONAL STANDARD

LIFE SAFETY & FIRE PREVENTION MANAGEMENT PLAN

BUILDING CODE ACCESS CONSULTING ESSENTIAL SERVICES

Alarm Signalling Equipment: Connection Requirements (Victoria) TAN 06. Technical Advisory Note. Version 1 October 2018

Evacuation Tragedies Do Happen Kaprun Scandinavian Star Manchester Dusseldorf Airport Kings Cross

Addressable Fire Alarm Devices Superior Technology for the Highest Protection

TECHNICAL BULLETIN No: 0040

Intelligent Security & Fire Ltd

The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex:

FIRE ALARM AUDIBILITY IN EXISTING RESIDENTIAL OCCUPANCIES

NFPA 72 Code Changes vs 2013

Fact File 75. Published Document PD CEN/TS 54-32:2015 Fire detection and fire alarm systems

Design Considerations of LED based Visible Notification Appliance SUPDET 2015

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

USER MANUAL FOR OPERATING SYSTEM

ISO INTERNATIONAL STANDARD

PQS Independent type-testing protocol

Consultant Specification AGILE Wireless Fire Detection System

AP200 SERIES INTELLIGENT ALARM DEVICES

FR-A180 FR-A360. Occupancy detector. Use

Sonos-SB Siren/Beacon

BS 5839: Part THE CHANGES

Guidance on Video Smoke Detection Technology (VSD)

INTELLIGENT FIRE TECHNOLOGY. Twinflex and Multipoint V3. User Guide (TO BE RETAINED BY USER) Issue 3

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

PRIMATECH WHITE PAPER CHANGES IN THE SECOND EDITION OF IEC 61511: A PROCESS SAFETY PERSPECTIVE

Design Considerations of LED based Visible Notification Appliances. Johnny K. W. Siu, Ph.D. - Light Engine Limited I. INTRODUCTION

Handout Notes Major changes in BS : 2016

Motion Controlled Apartment Building Corridor Lighting

Scope of Section 2. AS vs. Application Issues. Schedules & Log- Contents. Books

The EN54 Part 2 and 4 Fire System

Water Heating UK 14 th May 2016

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

The 2013 National Fire Alarm and Signaling Code

National Unit Specification: General Information

Fire Protection, Inspection and Testing Qualifications Forums. Jeremy Rose (Artibus Innovation) Chris Wyborn (FPA Australia)

Fire Alarm Intelligibility. Chris Nolan

TECHNICAL SPECIFICATION

Opal TM AV Devices. Data Sheet. Benefits

The EN54 Part 2 & 4 Fire System

Highway Oriented Commercial Development Criteria

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Why Selective Coordination is Mandatory -- It Fills the Reliability Hole --

Draft for Comment Please comments to Part A(i)

Contents of ANSI/AAMI HE75:2009 Page

Chapter 7. Communication Elements and Features

MARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

LICENCE. for. Click on the red box above to activate the Licence Agreement scroll bar.

UNOFFICIAL COPY OF SENATE BILL 464 A BILL ENTITLED

FIRE SAFETY INSPECTION REPORT

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Fire detection and alarm

ISO INTERNATIONAL STANDARD. Earth-moving machinery Hazard detection systems and visual aids Performance requirements and tests

Technical reference Reference & design

FIRE ALARM SYSTEMS - UCL GENERAL INSTALLATION DESIGN GUIDANCE & EMPLOYERS REQUIREMENTS (Student Halls of Residences & Sleeping Accommodation)

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

XP95 Sounder VAD Base

7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.

FireClass Addressable Fire Alarm Device Series

Compilation of regulatory approaches used in various countries. Information received by the Secretariat through a survey in 2009

New Fire Safety Order

Firefighting operations on fire control centres F5-09 GD

Interim Amendments to Ontario s 2012 Building Code Retirement Homes. August 17, 2017

SELF PRESERVATION SOCIETY By Jim Creak

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

STUDIO ONE PORTFOLIO KIEFER SAVAGE HOUSE VI: VIEWING PLATFORM: DRONE HOUSE:

Variable Refrigerant Flow (VRF) Systems

INTERNATIONAL STANDARD

FIRE SAFETY INSPECTION REPORT

11:00 to 12:00 Secrets to achieving code-compliant strobe installations. Ralph Coco, Potter Canada Paul Jewett, Mircom Group of Companies

Mounting bezel Retaining spring. Detects movement within the detection range, allowing load control in response to changes in room occupancy.

UNOFFICIAL COPY OF HOUSE BILL 1406 A BILL ENTITLED

FIRE SAFETY INSPECTION REPORT

FIRE ALARM AUDIBILITY IN EXISTING RESIDENTIAL OCCUPANCIES. 1 of 7 11/12/ :26 PM

Page 1 of 16 FLASH PUSLE WIDTH EFFECTIVENESS IN NOTIFICATION APPLIANCES

Transcription:

Visual Alarm Devices Presented prepared by Chris Orr

Visual Alarm Devices The new standard AS7240.23 is based on EN54-23/ISO 7240.23 New Clause 3.22 (b) (xvi)&(xvii) introduces the requirements for VADs Areas designated for persons with hearing impairment Areas of high ambient noise Where reverberation time exceeds 1.50s Where hearing protection is warn Where audible warning is not provided Where speech intelligibility cannot be achieved 2

Visual Alarm Devices Whatever the position of the individual in relation to the VAD, he/she must see the flash off surfaces (Direct/Indirect) Visual Alarm Device performance has been previously poorly specified. The use of Joules, Watts and Candela to specify a VADs performance does not take into account the effectiveness of the visual signal over a given area. 3

Visual Alarm Devices AS7240.23 does not measure the brightness of the beacon but the illuminance off a surface (Lux=lumens/m²) Based on research the minimum required illumination off a surface to attract attention is 0.4 LUX. This provides an easy way to specify performance Accessible Areas?? The old approach of If I can see it, it must be OK no longer applies 4

Visual Alarm Devices VADs are rated for volume of coverage that provides the required illumination on all surfaces. The rating of a VAD provides a defined area of coverage for the specific VAD making the design process much easier and with a know illumination outcome. Two types of beacon are acceptable as a visual alarm device: Xenon & LED Rotating types are not allowable under the Standard. 5

Visual Alarm Devices Three categories of devices are defined, ceiling mounted, wall mounted, and an open category. Consult the manufacturer s data At a given mounting height, the coverage area of a VAD is defined by the diameter (ceiling mount) or width (wall mount) of the coverage, given in metres. 6

Visual Alarm Devices Ceiling Mount Devices C-x-y x The maximum mounting height (3, 6 or 9 m) y The diameter is the cylindrical volume covered. Eg: C-3-15 corresponds to a ceiling-mounted device giving a coverage cylindrical diameter of 15 m, when mounted at 3 m height. To convert the coverage diameter y to the width of a square room = y / 1.414 m (15m = 10.6m) 7

Visual Alarm Devices Wall Mounted Devices W-x-y x The maximum mounting height (Minimum value of 2.4m) y The width of the Square volume covered at a height x Eg: W-2.4-7.5 corresponds to a wall-mounted device giving a coverage cuboid volume of 2.4 m x 7.5 m x 7.5 m, when mounted at a height of 2.4 m. 8

Visual Alarm Devices O Open Class Device Coverage volume is specified by the manufacturer Open class devices do not conform to either the Wall or Ceiling category. Manufacturer s specification will include: - the mounting position the mounting orientation the minimum and maximum mounting height the shape, dimensions and orientation of the coverage volume (0.4 lux) Example: Corridor VAD 9

Visual Alarm Devices External factors Ambient light level Will artificial light and natural light be a factor (time of day, etc) Reflective surfaces Are walls or other surfaces matt or shiny, etc.? Field of view Is the light visible from the VAD directly or indirectly e.g. light reflected from an adjacent surface would be indirect Use of tinted eye protection Is the VAD to be used in an industrial environment, where personal protective equipment (PPE) may be in use, etc.? 10

Visual Alarm Devices Coverage Distance Multiplication Factors Multiplication factors should only be used after careful consideration of the application, including prevailing ambient light level and the need to rely on indirect, rather than direct illumination. Multiplication factors applied to the coverage distance for VADs may increase, or decrease the specified coverage volume stated by the manufacturer. Courtesy of Coopers Fulleon 11

Visual Alarm Devices Consult the VAD manufacturer s data sheets for the application Manufacturer s provide design guides and/or software APPS Correction Amendment: Clause 3.22 (xvi) delete They shall have the temporal pattern described in ISO 8201 imposed on the evacuate signals 12

Baseline Data Presented by Chris Orr

Baseline Data Baseline data has always been implied in the design standards but rarely adequately treated. Baseline data has been misunderstood and/or misused in the application of AS1851. So much so FP001 is about to issue an amendment to clarify the use of baseline data within the inspection and test regimes. The deficiency has been in the design standards in not adequately treating the need for and how we obtain the necessary data. 14

Baseline Data The new AS1670.1 Clause 1.7 mandates the establishment of baseline data New Definition 1.4.10 Baseline data Data derived from the approved design and commissioning which serve as the basis for subsequent comparison with data derived from inspection, test and survey. (AS1851) Clause 1.7.1 General: The system design shall include the details and documentation for both installation and commissioning of the system. 15

Baseline Data Clause 1.7.2 Baseline data. The design, installation and commissioning documentation shall be provided to facilitate the service and maintenance of the system for the period of its service life... (AS1851) This clause now links the aspects of design, installation and commissioning. 16

Baseline Data The baseline data shall include but not limited to: Site identification Scope of system design Type of system As built drawings including wiring and component details Statement that equipment used complies to the relevant product standard System interface diagram/cause and effect sheet Monitoring details if applicable Power supply details including all quiescent and alarm load calculations The standard is very specific as to what must be included as the minimum Baseline Data - Baseline Data reflects the design 17

Baseline Data Implications of mandating baseline data Clause 1.7.2 Baseline data. The design, installation and commissioning documentation shall be provided to facilitate the service and maintenance of the system for the period of its service life... The baseline data links the performance of the life safety system to the performance of the building 18

Baseline Data Implications of mandating baseline data AS1670.1 2015 introduces 4 new appendix to define the documentation to be provided at the time of system certification. Appendix E - System Designers statement Appendix F - Standard form of installer s statement for automatic fire detection and alarm systems Appendix G - System commissioning statement Appendix J - Commissioning 19

Designer s Statement The design statement needs to identify: The Name and/or company providing the design. Location and name of the site, building and if applicable address. The system is an alteration to an existing system, a new system. Type of system: collective (conventional), addressable, analogue-addressable or any combinations. 20

Designer s Statement The design statement needs to identify: The design criteria AS 1670.1 2015, Deemed to satisfy provisions of NCC, Alternate Solution including Fire Safety Engineering Report reference 21

Designer s statement We certify the equipment used within the design. We have provided the following design documentation I/we confirm the design includes any changes required during the installation of the system and that the system meets the design standard required. 22

Installer s Statement The Installer s statement needs to identify: The Name and/or company providing the installation. Location and name of the site, building and if applicable address. The system is an alteration to an existing system, a new system. Type of system: collective (conventional), addressable, analogue-addressable or any combinations. 23

Installer Statement The system design documentation was provided by - Design Ref. No.. The design criteria is AS 1670.1 2015, Deemed to satisfy provisions of NCC, an Alternate Solution provided by engineer s name/company; fire safety engineering report (FSER) reference... 24

Installer s Statement We certify that (a)the system is installed to the design documentation including all amendments. (b) The design documentation has been updated to include all installation detail including but not limited to zoning, device location, device type, transmission/circuit paths, location of all junction boxes, location of primary power source and location of all end of line devices (ELD). (c) The cabling meets the requirements of AS 1670.1 2015. Cable provider s license number: 25

Commissioning Statement The Commissioning statement needs to identify: The Name and/or company providing the installation. Location and name of the site, building and if applicable address. The system is an alteration to an existing system, a new system. Type of system: collective (conventional), addressable, analogue-addressable or any combinations. 26

Commissioning Statement The design statement has been provided by Name and/or company/address. The installer s statement has been provided by Name and/or company/address. The Design criteria is, AS 1670.1 2015, Deemed to satisfy provisions of NCC, an Alternate Solution provided by engineer s name/company; fire safety engineering report (FSER) reference... 27

Commissioning Statement We certify that the installed system (a) meets the design standard specified; (b) is correctly installed; (c) meets the cause and effect matrix requirements; (d) meets the system interface requirements; (e) commissioning report is provided; and (f) the baseline data is provided (refer Clause 1.7.2). 28

Baseline Data The new requirements recognise the specific and individual skill sets required to design, install and commission a system. The appendices are deliberately informative because system design and performance is specific to the building type, size, layout and occupancy There is no generic commissioning routine, it must be developed and documented to reflect the system design and functionality The format of these appendices is informative to allow an individual company to customise the commissioning documentation. 29

Baseline Data The appendices might be informative BUT the documentation required SHALL be provided. Design Installation Commissioning The COMMISSIONING format is informative BUT the requirement to commission IS MANDATORY 30

Baseline Data Thank you for your time 31