Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER

Similar documents
Instruction Manual HWR MODEL RESISTO-FLO ELECTRIC BOILER

Instruction Manual STR MODEL RESISTO-FLO ELECTRIC BOILER

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

INSTALLATION & MAINTENANCE MANUAL PVI ELECTRIC HOT WATER SUPPLY BOILER

OPERATING AND MAINTENANCE MANUAL FOR ELECTRIC STAINLESS STEEL HEATER FOR DEIONIZED (DI) WATER ELECTRIC HEATER COMPANY BASE MODEL D

OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS. Technical Control Systems Limited MODELS "VIHS"

UHIR Series. Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater. Owner s Manual

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

SECTION DOMESTIC WATER HEATERS

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS

Quartzone. Infrared Quartz Tube & Metal Sheathed Electric Heaters. Owner s Manual. File E COMFORT HEATERS for INDOOR* and OUTDOOR** USE

Installation and Operating Instructions ELECTRIC HOT WATER STEAM BOILERS

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

Chromalox. Installation, Operation. Screw Plug Heating Solution Control Panel Assembly for Screw Plug Heaters RENEWAL PARTS IDENTIFICATION

EHB Series. STONESTEEL Commercial Electric Water Heaters Individually Mounted Elements Vertical or Horizontal CEMLINE CORPORATION

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2

238 Series. Industrial/Commercial Electric Unit Heater. Owner s Manual

Installation, Operation and Maintenance Manual for Model 8331 Condensate Accumulator

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS

Flanged Immersion Heaters

User s Information and Installation Instructions

Flanged Immersion Heaters

Flanged Immersion Heaters

ELECTRIC SPA-PAK HEATER INSTALLATION & OPERATING INSTRUCTIONS

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00

SERVICE MANUAL. Bradford White ElectriFLEX HD (Heavy Duty) Commercial Electric Water Heater CEHD SERIES Immersion Thermostat Models

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

Commercial Electric Energy Saver Water Heater IMMERSION AND SURFACE MOUNTED THERMOSTAT MODELS

Getting Started Quick Reference Guide

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS FOR PIPE THREAD IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS

TECHNICAL INSTRUCTIONS

Installation, operating and servicing instructions

Circulating Oil Temperature Control System

Industrial Flanged Immersion Heaters

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

ULTRA-SAFE Explosion-proof Duct Heaters

L A signature series TA T N E RE O, A L L A T S IN

Water Boilers ME10EN, ME15EN. Table of Contents

Installation Requirements for Models:

LGB Gas fired boiler

Getting Started Quick Reference Guide

MODELS R & RH 10 THRU 20 RB SERIES ELECTRIC STEAM BOILERS

OPERATING AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER. ELECTRIC HEATER COMPANY BASE MODEL SH and H

Custom Duct Heaters. Special Applications

MODEL EH ELECTRIC BOILER OPERATION AND INSTALLATION INSTRUCTIONS

Norcold Repair Guide for Ice Maker

RENEWAL PARTS IDENTIFICATION. Type TTUH and TTUH-CO URN Heaters. Dimensions (In.) Extends. Model Volts kw W/In 2 A B C D

ICE ONLY DISPENSERS MODELS-IOD150, IOD200 AND IOD250 INSTALLATION/SERVICE MANUAL

Installation and Operation Instructions. Versa. Screw Plug Oil & Water Immersion Heater. PD January 2018

Mighty Venter Power Vent System

Revitalize Building Mechanical Systems (4619)

Installation, Operation and. Maintenance Instructions

SERVICE/INSTALLATION MANUAL ICE ONLY DISPENSERS MODELS-IOD150, IOD200 AND IOD250

OPERATING AND MAINTENANCE MANUAL FOR BOILER WATER OR HIGH TEMPERATURE HOT WATER (HTHW) POWERED WATER HEATER

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR POINT OF USE STEAM FIRED WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL PS

Installation Instructions

Duct Heaters volts/1 phase volts/3 phase volts/3 phases volts/3 phases. Flange Type Duct Heater.

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

INSTALLATION AND SERVICE MANUAL

Installation and Operating Instructions. Precision Flextube Boilers. FTS Series STEAM BOILERS

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Thermal Devices Inc. Mount Airy, Maryland USA Process Air and Radiant. ADH Typical Installation.

CFP4, 8 or 12 Exde Immersion Heater. CERTIFIED TO IEC :2000, IEC :2001 and IEC :2001

THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

INSTALLATION INSTRUCTIONS FOR 7330C740 FLUSH MOUNT CEILING ASSEMBLY

Custom Duct Heaters. Special Applications

INSTALLATION INSTRUCTIONS FOR 8330*5511 MOUNTING KIT

Unfired Steam Generators (Series RB) Installation, Operation and Maintenance

Pipe Thread Heaters. Construction Features. Star Electric to Order Call " 2-1/2" Pipe Thread Heaters

ERGOMAX 7 INSTALLATION

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

DIVISION COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS

OWNER'S SERVICE MANUAL NO INSPECTION, MAINTENANCE AND RECHARGE

Indirect Fired Water Heater

CER Series 2. Installation Instructions. Electric-Hydronic Boilers. Installer

DIVISION FINNED WATER-TUBE BOILERS

WATER-TUBE POOL HEATERS

ULTRA-SAFE Explosion-proof Duct Heaters

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Service Manual Model 3163

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

WATER HEATERS / BOILERS GSB8-E. Gas-Fired Steam Boiler PRODUCT SPECIFICATIONS. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB E

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMPACT POINT-OF-USE ELECTRIC WATER HEATER

Basin Heater. user manual INSTALLATION OPERATION MAINTENANCE

TJERNLUND PRODUCTS, INC.

Niles Steel Tank Hot Water Generator Installation and Operation Manual

CRYOGENIC EXPERTS, INC. World Wide Web Toll Free FOR CEXI Phone (805) Facsimile (805)

GSB8. CONSERVATOR Gas-Fired Steam Boiler. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB S MODEL NUMBER IDENTIFICATION FEATURES

DIVISION FINNED WATER-TUBE BOILERS

HEG / RRE / WEG Series Griddle

WHY THE REMOVAL OF NONCONDENSABLE GASES AND AIR IS CRITICAL IN A STEAM SYSTEM

J120 STEAM BOOSTER INSTALLATION, OPERATION, AND SERVICE MANUAL J120 STEAM BOOSTER. J120 Steam Booster Manual D

Circulation Heaters. To order, call or shop online at omega.com SM. CHF Series

Heat Exchanger Tube Change Procedure

CELDEK Evaporative Cooler Module Installation, Operation, and Maintenance Manual. CELDEK Evaporative Cooler

POWER VENTER. Model: PVE Series

Installation and Maintenance "L" and "LS" Series

Transcription:

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER 1

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER FOR YOUR SAFETY This manual supplies information on the application, installation and operation of Precision Model ISH Electric Steam Superheaters. Review all application and installation procedures completely before proceeding with the installation. Consult the Precision Boilers Factory or local Representative with any problems or questions regarding this equipment. Experience has shown that improper installation causes most operation problems. WARNING Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. Read this manual thoroughly and follow the instructions herein. The PRECISION ISH Electric Steam Superheater shall be installed according to the procedures detailed in this manual, or the Precision Boilers Limited Warranty may be voided. The installation must conform to the requirements of the local jurisdiction having authority, and to the latest edition of the National Fuel Gas Code, ANSI Z223.1. Any modifications to the boiler or its gas / oil controls may void the warranty. If field installation requires modifications, consult either the local Precision Boilers Representative or the Factory. RETAIN THESE INSTRUCTIONS NEAR THE EQUIPMENT FOR READY REFERENCE 2

TABLE OF CONTENTS I Title page... 1 II Introduction... 2 III Table of Contents... 3 1.0 INSTALLATION CLEARANCES 1.1 General... 3 2.0. MECHANICAL INSTALLATION 2.1 Steam Piping... 4 2.2 Safety Valve... 5 2.3 Hydro Test... 5 2.4 Responsibility... 5 3.0 ELECTRICAL INSTALLATION 3.1 Electrical Power Supply... 5 3.2 Grounding... 5 3.3 Thermocouple Connection... 6 3.4 Control Circuit Power Supply... 6 4.0 OPERATING INSTRUCTIONS 4.1 General... 6 4.2 Preliminary Checks and Adjustments... 7 5.0 MAINTENANCE 5.1 Elements... 8 5.2 Controls... 8 5.3 Electrical Components... 8 5.4 Hairpin Type Element Replacement Procedure... 8 5.5 Figure 1 Flange Gasket Assembly... 10 1.0 INSTALLATION CLEARANCES 1.1 General PRECISION has made a commitment to product improvement and follows a continuing quest for the highest standards of product performance. In pursuing this policy of continuous development of products, the manufacturer reserves the right to vary any details in this manual without notice. Before installing the superheater, be sure the mounting location selected permits access to superheater trim and allows for element removal at the flanged ends as shown on the dimensional drawing. CAUTION: Due to extreme temperatures possible with model ISH Superheaters, the vessels and piping must be well insulated and mounted away from combustible materials. 1.1.2 Because electrical power connections and thermocouple wires will need to be run from the control cabinet to the superheater, it is recommended that the superheater control cabinet be mounted in proximity to the superheater proper. NOTE: Superheater expansion should be considered in installation of superheater and associated piping. Steel expands at a rate of 0.0000065 inches per F and stainless steel at a rate of 0.0000096 inches per F. The differential between superheater operating temperature and shut down temperature can be significant and good engineering practice may require that only one support point be fixed while the other is allowed to float during expansion. 3

EXAMPLE: A 60 inch long stainless steel unit operating at 900 F from a shutdown temperature of 70 F will expand by 60inches X (900-70) F X 0.0000096 inches / in F 0.48 inches. 1.1.3 Since superheater performance is greatly dependant on steam quality (IE: the moisture content in steam), it is greatly recommended that as moisture content is expected to be greater than 1/2%. 2.0 MECHANICAL INSTALLATION 2.1 Steam Piping 2.1.1 Install steam piping connecting steam supply to superheater inlet. Pitch steam inlet piping to properly drain condensate formed in the steam line back to the boiler or to a trapped drip leg. 2.1.2 Install steam piping connecting superheater steam outlet to equipment to be supplied with superheated steam. The superheater outlet connection is the end at which thermocouple taps are located. NOTE: Superheater pressure vessel connections are not designed to support pipe loads. Steam inlet and outlet piping must be adequately and independently supported by pipehangers. NOTE: High outlet temperatures possible with model ISH superheaters require that the following be considered during the installation phase. 1) Pipe expansion as noted in Section 1.1 2) Derating of pipe and pipe fittings with increasing temperature. Refer to ANSI specifications for allowable pressure / temperature ratings. 3) Superheater and piping are sufficiently insulated to prevent loss of steam superheat and to protect personnel. Due to high temperature capability and correspondingly high heat transfer rates, insulation must be adequate. 4) It may be beneficial to locate the temperature control thermocouple remote from the superheater (IE: closer to the using equipment) for small superheaters with varying flow rates. NOTE: It is recommended that the piping be checked for leaks before insulating. 4

2.2 Safety Valve 2.2.1 When required, a safety valve has been supplied with the superheater. 2.3 Hydro Test 2.3.1 It is good practice, as well as dictated in most local codes that a hydrostatic test, at a pressure equal to the safety valve setting, of the entire system be performed prior to superheater start-up. All leaks, both superheater and piping, should be stopped at this time. Additional leaks may develop under operating conditions due to the effect of temperature along with pressure. If severe, these leaks should be stopped as they occur by shutting unit down and tightening and / or reapplying sealant to threaded connections under safe, no pressure conditions. High temperature and pressure sealants such as X-PANDO are recommended. NOTE: Small leaks between the bodies of the element compression fitting and the element flanges usually stop during the first few days of heater operation. Larger leaks, however, may necessitate tightening of compression fitting body. CAUTION: Do not exceed 110 foot lbs. torque for a stainless steel compression fitting. 2.4 Responsibility 2.4.1 All piping, valves and fittings must meet the requirements of the local regulating codes. The responsibility for the installation of this superheater and compliance of installation with local codes rest with the owner or the installing contractor. PRECISION does not assume responsibility for connections made installing its equipment. 3.0 ELECTRICAL INSTALLATION 3.1 Electrical Power Supply 3.1.1 Check the superheater nameplate / wiring diagram for kw rating, voltage, phase and ampacity. When ampacity is not given, it can be calculated for three phase power by I = P divided by 1.732V where I is current per phase in amperes, P is power input in watts, and V is voltage applied in volts (1.732 equal the square root of 3). 3.1.2 Check the electrical supply to be sure it conforms to the superheater requirements. 3.1.3 Make electrical connections to the distribution block housed within the top portion of the superheater control cabinet. Minimum wire size is given on the wiring diagram. 3.2 Grounding 3.2.1 Connect an equipment ground to the grounding lug located within the control cabinet. Minimum copper wire size to be used is indicated on the wiring diagram. 5

3.3 Thermocouple Connection 3.3.1 Connect the wire provided with the thermocouples to the temperature control units in the superheater control cabinet as indicated on the wiring diagram. It is not necessary to shield these cable from other lines, however, it is necessary to maintain the correct polarity, positive or negative, at connection to controller. The red lead is positive and the black is negative. 3.4 Control Circuit Power Supply 3.4.1 Most PRECISION control cabinets are supplied with integral control power transformers and do not require separate 120VAC power supply. 3.4.1.1 On units requiring separate 120VAC power supply, a fused 120VAC power source must be connected to the two pole terminal block housed within the top control cabinet. Refer to the wiring diagram. 4.0 OPERATING INSTRUCTIONS NOTE: Prior to start-up, any superheater and control cabinet which has been exposed to dusty, wet, and / or humid conditions must be thoroughly cleaned and dried out. The build-up of dust and rust may result in malfunction and / or damage unless the following precautions are undertaken: 1) All electrical components should be thoroughly cleaned, dried and checked for loose connections. 2) All element terminals should be thoroughly cleaned and dried, then meg ohm reading taken to assure there are no shorts to ground. 3) Heater and control cabinet should be inspected for stray objects, metal scraps, etc. which may have accumulated during installation. All such material must be removed from boiler before start up. 4) All power wiring connections should be checked to assure tight connections. IMPORTANT: Precision Boilers, Inc., as manufacturer of these boilers, will not be responsible for damages incurred at the time heaters are started up, unless the above steps have been taken to assure the heaters are properly prepared for start up. 4.1 General The following section of this manual should be read in its entirety prior to performing any operations. 6

4.2 Preliminary Checks and Adjustments 4.2.1 Temperature Control (Superheaters supplied with SCR power control) 4.2.1.1 Temperature Setting Most Model ISH Superheaters are equipped with proportioning type temperature controls. These units employ a thermocouple installed at the superheater outlet to sense steam temperature, a solid state temperature control to generate a 4-20 milliamp signal in proportion to temperature deviation from set point, and an SCR (silicon controlled rectifier) to modulate power input to heating elements to control superheater output temperature. The temperature control should be set at the desired superheater outlet temperature but shall not exceed 90% of the superheater maximum allowable temperature as stamped on its nameplate. This limit is necessary, at least initially, to prevent over temperature resulting from controlled overshoot of setpoint. Proper system operation can be checked via the temperature limit control or temperature gauge if installed. NOTE: The superheater should not be operated without flow to equipment served or flow through a bleed valve installed downstream of the superheater. Flow is necessary for the thermocouples to properly sense steam temperature and avoid element burnout as a result of element overheating. 4.2.1.2 Response Adjustment Temperature controlled response can be adjusted via proper programming of the controller. With these adjustments the controlled gain and reset can be increased or decreased to stabilize the superheater output temperature. Refer to vendor literature at the back of this manual. 4.2.2 Temperature Control (Superheater supplied with non-proportioning control) 4.2.2.1 Temperature Setting Some Model ISH Superheaters are equipped with one or more independent temperature controls which switch on or off elements in accordance with their temperature setting. The differential between these settings should be set in accordance with system requirements. Adjustment is made by changing setpoint indicated on control to bring heating element on or off at higher or lower temperature as required. For adjustment of the differential in which the element circuit remains energized, refer to the vendor literature at the back of this manual. 4.2.3 Temperature Limit Cutout A second thermocouple and control or temperature limit switch is employed to act as a superheater high temperature cutout. This control setpoint should be set at the maximum allowable superheater temperature as stamped on the superheater nameplate. This control will turn off the superheater if its temperature limit is exceeded and will automatically reset, returning superheater to operation, once temperature falls. For adjustment of the temperature limit control differential (between off and on), refer to the vendor literature at the back of this manual. 7

NOTE: Refer to descriptive literature in the rear of this manual on the respective controls. 5.0 MAINTENANCE 5.1 Elements 5.1.1 Operational Check If an ammeter is supplied with the superheater, it should be used each time the unit is started up to check proper operation of the heating elements. To do this, simply switch from phase to phase, if current reading is consistent on all phases, then elements are operating properly; if one or two phases read low, then at least one element has probably failed. IMPORTANT: Failed elements should be replaced immediately upon determination of a failure (see Section 5.3.3). 5.2.1 Temperature Control Check of the proportioning temperatures control system can be made by moving the set point of the controller up or down scale and noting the corresponding action of the step control. If the step control fails to follow in either direction, refer to the appropriate descriptive literature at the rear of this manual. 5.3 ELECTRICAL COMPONENTS 5.3.1 Contractors Periodic inspection and cleaning of contacts should be made. Spot check for pitted, burned or welded contacts and inoperative coils. 5.3.2 Fuses Check for loose fuse clips and wires. Inspect for discoloration of clips due to looseness or overheating. 5.3.3 Elements The resistance type immersion elements are field-replaceable with standard tools. To replace defective elements, refer to the replacement procedure attached herewith. 5.4 Hairpin Type Element Replacement Procedure CAUTION: Before element replacement, make certain main power to boiler / heater is turned off and unit is fully drained and vented. 5.4.1 Make sketch or drawing of element bussing and tag wires to simply re-connection later. 5.4.2. Remove element flange assembly from vessel. 8

NOTE: Some flanges have 1/2-13 tapped hole to use for jacking screw to help in breaking free the gasket. 5.4.3 Remove jumper wires and ferrule nuts from defective element. 5.4.4 Slide element toward dry side (about 2 ) to expose ferrules on element. Cut off ferrules with hacksaw. Slide element out of steel toward wet side. 5.4.5 Inspect and clean thread and set of steel flange where new ferrule will seal. If seats are pitted or rusted, it may be impossible to seal new elements; therefore, a new flange may be required. 5.4.6 Inspect element to insure sheath area in which ferrule will seal is clean and smooth. Clean with steel wool is necessary. 5.4.7 Screw new ferrule nuts (furnished with replacement element) into cleaned or new flange plate (finger tight). 5.4.8 Slide element into position. Make sure element sheath copper or Incoloy protrudes beyond ferrule nut approximately 1/4, or to match original assembly. Some boiler models may require the element sheath to extend out further than ¼ so that there is sufficient clearance between the end of the element and the opposite tank wall (3/4 min.) 5.4.9 Hold element to prevent twisting while tightening ferrule nuts. Tighten nuts to approximately 30-35 ft. lbs. (brass) or 55-60 ft. lbs. (stainless steel). You will feel ferrule separate from nut while tightening. A properly tightened ferrule nut will have separated from its ferrule and the ferrule will be squeezed or compressed onto the element sheath, thus providing a tight seal. 5.4.10 Replace element assembly into boiler, using a new gasket and anti-seize compound on gaskets and bolts. Torque element flange bolts to 90 100 ft. lbs. (for standard ½ -13 high stress bolts). 5.4.11 When boiler is filled and pressurized, inspect for leaks around all element flange bolts and gaskets. 5.4.12 Reinstall bussing and flange wiring. Check for proper phase-to-phase resistance, and that phase to ground resistance is infinite. 9

5.5 Figure 1 Flange Gasket Assembly 10