Community LID Workgroup Issue Paper #6

Similar documents
Zoning Design Standards. Low Impact Development Code Update Thurston County Planning Commission March 2, 2016

RESOURCE STEWARDSHIP DEPARTMENT Cynthia Wilson Director

Low-Impact Development Code Update. Thurston County Community Stakeholder Group June 25, 2015

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

Green Infrastructure & Low Impact Development

Going Green with the NYS Stormwater Design Standards

Importance of Master Planning Marcy Colclough

New Development Stormwater Guidelines

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Draft Rhode Island Stormwater Design and Installation Standards Manual

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Introduction Post Construction Stormwater Management Performance Requirements

Introduction Post-Construction Stormwater Management Performance Requirements

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Nonpoint Education for Municipal Officials. Linking Land Use to Water Quality. Partnership for Environmental Technology Education

Chapter 3 Site Planning and Low Impact Development

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Session 1E Non-Structural BMPs. Chesapeake Bay Stormwater Training Partnership 1

Low Density Projects. Design Objective

WHATCOM COUNTY LID CODE INTEGRATION PROJECT WCC (DEFINITIONS)

SANTA CRUZ COUNTY REGULATORY IMPEDIMENT GAP ANALYSIS TOOL

Conservation in South Jersey Being Creative with Restoration

Standards Manual. RIDOT Workshop. Design Strategies: How to Meet Minimum Standard No. 1 July 13, 2011

Prepared for: Central Coast Low Impact Development Initiative centralcoastlidi.org

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Rhode Island Stormwater Design and Installation Standards Manual

DEFINITIONS AND RULES OF MEASUREMENT DEFINITIONS AND RULES OF MEASUREMENT 7-1

Appendix D - Technical Design Criteria for BMPs

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

3. Are there any projects exempt from the definition of Regulated Projects?

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

Appendix I. Checklists

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses

Post Construction BMPs

Can Urban Redevelopment Restore Aquatic Resources

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

3700. OLD HOMOSASSA AREA REDEVELOPMENT PLAN STANDARDS. Aesthetic standards are mandatory for nonresidential projects only.

Drainage Control Plans

Stormwater Runoff and the District of Columbia RiverSmart Homes Defined:

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

GENERAL INFORMATION What is Stormwater? What is a stormwater utility? What is an impervious surface?

LID Guidance Manual for Maine Communities

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

LOW IMPACT DEVELOPMENT TOOLS FOR VERMONT TOWNS

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

Concreteville, CT. March 10, 2004

Urban Water Management and Soils (ESRM 311 & SEFS 507)

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Scorecard. WaterQuality. Appendix B USEPA WATER QUALITY SCORECARD APPENDIX B

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

2.1 Principles & Objectives

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

WEFTEC.06. ** City of Caldwell, Idaho

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend

Chapter 5 - On-Site Storm Water Management

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Cost Effective Low Impact Development

Adopting the Manual of Best Management Practices for Stormwater Quality. Facts for Communities

Impervious Cover Project for Climate Resilience in New Jersey

Appendix E: Illustrative Green Infrastructure Examples

5/22/2012. Low Impact Development through NPDES Permits TAKE AWAY MESSAGES. Municipal Stormwater NPDES Permits

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Worksheet #14 Water Runoff Management

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro

A P P E N D I X D. Project Stormwater Plan Worksheets

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)

Chapter 14. Stormwater Quality Introduction

Pennsylvania Stormwater Best Management Practices Manual

Three threshold measures will be applied together to capture project scale and scope and impacts:

Nick Sigmund, Sr. Zoning Officer

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Background on LID in Western WA

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Boardman River Watershed VILLAGE OF KALKASKA. WATER QUALITY ACTION PLAN Fall 2009

Watershed Planning Workshop

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Low Impact Development and Green Infrastructure 101. The new paradigm for stormwater management

Managing Stormwater Naturally. July 17, 2013

Low Impact Development Guidance Manual

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Background / Regulatory Requirements

Green Infrastructure Stormwater Management Applications in the Pines Frequently Asked Questions and Example Projects

Transcription:

Community LID Workgroup Issue Paper #6 Topic: Hard and Impervious Surface Coverage Limits Objective: Minimize the amount of hard and impervious surfaces in developments to allow more stormwater to infiltrate into the ground on site. Background: Impervious surfaces, by definition, are materials that prevent the infiltration of water into the soil. The most common impervious surfaces in the built environment are roads, rooftops, sidewalks, and patios. While these structures are almost 100% impervious, other features such as gravel roads, compacted soils, and even lawns are impervious to varying degrees, as they allow for less infiltration than forests and other natural ground. As development increases, so does the amount of impervious surface, which leads to changes in the way water is transported and the hydrology of a drainage basin. Stormwater runoff resulting from increased impervious surfaces affects both the quality and quantity of water entering natural water bodies in many ways. Stormwater runoff can lead to severe environmental impacts such as flooding, habitat loss, erosion, channel widening, and streambed alteration. Along with increased runoff comes decreased infiltration, which reduces groundwater supplies and may lead to a lowering of the water table. Ground water provides a consistent water supply to streams, wetlands, and lakes, and decreases in ground water supply may cause a stream or wetland to dry out during months when precipitation is low. As a general rule of thumb, when impervious surfaces exceed 10% of a basin (the entire area that drains into a stream) adverse environmental impacts can be measured in the stream although impacts can occur in rural basins at impervious surface thresholds as low as 2%. Stream basins with above 25% impervious area generally have degraded water quality. Water Cycle Changes Associated with Urbanization Currently, within Thurston County s Zoning Code (Title 20), some zones have impervious surface limits, while others only limit the extent a lot can be covered by buildings (this excludes

from consideration hard surfaces such as parking lots, driveways, or patios). Impervious surfaces also are limited within the Shoreline Master Program for most shoreline lots the limit is 30% lot coverage. In addition, any development in unincorporated Thurston County that fits the criteria below requires a review by Thurston County Water Resources staff to ensure it meets runoff flow-control standards: More than 5,000 square feet new impervious surfaces Converting more than three quarters of an acre from native vegetation to lawn or landscaping Clearing of more than two-and-a-half acres of native vegetation to pasture Depending on soils and property-specific characteristics, flow-control mechanisms may be put into place to manage stormwater. The new stormwater manual requirements from Ecology address the total amount of hard surfaces on a site hard surfaces include impervious, paved areas, as well as semi-pervious areas, including permeable pavements and vegetated roofs. This 2.2 acre property contains a large home, detached garage, and driveway. The impervious area is 10 percent or 9,900 square feet. Analysis: Thurston County s zoning code has an inconsistent approach to addressing impervious surfaces. Where limits have been set they are typically located within sensitive zoning districts, such as the R 1/10, R 1/20, sensitive basins such as McAllister Geologically Sensitive Area, and Green 2

Cove Creek Basin, or on soil types with low infiltration rates. In other rural zoning districts there are sometimes building coverage limits and/or impervious surface limits that range as high as 60% in rural areas, or no mention of limits at all. Sixty percent is much higher than the actual impervious area on an average developed rural residential lot. Indeed, if all new residential development occurred with such a large amount of impervious area, it would likely lead to degradation of stream health and water quality. For a related study, Thurston Regional Planning Council staff digitized the impervious area for 92 properties that contained a single residential dwelling unit built after 1995 and was considered fully developed based on zoning density. Using this sample data set, the following relationship of rural lot sizes to impervious area were developed: Acres Lot Size Square Feet Typical Zoning Density Average Percent Impervious Average Square Feet Impervious Number of Parcels in sample 0.07 to 0.2 3,000-8,700 4-16 units per acre 52% 3,000 9 0.2 to 0.9 8,700-39,200 3-6 units per acre 2 units per acre 27% 3,900 10 0.9 to 1.8 39,200-78,400 One unit per acre 15% 8,600 16 1.8 to 4.6 78,400-200,400 One unit per 2 acres 9% 8,500 11 4.6 to 9.5 200,400-413,820 One unit per 5 acres 5% 13,000 24 9.5 to 19.5 413,820-849,400 One unit per 10 acres 3% 18,300 7 19.5 to 40 849,400-1,742,400 One unit per 20 acres 3% 37,200 6 40+ ac 1,742,400 plus One unit per 40 acres 1% 36,100 9 The table above shows average percent impervious area. The range is quite high depending on how long driveways are and whether the garage is attached or detached. Thurston County staff discussed the following options, related to impervious surface limits: 1. No change. Impervious surface limits would remain as they currently exist in code and are only applicable for some zones. This option would not reduce new impervious surfaces. 3

2. Develop consistent impervious surface limits for all sensitive zones. This approach would develop more restrictive hard and impervious surface limits for the areas identified as most in need of protection, including Long Term Agriculture, Long Term Forestry, RR 1/10, RR 1/20. Impervious surface limits would remain inconsistently applied to other zones, and the limit for RRR 1/5 (which is the largest zone in the county, by area) would remain high at 60%. An alternative that was discussed was to apply limits to all residential and resource zones, but to exclude commercial and industrial zones. 3. Develop consistent impervious surface limits for all zones. This approach would develop hard and impervious surface limits for all zones, including commercial and industrial zones. Limits would be based on typical use within zones. The limits could be partnered with incentives to allow flexibility of design in exchange for certain desirable practices, such as additional tree retention or use of permeable pavements. 4. Develop impervious surface limits based on basins or watersheds, with an associated impervious surface trading program. This approach would rely on basin studies that set an appropriate limit based on environmental conditions in a particular area, similar to how the County has set impervious limits for Green Cove Creek basin and the McAllister Geologically Sensitive Area. Recommendations: Wherever possible, clarify definition of impervious surface and hard surface across different sections of the code to be consistent with that used in the Drainage Design and Erosion Control Manual (DDECM). Use the term hard surface limits rather than impervious surface limits to be consistent with new guidance from Ecology. Option 3 develop consistent hard and impervious surface limits for all zones (see attached table for current and proposed new limits. For residential and resource lots less than 5 acres, limit is 60% or 10,000 square feet, whichever is less. Preexisting hard surfaces or structures can be replaced within the existing footprint For lots greater than 1 acre, an additional 5% may be used for buildings related to agriculture or forestry practices. Use of pervious surfaces can be estimated at 75% of total area for calculating total hard surface area. Hard surface area limit may be increased with a special use permit. Credit Option 1: o Hard surface limits can be increased by 50% under the following conditions: Soils on site allow for full dispersion of stormwater runoff 4

Landscape plan shows retention of existing native trees and vegetation on at least 20% of the site. Up to 20% of these trees can be in a critical area or buffer. The development is a Planned Residential Development (PRD) or Planned Rural Residential Development (PRRD) o Hard surface limits can be increased by 100% in residential and resource zones under the following conditions: Landscape plan shows retention of existing native trees and vegetation on at least 65% of the site. Credit Option 2: limit if landscape plan shows 6,500 square feet retention of native trees and vegetation that are outside of any designated critical areas or buffers. Retained trees would need to be recorded on the final plat and in the abbreviated drainage plan. limit if landscape plan shows 3,250 square feet retention of native trees and vegetation connecting designated critical areas or buffer. Retained trees would need to be recorded on the final plat and in the abbreviated drainage plan. limit if landscape plan shows 3,250 square feet replanting of native trees and vegetation within a riparian or wetland buffer area. Retained trees would need to be recorded on the final plat and in the abbreviated drainage plan. Community LID Workgroup Discussion: What do you think of the recommended changes to impervious surface limits and credit options? Are there additional incentives or credits that would be more effective or desirable? Are limits for commercial and industrial zones too constraining? 5