WARNINGS FOR THE USER: Connect BASE conforms to: Low Voltage Directive 73/23/EEC. Electromagnetic Compatibility Directive 89/336/EEC

Similar documents
Installation and Operation Manual IDRA PLUS DS. Solar Solar storage cylinder. Installation and Operation Manual

USERS MANUAL FOR GAS BOILERS

USER MANUAL ACQUAHOME 32 B BLU

Read this manual through carefully before installing/using the cleaner, paying special attention to the SAFETY INSTRUCTIONS

INSTRUCTION FOR THE USER THC V E OIL BLU

Installation Manual STOR C. Solar combination storage cylinder. Installation Manual

Installation and Operating Instructions

REFRIGERAT A OR USE DF1-15 F ridge

DIGITAL MODULATING BOILERS

System s30. User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS SYSTEM BOILER

INSTRUCTIONS FOR USE... 2

DEVIATING VALVES ART K063

INSTRUCTIONS FOR USE. To make the most of your new oven, read the user's instructions carefully and keep them on hand for consultation in the future.

cod. Doc rev. 2 12/ ACI PLUS EN INSTALLATION, OPERATION AND MAINTENANCE MANUAL

PC87 American Style Double Door Fridge Freezer Manual for Installation, Use and Maintenance

Combi C30 & C35. User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS COMBINATION BOILER

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

USERS GUIDE. Esprit eco 24, 30. For installation guide see reverse of book

INSTRUCTION AND MAINTENANCE MANUAL DRYERS A5 - A6 - A7 - A7,5 - A8 - A9 - A10

Proline GAS HOB Model TCG40IX Instruction Book

INSTRUCTION AND MAINTENANCE MANUAL

VAPORELLA. Fig. 1 Fig. 2. Fig. 3 Fig. 4

USER GUIDE VOGUE COMBI GEN2 C26 C32 C40

USER GUIDE LOGIC HEAT H

Rigoletto 60,90 & 120 Built-In Cupboard Hood

Logic+ Combi

HOW TO USE THE FREEZER COMPARTMENT PAGE 16

Polti S.p.A. reserves the right to change equipment or accessory specification without prior notice.

USER GUIDE VOGUE MAX SYSTEM

AUTOMATIC GRANULAR ICE FLAKER

V.lla Pro 5200 R - Cod. M0S Edizione 1H04

Light oil / kerosene burner

20 LITRE DEHUMIDIFIER

MURELLE HE 110 R (M) User instructions. Please read the Important Notice within this guide regarding your boiler warranty

SAFEGUARDING THE ENVIRONMENT IMPORTANT NOTES BEFORE USING THE OVEN OVEN ACCESSORIES CARE AND MAINTENANCE TROUBLESHOOTING GUIDE AFTER SALES SERVICE

Leonardo 90 Wall Hood

Par 16 with GU10 Socket

VALUE SERIES SLIMLINE MULTIDECKS

Rigoletto 60,90 & 120 Built-In Cupboard Hood

(A) V.lla NEW CONCEPT 450 PATENT - M0S Edizione 1H09

Hamlet 60 & 80 Wall Hood

Nabucco Island Hood. Installation & User Instructions. Please read these instructions carefully before installing and operating this appliance

51AKB / 51 AKC OWNER S MANUAL

i 24, i 30, i 35 combination boilers USER GUIDE For Installation Guide see reverse of book UIN A05 October 2017

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

HOW TO OPERATE THE FREEZER COMPARTMENT PAGE 15 HOW TO DEFROST THE FREEZER COMPARTMENT PAGE 17

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove

BOILING UNIT REDITAP. Installation and User Guide. IMPORTANT: This booklet should be left with the user after installation and demonstration

USERS GUIDE 24, 30. For installation guide see reverse of book

MODULAR AUTOMATIC GRANULAR ICE FLAKER

OPERATING AND MAINTENANCE MANUAL SERVICE CENTRE AUTHORIZED DEALER. Ed. 02/2012 PANCAKE OVEN

WHE 2.24 / WHE 2.24 FF

K20 K40 ICEMAKER INSTRUCTIONS

PF 604 Piano di cottura da incasso elettrico 60 Electric built-in cooking table 60 Plan de cuisson à encastrement électrique 60

Unvented Electric Water Heater 10/15 litre Undersink

CONNECT SOLAR MR - 7,5m

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

MHE001 electric hob. Manual for Installation, Use and Maintenance

HOW TO OPERATE THE FREEZER COMPARTMENT PAGE 17 HOW TO DEFROST THE FREEZER COMPARTMENT PAGE 19

INSTRUCTION AND MAINTENANCE MANUAL DRYERS A 11 - A 12 - A 13 - A 14 (R410A)

Verdi 90 & 120 Ceiling Hood Re-Circulating and Ducted Installation & User Instructions

DXAPV3N. Air Purifier. With. Enviro-neutralising Technology DXAPV3N

Pulitore a vapore Steam cleaner Nettoyeuse à vapeur Dampfreiniger Limpiador de vapor limpador a vapor stoomreiniger ατμοκαθαριστής Пароочиститель

USER MANUAL. 60cm, 3 burners, Hob AKC 630

FW422. Integrated In Column Larder Fridge. Installation, use and maintenance.

PC71 American Style Fridge Freezer

Instruction Manual for Electric Warming Drawer BWD14B

Rif Cod i220-0

I N S T R U C T I O N S

BEFORE USING THE REFRIGERATOR PAG. 9 PROTECTING THE ENVIRONMENT PAG. 9 PRECAUTIONS AND GENERAL SUGGESTIONS PAG. 9

INSTRUCTIONS AND ADVICE FOR THE USE, INSTALLATION AND MAINTENANCE OF BUILT-IN ELECTRIC HOBS

PC 640 GB. Built-in cooking tables 60 Instructions for installation and use

Built-in Gas Hob CZ55554 CZ55571

UL U TR LTRASONIC S ONIC SCALE ALER PIEZO MINI

Operating instructions HOT WATER BOILER HEETWATERAPPARAAT HWA 20

SAFEGUARDING THE ENVIRONMENT IMPORTANT NOTES BEFORE USING THE OVEN OVEN ACCESSORIES CARE AND MAINTENANCE TROUBLESHOOTING GUIDE AFTER SALES SERVICE

BUILT-IN GLASS HOB MODEL: EGH-G8592G(BK) EGH-G8593G(BK) Owner s Manual Please read this manual carefully before operating your set.

"Microbox" DC Models MBOX 125/2DC MBOX 125/2DC204

3. To protect against electric shock, do not immerse cord, plugs, or machine in water or other liquid.

IST 03 C CYLINDER WHPF BM USE AND MAINTENANCE HANDBOOK

USER GUIDE. IMAX XTRA EL kW. For Installation Guide see reverse of book

INSTRUCTIONS AND ADVICE FOR THE USE, INSTALLATION AND MAINTENANCE OF BUILT-IN ELECTRIC HOBS

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

USERS GUIDE. LOGIC+ Combi 24, 30, 35

STAINLESS STEEL TOASTER

Instruction Manual. Model: LPP4513 (18 ) For safe operation be sure to read through this instruction manual before operating your Laminator.

CONTROL PANEL. RIELLOtech PRIME ACS INSTALLATION, OPERATION AND MAINTENANCE MANUAL

User and Installation Instructions. Wall Mounted Water Boiler WMB3F/B and WMB3F/W IS435 ECN3461

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

IST 03 C ELBA DUAL INSTALLATION, USE AND MAINTENANCE

instructions OIL FILLED RADIATOR V V and V551225

I K. V.lla ADVANCED SYSTEM - M0S Edizione 1H10

FWC860 Wine Cooler Installation, Use and Maintenance

USING THE REFRIGERATOR COMPARTMENT

Index. page 8. 1 Description of appliance. Description of accessories. page 4. 3 Precautions for use. page 5. 4 Getting started

Belling. Gas Hob GHU573 - GHU573T GHU70GE - GHU70TGE - GHU70GC GHU70TGC - GHU60GC INSTALLATION AND USER INSTRUCTIONS

ANTI-CALC.

VAPORETTINO LUX A B C E. Fig.1 Fig.2 Fig.3 Fig.4. Fig.5 Fig.6 Fig.7 Fig.8. Fig.9 Fig.10 Fig.11. Vaporettino Lux 1R02

CONTENTS QUICK REFERENCE GUIDE INSTRUCTIONS FOR USE PROGRAMME CHART BOOKLET

Installation and Operating Instructions

Transcription:

Connect BASE conforms to: Low Voltage Directive 73/23/EEC Electromagnetic Compatibility Directive 89/336/EEC Warnings and safety considerations Page 13 Description of the equipment 14 Technical data 14 Dimensions and weight 14 Hidraulic circuit 15 Circulation unit 16 Wiring diagrams 16 Installation of the appliance 17 Typical installation layout 18 Hidraulic connections 19 Electric connections 20 First starting up 21 Circulation pump 21 Low temperature appliance setting 21 High temperature appliance setting 21 Checks after installation 21 Cleaning 21 This instruction manual is an integral part of the manual for the boiler to which the Connect BASE unit is connected. See the latter manual for GENERAL WARNINGS and BASIC SAFETY RULES and other specific information on the functioning of the boiler. The following symbols are used at some points in the manual: WARNING for actions that call for particular caution and adequate training. FORBIDDEN for actions that MUST NOT be carried out under any circumstances WARNINGS FOR THE USER: This device does not require any setting or checking by the user. Opening the front cover on the device is therefore forbidden. Check the water pressure in the system from time to time. If necessary, alter the pressure as indicated in the instruction manual. If the pressure drops frequently, call in professionally trained personnel to check the status of your system. 12

WARNINGS AND SAFETY DEVICES The boilers made in our factories are all built with care being taken over each individual component in order to protect both the user and the installer from any accidents. We therefore urge trained personnel to be particularly careful with the electrical connections on completion of each job done on the product, especially as far as the bare parts of the conductors are concerned. These must not stick out of the terminal board in any way, so as to avoid any possibility of contact with live parts of the conductor itself. Both this instruction manual and the user s manual are an integral part of the product. Make sure that they always remain with the machine, even if it is sold to another owner or user, or if it is transferred to another plant. If it should get damaged or lost, ask your local Technical Assistance Service for another copy. Installing the boiler and any other assistance and maintenance work must be carried out by qualified personnel in compliance with the relevant laws and current standards. We recommend that the installer instruct the user on how the equipment works and on basic safety standards. The boiler must only be used for the purposes for which it was expressly made. The manufacturer does not accept any contractual or extra-contractual responsibility for any damage caused to people, animals, or property, due to incorrect installation, setting, or maintenance, or due to improper use. On removing thùe packing, check the integrity and completeness of the contents. Should any discrepancies be found, contact the dealer that sold you the equipment. The drain from the equipment s safety valve must be connected to an adequate collection and removal system. The manufacturer of this equipment is not responsible for any damage caused by the safety valve opening. For your safety, remember that: The boiler should not be used by children or people that are unable to use it properly. It is dangerous to activate devices or electrical equipment such as switches, domestic appliances, etc. if you smell any fuel or burning. Should a gas leak occur, ventilate the room by opening the doors and windows, shut the main gas valve, call in professionally qualified personnel from the Technical Assistance service immediately. Do not touch the boiler when barefoot or when parts of your body are wet or damp. Before cleaning, disconnect the boiler from the electricity mains by switching the bi-pole switch for the plant and the main switch on the control panel to OFF. Any modifications to the safety and regulating devices without prior authorisation or instructions from the manufacturer are forbidden. Do not pull on, disconnect, or twist the electrical cables that come from the boiler, even when it is disconnected from the electricity mains. Do not block up or reduce the size of ventilation openings in the room in which the unit is installed. Do not leave containers or inflammable substances in the room in which the equipment is installed. Do not leave any part of the packing within reach of children. During installation the user must be informed that: - Should any water flow out, they are to shut off the water supply and contact the Technical Assistance Service immediately. - The working pressure for the plumbing system must be between 1 and 2 bar, and must not exceed 3 bar. Where necessary, professionally qualified personnel from the Technical Assistance Service must be called in. - If the boiler is not to be used for a lengthy period of time, we recommend calling in the Technical Assistance Service to carry out the following operations: Switch the main switch for the equipment and the main switch for the entire plant to off. Close the taps on the water and the fuel supplies, for both the heating and the hot water systems. Empty the heating and hot water systems if there is any risk of freezing. - Maintenance must be carried out on the boiler at least once a year, and appointments must be made timeously with the Technical Assistance Service. 13

DESCRIPTION OF THE EQUIPMENT The Connect BASE is a water separator that is to be used with every boilers, where it separates the water in the generator and in the plant, when the latter is characterised by high flow rates that exceed those developed by the generator itself. It can also be used to manage mixed low and high temperature heating systems (radiators / fan coils and radiant panels). The Connect BASE unit can be built into the wall, thereby avoiding any protrusion, or it can be wall-mounted. 1 Automatic high limit thermostat low temperature system 2 Low temperature system pump 3 High temperature system pump 4 Mixing valve 5 Mixing bottle 6 Air discharge valve 7 High temperature system thermometer 8 Low temperature system thermometer 9 Electrical connection board TECHNICAL DATA Electrical power supply 230(±10%)-50 V-Hz Maximum power absorbed by the Connect BASE 220 W Temperature range for the mix valve 20 60 C Working temperature 0 +90 C Electrical protection level wall-mounted installation IP10D Electrical protection level built-in installation IPX4D Maximum pressure 3 bar DIMENSIONS AND WEIGHT DESCRIPTION L 440 mm P 160 mm H 616 mm NET WEIGHT 16 Kg 14

HYDRAULIC CIRCUIT E - Inlet (3/4 ) U Outlet (3/4 ) MD Delivery, direct system (3/4 ) Mmix Delivery, mixed system (1 ) Rmix Return, mixed system (1 ) RD Return, direct system (3/4 ) The maximum length of plumbing connections between the boiler and theconnect AT/BT unit must not exceed 15 m. U E MD Mmix Rmix RD 15

CIRCULATION UNIT The Connect BASE is fitted with two circulation units, the performance data to be used to size the system, is shown in the graph. When starting up for the first time, and at least once a year, it is advisable to check the pump units shaft rotate. This is necessary because, especially after lengthy periods of inactivity, deposits and/or residue may stop it rotating freely. Do not run the circulation units without water. Where present in low system flo regulator devices (thermostatic electrical or motorized zone valves) it is better to inster a by pass on the low temperature system collector. 5,5 CIRCULATOR RESIDUAL HEAD HIGH TEMPERATURE SYSTEM CIRCULATOR RESIDUAL HEAD LOW TEMPERATURE SYSTEM 5,0 4,5 4,0 residual head(m.c.a.) 3,5 3,0 2,5 2,0 1,5 1,0 0,5 1 2 3 residual head (m.c.a.) 1 2 3 0,0 0 200 400 600 800 1000 1200 1400 1600 1800 2000 1 - first speed 2 - second speed 3 - third speed Capacity (l/h) Capacity (l/h) 1 ( ) first speed with close mix valve 1 ( ) first speed with open mix valve 2 ( ) second speed with close mix valve 2 ( ) second speed with open mix valve 3 ( ) third speed with close mix valve 3 ( ) third speed with open mix valve WIRING DIAGRAMS Fusibile: Fuse NE: black BL: bleu MA: brown GI/VE: yellow/green RS: red 16

INSTALLATION OF THE APPLIANCE The Connect BASE can be wall-mounted or built-in, and can be located near the boiler or at a distance, provided the length of the plumbing and electrical connections between the boiler and the Connect BASE unit do not exceed 15 metres. The Connect BASE can be installed in positions exposed to the weather (rain, sun, ice, etc.) only if in built-in installation. Wall-mounted installation When the Connect BASE is wall-mounted it must be supported by two expanding wall anchors (supplied) that are suitable for the type of wall and weight of the equipment. We recommend using pipe sleeves built into the wall in order to limit the infiltration of water. These pipe sleeves are not supplied with the unit. Electrical protection level IP10D. Built-in installation When the Connect BASE unit is built-in: - Provide the building work, complete with a niche of suitable size for the Connect BASE, to suit the thickness of the wall (minimum indicative dimensions shown in the figure). - Position the Connect BASE in position, and remember to open out the two support lugs to fix it more securely. - Protect the side edges and front while building in the device. Since the plumbing and electrical connections between the system and the Connect BASE must be contained within the overall size of the device itself, first position the Connect BASE and then the entry and exit pipes for the system and the conduiting for the electric cables. Electrical protection level IPX4D. lug 17

TYPICAL INSTALLATION LAYOUT The figure alongside shows a possible way of installing the Connect BASE. NOTE: To allow for installing taps (not supplied) a niche must be formed of sufficient size to allow them to be fitted below the Connect BASE itself. 18

HYDRAULIC CONNECTIONS Before forming the connections all the piping must be thoroughly flushes to remove any residue that could compromise the proper functioning of the Connect BASE. The plumbing connections to the boiler and the system must be carried out rationally, as indicated in the figure. Direct connections can be formed using the female couplings on the delivery and return pipes for the Connect BASE, or taps (not supplied) can be fitted on the lines for shutting off the lines. These taps are very useful when maintenance is carried out, as they allow the Connect BASE to be drained without having to drain the entire system. Check that the expansion vessel on the boiler has sufficient capacity for the size of the system. Once the Connect BASE has been installed, the 2 ramps supplied (along with their seals) that interface with the boiler centres (see drawing) must be fitted inside the Connect BASE. TA1 ambient thermostat TA2 ambient thermostat TA boiler Low temperature system (mixed) 230 V~ 50 Hz High temperat. system SE External sensor 19

ELECTRIC CONNECTIONS To form the electrical connections for the Connect BASE, access must be obtained to the Connect BASE and the boiler card. To gain access to the Connect BASE: - Remove the front cover panel from the Connect BASE (fig. 1). Fig. 1 CONNECTING THE CONNECT BASE TO THE ELECTRICITY MAINS Connect BASE unit to the electricity mains (phase /neutral / earth) using the cable supplied. Drawing the power supply for the Connect AT/BT from theboiler is absolutely forbidden as the boiler s fuse is not sizedto take the electrical loads associated with the Connect AT/BT. 4 7 F N T CONNECTING THE AMBIENT THERMOSTATS (TA) The TAs for the low and high temperature system must be directly connected to the CONNECT BASE (fig. 2) using a cable with minimum section 1 mm 2. The pump power load will be direclty supported by the related TA, therefor the TA connection must be adequately designed for this application and compatible with the electrical features of the pumps (it is recomm nded not lower than 230 Vac 50 Hz 6A). Fig. 2 Fig. 3 T P2 P1 C T L T L TA C H2 TA C H1 T A C CONNECT BASE CONNECTION TO THE BOILER Connect the Connect BASE socket B-B (fig. 3) to boiler TA socket using a min 2x0,5 mm 2 cable (refer to the electric diagram on the boiler instrucion manual). 1 B B 4 7 F N T When using a phase-phase power supply, use a tester to determine which of the two wires has the greater potential compared to the earth and connect it to the L terminal. Connect the remaining wire to the N terminal. For floating power supplies, that is, those that have no earth connection, an insulation transformer must be used, with a secondary unit connected to the earth. The following are obligatory: - A multi-pole trip-switch must be used to disconnect the line, that conforms to the CEI-EN standards (contact opening at least 3 mm). - Use cables with a 1,5 mm 2 section and respect the L (Phase) N (Neutral) connection. - The amperage on the switch must be adequate for the boiler s electrical power rating see the technical data to check the electrical power rating for the model installed. - Connect the equipment to an efficient earthing system. - The power socket must be inaccessible after installation. The use of gas or water pipes to earth this equipment is forbidden. The manufacturer does not accept any responsibility for any damage caused due to the lack of a proper earth or failure to comply with the wiring diagram. 20

3 FIRST STARTING UP Before switching the Connect BASE on, check that the electrical and plumbing connections have been formed correctly. During testing, the temperatures can be checked due to the two thermometers shown in the figure. CIRCULATION PUMPS The Connect BASE is supplied with circulation units with a threespeed control. Choose the best speed to suit the specific characteristics of the systems. RELEASING THE PUMPS IF NECESSARY If the unit has been inactive for a lengthy period of time and the circulation units are stuck, unscrew the caps on the front and turn the shaft for the circulation unit motor using a screwdriver. Do this extremely carefully so as not to damage the components themselves. LOW TEMPERATURE APPLIANCE SETTING Fix low appliance s flow temperature regulationg the mix valve manually referring to the following table : POS MIN 1 2 3 4 5 6 7 MAX T ( C) 20 25 30 35 40 45 50 55 60 4 5 Ref. with inlet mix valve temperature= 80 C HIGH TEMPERATURE APPLIANCE SETTING Fix the boiler central heating knob to the high temperature appliance desidered value. CHECKS AFTER INSTALLATION - Check that the heating system is pressurised. - Check that the main switch for the plant works. - Check the plumbing circuits for leaks. - Check that the plumbing and electrical connections are correct. - To call for heat from a mixed system, check that the mixing valve opens and closes correctly. If even one of these checks provides a negative result, the system must not be started up. CLEANING Before cleaning the Connect BASE in any way disconnect the mains power supply by switching the main switch to OFF. The panels must be cleaned with a cloth, using soap and water. If stubborn stains are found, use a cloth with a 50% water and denatured alcohol mixture, or use specific products. Once cleaning is complete, dry carefully. Do not use abrasive products, benzene, or trichloroethylene. 21