November 11, City of Sparks 215 S. 21 st St. Sparks, NV

Similar documents
A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

Virginia Tech Standards for Building Automation System

UNIFIED FACILITIES GUIDE SPECIFICATIONS

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

Job Name Control Systems Description Date

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

HVAC Controls Upgrades: Requirement Details ( )

DDC POINT LIST. 004 Harry Griffith Hall. RFP #PW17-2 Exhibit J Page 1 of 9 AHU 1 BOILER BOX DUAL DUCT MIXING. Building: HUMBOLDT STATE UNIVERSITY

SEQUENCE OF OPERATIONS

Computing Services Center

SUBJECT: Effective Date: Procedure Number:

BULLETIN. Temperature Controls (Chilled / Hot Water)

REQUEST FOR PROPOSALS FOR THE PROVISION OF PREVENTIVE MAINTENANCE ON FACILITY HVAC SYSTEMS FOR SKOKIE PUBLIC LIBRARY

HVAC Controls Upgrades: Requirement Details ( )

Direct Fired Heater Model AD Specification

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

Florida Department of Transportation

University of Houston Master Construction Specifications Insert Project Name

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

VariCool VAV Engineering Guide

Continuous Commissioning: A Valuable Partner to Retrofit Projects

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO.

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET

Modular Supply Make-Up Air Unit

LGH/LCH WARNING. CAUTION Danger of sharp metallic edges. Can cause injury. Take care when servicing unit to avoid accidental contact with sharp edges.

BULLETIN. Temperature Controls (10/2013)

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)

Field Start-Up Sheet Direct Fired Gas Equipment

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

Building Automation System (BAS) Design Criteria

American University Design Standards

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION

15900 HVAC INSTRUMENTATION AND CONTROLS

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

June Copyright Climatec

CxA to Answer this Section

Technical Assignment 3 11/15/04. Executive Summary

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

1.1 This section applies to air handling units for HVAC Systems.

Building Automation System

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

SECTION ENERGY MANAGEMENT SYSTEM (EMS)

4. OVERVIEW OF MECHANICAL SYSTEM

AHU Air Handling Unit Fundamentals. j.ilangumaran

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

TESTING, ADJUSTING AND BALANCING

Advance Release September 2009

COMcheck Software Version Review Mechanical Compliance Certificate

SECTION AIR DUCT ACCESSORIES

Civil Engineering Building

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

GARCIA GALUSKA DESOUSA Consulting Engineers

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

A. General: Refer to paragraph entitled "SUBMITTAL" in Section Include the following data:

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

Tenant Design Criteria Section t Technical Criteria Updated: October Chain Bridge Road, Suite 105 Tysons Corner, VA 22102

NEW CHILLER SCHEDULE

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

Student Services & Classroom Addition. Cranford, New Jersey SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

FUNCTIONAL DESIGN SPECIFICATION

Summary Comparison of Simulation Program Features

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

VertiCool CLASSIC. Engineering Guide. Effective March Air-Cooled, Water-Cooled, Chilled Water and Water Source Heat Pump

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

Integrated Automation Instrumentation & Terminal Devices

DISTRIBUTION SYSTEMS. Water Piping and Pumps

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS SERVICE OPTION DIMENSION PRINTS

DIVISION 15 MECHANICAL

b.) Technical Information:

Transcription:

November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of Sparks Facilities System Dear Brian, We propose to furnish labor, materials and tools for the Alerton Direct Digital building management HVAC control system as indicated in MMI Engineering Mechanical plans dated 9/26/14 and instrument and controls specification section #230900 as follows: Addendum #1 through #3 were also noted. BASE BID-BUILDING 100 and 400: ITEM #1: GLOBAL CONTROL SYSTEM: 1. Alerton ACM global control module. 2. Connect to existing Alerton server connected to City of Sparks information technologies network. 3. Programming and set-up. 4. Remote access set-up. 5. Dynamic graphical displays. ITEM #2: HOT WATER CENTRAL PLANT CONTROL: 2. Global outside air temperature sensor. 3. Boiler #1 hot water supply temperature sensor. 4. Boiler #2 hot water supply temperature sensor. 5. Building hot water supply temperature sensor. 6. Building hot water return temperature sensor. 7. Boiler system enable control. 8. Boiler system HW reset control. 9. Boiler #1 and #2 status control. 10. Boiler #1 and #2 alarm control. 11. Boiler #1 and #2 primary hot water pump interlocks. (BP#1 and BP#2) 12. Boiler #1 and #2 BacNet interface. 13. Hot water loop differential pressure transmitter. 14. Hot water loop secondary pump VFD start/stop control. (BP#3 and BP#4) 15. Hot water loop secondary pump VFD speed control. (BP#3 and BP#4) 16. Hot water loop secondary pump VFD status control. (BP#3 and BP#4) 17. Hot water loop secondary pump VFD alarm control. (BP#3 and BP#4) 18. Boiler emergency shutdown switch monitoring. Note: Boiler emergency shutdown switches are to be provided, installed and wired by electrical contractor. (Refer to addendum #3, plan #E2.3, sheet note #3.). 19. Low voltage control wiring, raceways and terminations. 20. Programming and set-up. ITEM #3: CHILLED WATER SYSTEM CONTROL:

2. Chiller #1 supply chilled water temperature sensor. 3. Chiller #1 return chilled water temperature sensor. 4. Building supply chilled water temperature sensor. 5. Building return chilled water temperature sensor. 6. Chiller #1 start/stop control. 7. Chiller #1 status control. 8. Chiller #1 alarm control. 9. Chiller #1 chilled water set point reset control. 10. Chiller #1 BacNet interface. 11. Chiller #1 emergency shutdown switch interlock. 12. Chilled water differential pressure transmitter. 13. Primary chilled water pump start/stop control. (CHWP #1 and CHWP #2) 14. Primary chilled water pump status control. (CHWP #1 and CHWP #2) 15. Secondary chilled water pump VFD start/stop control. (CHWP #3 and CHWP #4) 16. Secondary chilled water pump VFD speed control. (CHWP #3 and CHWP #4) 17. Secondary chilled water pump VFD status control. (CHWP #3 and CHWP #4) 18. Secondary chilled water pump VFD alarm control. (CHWP #3 and CHWP #4) 19. Free cooling heat exchanger HX-1 chilled water change over 3way control valve. ITEM #3: CONDENSER WATER SYSTEM CONTROL: 2. Chiller #1 supply condenser water temperature sensor. 3. Chiller #1 return condenser water temperature sensor. 4. Condenser water pump CWP-1, CWP-2 start/stop control. 5. Condenser water pump CWP-1, CWP-2 status control. 6. Cooling tower CT-1 fan VFD start/stop control. 7. Cooling tower CT-1 fan VFD speed control. 8. Cooling tower CT-1 fan VFD status control. 9. Cooling tower CT-1 fan VFD alarm control. 10. Cooling tower CT-1 fan vibration switch monitoring. Note: CT-1 vibration switch monitoring. 11. Free cooling heat exchanger HW-1 condenser water change over 3way control valve. 12. Chiller condenser water 3-way bypass control valve. (To be controlled by chiller.) 13. Low voltage control wiring, raceways and terminations. 14. Programming and set-up. ITEM #5: CHILLER ROOM VENTILATION CONTROL: 1. Alerton VLC-DDC controller. 2. Refrigerant detector. 3. Supply and exhaust fan start/stop control interlocks. 4. Chiller shutdown interlock with refrigerant detector. 5. Low voltage control wiring, raceways and terminations. 6. Programming and set-up. ITEM #6: AIR HANDLER #1 CONTROL (Existing AHU): 2. Supply and Return fan VFD start/stop control. 3. Supply and Return fan VFD speed control. 4. Supply and Return fan VFD status control.

5. Supply and Return fan VFD alarm control. 6. Supply air temperature sensor. 7. Return air temperature sensor. 8. Mixed air temperature sensor. 9. Duct freeze thermostat. 10. Supply high duct pressure switch. 11. Return air CO² sensor. (1 total.) 12. Duct static pressure transmitter. 13. Building static pressure transmitter. 14. Hot water control valve and actuator. 15. Chilled water control valve and actuator. 16. Economizer damper actuators. (Control dampers by equipment manufacturer.) 17. Duct smoke detector shutdown interlock. (Duct smoke detectors by others.) 18. Low voltage control wiring, raceways and terminations. 19. Programming and set-up. ITEM #7: VAV TERMINAL UNIT CONTROL (40 total): (VAV1-1 thru VAV1-1-35/VAV-4-1 thru VAV4-6): ITEM #8: SERVER ROOM / LIEBERT SPLIT AC UNIT CONTROL: 1. Installation and wiring of equipment factory provided thermostat. 2. Low voltage control wiring, interlock between indoor unit and outdoor condensing unit. 3. Alerton VLC-DDC controller. 4. Alerton VLC-DDC room temperature sensor. 5. Alerton VLC-DDC supply air temperature sensor. 6. Low voltage control wiring, raceways and terminations. 7. Programming and set-up. ITEM #9: VARIABLE FREQUENCY DRIVE UNITS: 1. AHU-1 supply fan VFD. (20hp, 480v) 2. AHU-1 return fan VFD. (7.5hp, 480v) 3. CHWP-3 pump VFD. (7.5hp, 480v) 4. CHWP-3 pump VFD. (7.5hp, 480v) 5. HWP BP-3 pump VFD. (7.5hp, 480v) 6. HWP BP-4 pump VFD. (7.5hp, 480v) 7. CT-1 cooling tower fan VFD. (10hp, 480v) Note: VFD be Nema 1 rated without bypass, disconnects, line reactors, load reactors, etc. VFD s to include a 2 year warranty. ITEM #10: INCIDENTAL ITEMS: 1. Eight (8) hours on-site training. 2. Submittals, O&M s and as-built wiring. 3. Coordination.

4. Programming and graphics. EXCLUDED: 1. Power wiring, power conduit, installation of VFDs, starters, disconnects, fuses, etc. 2. Motors, sheaves, belts, etc. 3. Equipment, equipment start-up, repairs, modifications, etc. 4. Installation of control valves, temperature sensor wells, pipe taps, etc. By Mechanical contractor. 5. Control dampers, damper linkages, jack-shafts, etc. By mechanical contractor. 6. Duct smoke detectors. 7. Fire/smoke dampers. 8. Power wiring, to control panels and VAV terminal unit control transformers-by electrical contractor. 9. Equipment Bacnet controllers. (Boilers and chillers) By equipment manufacturers. 10. Thermometers, gauges, magnehlic gauges, etc. 11. Cooling tower vibration switches, level controls, sump heaters, sump heater controls, etc. By equipment manufacturer. 12. Isolation valves, balancing valves and PT ports. By mechanical contractor. 13. VAV terminal unit control dampers, velocity air flow sensors, coils, and control enclosures. By equipment manufacturer. 14. Network IT data drop connection and addressing. By owner. 15. Computers, printers, fiber-optic cabling, Ethernet wiring, routers, servers and software. 16. Asbestos and lead related work. 17. Moving of furniture. 18. Overtime or weekend/holiday work. 19. Permits and fees. 20. Payment and performance bonds. For the Base Bid, we ask the sum of...$284,480.00 ALTERNATE #1: (Building 300 West): ITEM #1: Air Handler #3 Control (New AHU): 14. Duct static pressure transmitter.

ITEM #2: VAV Terminal Unit Control: (9 total) (VAV3-1 thru VAV3-9): For Alternate #1 (Bldg 300) we ask the sum of.$49,820.00 ALTERNATE #2: (Building 300 East): ITEM #1: Air Handler #2 Control (New AHU): 14. Duct static pressure transmitter. ITEM #2: VAV Terminal Unit Control: (9 total) (VAV3-10 thru VAV3-18): For Alternate #2 (Bldg 300) we ask the sum of.$49,820.00

ALTERNATE #3: (Building 200 West): ITEM #1: Air Handler #5 Control (New AHU): 14. Duct static pressure transmitter. ITEM #2: VAV Terminal Unit Control: (7 total) (VAV2-1 thru VAV2-7): For Alternate #3 (Bldg 200) we ask the sum of.$44,366.00 ALTERNATE #4: (Building 200 East): ITEM #1: Air Handler #4 Control (New AHU):

14. Duct static pressure transmitter. ITEM #2: VAV Terminal Unit Control: (7 total) (VAV2-8 thru VAV2-14): For Alternate #4 (Bldg 200) we ask the sum of.$44,366.00 PRICING SUMMARY: Base Bid (Bldg 100 and 400)..$284,480.00 Alternate #1 (Bldg 300, West)... $49,820.00 Alternate #2 (Bldg 300, East)... $49,820.00 Alternate #3 (Bldg 200, West).. $44,366.00 Alternate #4 (Bldg 200, East)... $44,366.00 TOTAL for Base Bid, Alt-1, 2, 3 and 4.....$472,852.00 ** ADD 1.1% for payment and performance bond, if required** This proposal is subject to change sixty (60) days from date of proposal. Pay terms shall be Net thirty (30) from date of invoice. BCS reserves the right to require payment in advance or other alternative method of payment prior to shipment [completion of work] if BCS determines, in its sole discretion, that the Buyer's financial condition at any time does not justify continuance of the Net thirty (30) days payment terms. In all other respects, this quotation shall be subject to the terms and conditions as outlined on the reverse side or attached page(s) of this proposal and are in lieu of any terms that may appear on any purchase order issued. Please do not hesitate to call if you have any questions regarding this proposal. Sincerely, Tom Hulbert Building Control Services, Inc. Accepted By/Date: