Water Efficiency Ordinance ZCA No El Monte City Council June 7, 2016

Similar documents
Update on the State of California Model Water Efficient Landscape Ordinance (CA MWELO)

OC DEVELOPMENT SERVICES REPORT. Public Hearing Proposed Zoning Code Amendment CA County of Orange Landscape Irrigation Code

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

least as effective as" requirement of state law, minimize the complexity and cost of compliance, and provide consistency between local jurisdictions.

ORDINANCE NO. 430 REGARDING WATER CONSERVATION

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES

Landscape Ordinance. Ordinance

CITY OF LOS BANOS LANDSCAPE PLAN REVIEW PROCEDURE. Public Works Department 411 Madison Avenue, Los Banos, CA FOR ALL PROJECTS:

Sandwich Community Fire Protection District. Plan Review Submittal Guidelines and Requirements

2016 California Building Code Adoption OC amendments Summary Title/Subject Justification/Comments Action

CITY OF EL MONTE Water Efficient Landscape Ordinance Documentation Package Chapter Water Efficiency Ordinance El Monte Municipal Code (EMMC)

ORDINANCE NO. SECTION 1. This ordinance, due to its length and corresponding cost of

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

PERFORMANCE APPROACH (For landscape areas over 2500 square feet)

Prepared by: Casey Kempenaar, Senior Planner

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

Historic Resources. San Mateo has a Historic Building Survey that identified roughly 200 historically significant

Chapter 1. Introduction

CITY OF LOMPOC PLANNING COMMISSION STAFF REPORT

Understanding the Varying Viewpoints of the Water Utility Provider and Landscape Contractor

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE

City Council Report 915 I Street, 1 st Floor

REPORT TO COUNCIL City of Sacramento

PRESENTERS OVERVIEW COMMUNITY WORKSHOP OVERVIEW OF THE 2010 EDITION OF THE CALIFORNIA BUILDING STANDARDS CODE AND LOCAL AMENDMENTS

Agenda Report DESIGNATION OF 1855 E. COLORADO BOULEVARD (FORMER DRAPER'S BUILDING) AS A LANDMARK

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS

AGENDA 07/14/11 PLANNING COMMISSION Meeting

Design Review Commission Report

COUNTY OF EL DORADO DEVELOPMENT SERVICES PLANNING COMMISSION STAFF REPORT SPECIAL USE PERMIT

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

CIVIL ENGINEERING PERMIT APPLICATION

2. Building Code Permits and Related Fees 2018

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

BULLETIN. Permitting Tips (11/10)

Steering Committee Meeting

CHAPTER Committee Substitute for Committee Substitute for Committee Substitute for House Bill No. 973

Work Plan. Introduction:

PERFORMANCE GOALS 5 RESPONSIBILITIES 6 M=manufacturer. Y Recommended based on recycling rate

West Chester Borough Stream Protection Fee (SPF) Overview

Project phasing plan (if applicable) 12 copies of site plan

Highway Oriented Commercial Development Criteria

CHAPTER 12 IMPLEMENTATION

GENERAL PLAN UPDATE ISSUES MEETING. January 21, 2010 City Hall Mitchell Room 6:00 pm 9:00 pm

Glenborough at Easton Land Use Master Plan

Florida Senate SB 982 By Senator Bennett

SECTION REGULATORY REQUIREMENTS. A. Relationship between Code, Ordinances, Standards and Contract Documents

ORDINANCE NO. City of Bellingham City Attorney 210 Lottie Street Bellingham, Washington INFILL HOUSING ORDINANCE Page 1

DEVELOPMENT ADVISORY Number: 6 April 25, 2008

Irrigation and Landscape Regulations

3. Are there any projects exempt from the definition of Regulated Projects?

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

Landscape Documentation Package Review

GUIDELINES FOR IMPLEMENTATION OF THE CITY OF ANAHEIM LANDSCAPE WATER EFFICIENCY ORDINANCE

DESIGN REVIEW COMMITTEE AGENDA ITEM

New Rehabilitated Area (ft 2 ) Private Homeownerinstalled

RRW Stonebrook, LLC Tentative Map Findings

GUIDELINES FOR IMPLEMENTATION OF THE CITY OF LA HABRA WATER EFFICIENT LANDSCAPE ORDINANCE

IC Chapter Severe Weather Warning Sirens

The Model Water Efficient Landscape Ordinance

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013

Turf Removal Rebate Program Requirements

DRAFT Ordinance No. 16.XXXX

Public Works and Infrastructure Committee Front Yard Parking Regulations. Transportation Services. June 8, 2017

Planning Commission Application Summary

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

Water Conservation Rebate Requirements

7:00 P..M. CITY OF EL MONTE PLANNING COMMISSION OPENING OF MEETING. Disclosures. so at this. and. given the. by staff. address at the. 7.

Highlands Region Stormwater Management Program Guidance

ORDINANCE NO. BE IT ORDAINED, by the City Council of the City of. Section 1. That [Chapter, Article Division, of the

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

ARLINGTON COUNTY, VIRGINIA

RESIDENTIAL MULTI-USE FIRE SPRINKLER SYSTEMS PERMIT SUBMITTAL REQUIREMENTS

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Sun City Lincoln Hills ARC Application Checklist

REQUEST FOR COMMENTS Issued January 5, 2018

LANDSCAPE DOCUMENTATION PACKAGE SUBMITTAL FORM To be completed by applicant and submitted with the required materials.

Open House Schedule min to Visit Stations, Ask Questions and Contribute Your Thoughts min Presentation

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

Fire Flow Requirements Standard

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

4/8/2015 Item #10D Page 1

ORDINANCE NO. WHEREAS, landscape design, installation, maintenance and management can and should be water efficient; and

The NYS Electronic Equipment Recycling & Reuse Act

SUBMITTAL REQUIREMENTS

RESIDENTIAL FIRE SPRINKLER SYSTEMS POLICY

City of Placerville Planning Commission AGENDA REPORT ITEM 7

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

City of Fort Lupton Site Plan Process

Stormwater Control Plan: Small (Tier 1) Land Development Project

DATE: PLANNING COMMISSION MEETING OF FEBRUARY 24, 2016

Eco-Roof Incentive Program application: 77 Glen Rush Boulevard

Planning Commission Report

Metairie Ridge Tree Preservation District Tree Removal Application Jefferson Parish Department of Inspection & Code Enforcement 7/31/13

PLANNING COMMISSION AGENDA REPORT. Members of the Planning Commission. Andrew Cohen-Cutler, Associate Planner

Transcription:

Water Efficiency Ordinance ZCA No. 750 El Monte City Council June 7, 2016

Background In California, about half of the urban water is used for landscape irrigation. Assembly Bill (AB) 1881 in 2006 required the State of California Department of Water Resources (DWR) to update the State s Model Water Efficient Landscape Ordinance (MWELO). State MWELO was first adopted in 2009. El Monte Municipal Code updated in 2010. On April 1, 2015, Governor authorized the State Water Resources Control Board to establish regulations to increase water efficiency and update the MWELO. 2

Planning Commission Planning Commission Hearing May 10, 2016. o Unanimously recommended City Council approve draft Ordinance. Comments and Recommendations o Provide additional information regarding the Prescriptive Compliance Option. o Invite local nurseries, hardware retailers, and landscape contractors to workshops. o Produce additional handouts for public. o Request to revise Section 17.11.100(a)(2)(D) of the EMMC Pool and spa covers are highly recommended to read Pool and spa covers shall be used when pool or spa is not in use to minimize the loss of water due to evaporation. 3

When Does Ordinance Apply? The City of El Monte needs to establish city-wide water conservation regulations for new projects that are at least as effective as the State. New development projects that include landscape areas of 500 sf or more are subject to the Ordinance (previously at 2,500 sf). This includes new buildings and additions to existing buildings. o Projects with landscape areas of 500 to 2,500 sf may comply with a simplified landscape plan submittal through the Prescriptive Compliance Option. The size threshold for existing landscapes that are being rehabilitated has not changed (2,500 sf). 4

Significant Revisions More Efficient Irrigation Systems than Currently Required. Incentives for Gray Water Use. Improvements in Onsite Storm Water Capture. Limiting the Portion of Landscapes that can be Planted with High Water Use Plants such as Cool-Season Turf. Annual Reporting Requirements. Prescriptive Compliance Option for Landscape Areas of 500 to 2,500 sf. Soil Management Report Requirement. Expanded Definitions Section. Increased Requirements for Irrigation Design. 5

Review Process 1) Type of Project: New Development or a Rehabilitated Landscape. New development projects with 500 sf of landscape or rehabilitated landscape projects with 2,500 sf of landscape. 2) Plan Submittal: General Compliance: Projects with landscape areas of 2,500+ sf will need to achieve General Compliance. Plans must be designed by a registered landscape architect or licensed contractor. Prescriptive Compliance Option: Projects with landscape areas of 500 to 2,500 sf may comply with a simplified landscape plan submittal through the Prescriptive Compliance Option. Most plans may be designed by a qualified person (e.g. landscape designer). Installation is required to be conducted by a C-27 licensed landscaper. 6

Review Process Continued 3) Submitting the Water Efficient Landscape Documentation Package The project applicant shall submit the package to the Planning Division for initial review: a. Water Efficient Landscape and Irrigation Application; b. Water Efficient Landscape Worksheet; c. Soil Management Report; d. Landscape Design Plan; e. Irrigation Design Plan; f. Grading Design Plan; g. Drainage Plan; h. Certificate of Completion; and i. Prescriptive Compliance Option. 7

Review Process Continued 4) Certificate of Completion Requirement: The project applicant submits the signed certificate to the City s Planning Division (i.e. plans meet MWELO requirements). 5) Issuing Permits and Completing Inspections: Prescriptive Compliance Option: o Planning approves the plans and document package. o Building Division completes inspections. General Compliance: o Planning reviews the plans and document package for completeness. o Building completes a comprehensive review and complete inspections. 6) Submitting the Annual Report: The City will report to the State Department of Water Resources. 8

Climate Appropriate Plants USDA Plant Hardiness Zone 10a Sunset Climate Zone Zone 20 9

Landscape Design Deficiencies 10

Landscape Design Sustainable 11

Water Efficient Landscapes 12

Public Outreach Host a public workshop, invites to include: o Landscape architects and contractors o Local nurseries o Hardware and landscape supply retailers Include information about the Ordinance in the City s quarterly Newsletter; Post information about the Ordinance on the City s website homepage; Issue a press release; and Develop and distribute informational handouts for the public counter. 13

Fiscal Impact Applicant will cover all costs in preparing the plans and submittal requirements contained in the Landscape Documentation Package. Applicant will cover all costs associated with the Certificate of Completion. Applicant to cover all fees for Landscape and Irrigation Review and field inspections: o Combined with any fees paid to the Building Division. o Fees are based on the total amount of area being landscaped. o Fees include surcharge to cover City staff time. o Fees are significantly less for projects that are eligible for the Prescriptive Compliance Option. City to cover Planning staff time to review documentation package (approx. 2 hours) and general time to provide assistance at counter. Property owners to benefit from long term cost savings through reduced water usage and maintenance. 14

Staff Recommendation Adopt a Categorical Exemption under Sections 15307, 15308, and 15061 (b)(3) of the CEQA Guidelines, as amended; and Recommend that the City Council approve Code Amendment No. 750. 15

Questions/Recommendations 16