Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Similar documents
2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

PLATTEVILLE MIDDLE SCHOOL

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

PLAN REVIEW SUBMITTAL GUIDE

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

DOMESTIC WATER PACKAGED BOOSTER PUMPS

Mechanical Inspection Plumbing

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS

GARCIA GALUSKA DESOUSA Consulting Engineers

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Joseph Brennemann Elementary School

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Edward Jenner Elementary Academy of the Arts

Charles W Earle Elementary School

Agustin Lara Elementary Academy

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Florence High School / Middle School Page 1 of 3 Florence, WI

Page 1 of General

Vanilla Box Design Criteria

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

Richard Henry Lee Elementary School

DRAFT. Widen Elementary School Site Summary 74,523 SF. Introduction

S AGE E NGINEERING A SSOCIATES, LLP

RECAPP Facility Evaluation Report

Josefa Ortiz De Dominguez Elementary School

1225 TUNNEL ROAD PERKASIE BOROUGH, BUCKS COUNTY, PA

RECAPP Facility Evaluation Report

Washington Irving Elementary School

RECAPP Facility Evaluation Report

Appendix B. Facilities Assessment Report

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

Comprehensive Inspection Agency (CIA) RESIDENTIAL & COMMERCIAL FEE SCHEDULE

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

RECAPP Facility Evaluation Report

Oscar DePriest Elementary School

Calmeca Academy of Fine Arts and Dual Language

DOCUMENT TABLE OF CONTENTS

Genevieve Melody Elementary School

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

Francis M McKay Elementary School

RECAPP Facility Evaluation Report

John Palmer Elementary School

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

RECAPP Facility Evaluation Report

Facility Improvements

RECAPP Facility Evaluation Report

Alessandro Volta Elementary School

COVIDIEN SENECA, SOUTH CAROLINA

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report

Axiom Property Inspections

RECAPP Facility Evaluation Report

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

Unit # E ± 1,200 SF Width ± 20' Depth ± 60'

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc

Inspection Report 123 My Street Midland, GA

CHAPTER 7 ALTERATIONS LEVEL

SPACE TYPE: JUDICIAL CHAMBER

California Community Colleges

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Electrical Design Guidelines Table of Contents

Comprehensive Inspection. (CIA) RESDENTAL & COMMERCIAL

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

DMTF: Specific Building Recommendations

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

NYC Department of Education

Element Z General Design Requirements Existing Facilities Information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

4. Plumbing fixtures. a) The plumbing fixtures are from the original building. They are appear old and not to comply with ADA requirements.

Ashland School District Facility & Capacity Assessment Report 2005

NYC Department of Education

FOR LEASE ROCKWOOD OFFICE PARK

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60'

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

DeWitt Clinton Elementary School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

Nebraska Department of Correctional Services

NYC Department of Education

All Around Home Inspections Ltd 1346 Hurford Ave Courtenay, BC. 123 Sample 6 Plex

AFFORDABLE CANADIAN HOME INSPECTIONS

RECAPP Facility Evaluation Report

NYC Department of Education

Food Establishment Guidelines. Food Service Plan Review

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

Electrical Information

Lincoln Public Schools

PREPARED FOR: (Name of Client) CONCERNING: (Address of Property) BY: P Home. YOUR HOME CHECK 1305 FM 359, Suite G F

Transcription:

Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6 604-685-3757 July, 2011

NE6 - Plumbing and Pipefit Building

Post BCIT Secondary Institution: Campus: BCIT Burnaby Asset Name: NE 6 - Plumbing & Pipefit Asset Number: NE6 STATISTICS FCI Cost: 1,819,863 FCI: 0.50 Total Requirements Cost : 1,869,836 RI: 0.52 Current Replacement Value 3,615,858 Address 1 3700 Willingdon Avenue Size 2,571 SM Address 2 - Year Constructed 1961 City Burnaby Year Renovated - State/Province/Region British Columbia Commission Date - Zip/Postal Code V5G 3H2 Decommission Date - Architect - Ownership Client Owned Historical Category None Floors 1 Construction Type IBC - Type 1B Type Building Use Classroom / Training PHOTO NE 6 - Plumbing & Pipefit NE 6 - Plumbing & Pipefit ASSET DESCRIPTION ARCHITECTURAL General The NE6 building, is within the British Columbia Ministry of Advanced Education and is part of College of the BCIT (British Columbia Institute of Technology) in Burnaby's campus. It is located at 3700 Willingdon Avenue Burnaby, BC. Originally built on this site in 1961 with 2,571 SM of space. The facility is composed of a one level building with mezzanino used for classroom, office and storage. Substructure Page 1 of 5

The substructure construction of the building features concrete perimeter foundation walls on reinforced concrete strip footings. The facility has a concrete slab on grade. Superstructure The building has both load bearing CMU's wall and steel frame construction, sloped steel open web joist with concrete filled steel pan for the mezzanine floor framing and steel decking for roof framing. Exterior Construction Exterior walls at NE6 building includes metal cladding finishing s construction. Exterior windows are single glazed metal framed assemblies. Entry doors are typically either glazed / unglazed hollow metal assemblies. The roof includes metal roof system covering. Interior Construction Floor finishes throughout the facility are vinyl composite tiles, ceramic tiles and concrete floor. Restrooms/change rooms generally have ceramic tiles walls finish. Wall finishes are painted gypsum wallboard and painted block. The ceiling finishes are generally 600 x 1200 ACT or no finish (open to roof structural components). The interior doors are finished solid core wood assemblies, some with glazed panels. Interior door hardware is typically a combination of knob with panic hardware where required at exterior door fire exit locations. Accessibility The building is not considered barrier free per the requirements of section 3.8 Building Requirements for Persons with Disabilities of the 2006 British Columbia Building Code. Occupancy Type According to the 2006 British Columbia Building Code, Article 3.1.2.1. (1), the NE6 building is classified as an Assembly Group A, Division 2 occupancy. MECHANICAL BCIT Plumbing and Pipe fit NE06 HVAC Heating for the plumbing shop building is supplied by main hot water line coming from water heating boiler station. Hot water is distributed to the perimeter heat system, staff offices and washrooms. Ventilation and heating is provided by two 5000 CFM air handing units with two supply fans manufactured by REZNOR, one of them installed inside the room 110 and another installed on rooftop of gas lab room. Cooling is provided by five A/C units installed in room M107, M125, 222, 204 and 207. Heating is provided by 6 gas-fired Infrared tube heaters hung in workshop ceiling manufactured by REVERBE RAY Company. Heating for some office spaces and some classroom spaces are also provided by perimeter hydronic fin tube heaters. Exhaust fans are provided for the washrooms and staff rooms. The building management system includes Direct Digital Control (DDC) installed in 2005. PLUMBING A four inches domestic cold water service enters the building. Piping is distributed to all plumbing fixtures and hose bibs. Domestic hot water is produced by one 75 gallons tank Lochinvar Corporation heat exchanger located in the plumbing workshop. The heat exchanger equipped with a temperature, pressure and safety instruments. Plumbing fixtures includes vitreous china water closets, urinals and lavatories in the washrooms; custodial service sinks in the service room. The building sanitary waste piping system with gravity discharge flows to the main campus system. Page 2 of 5

Rainwater is collected in gutters with downspouts which discharge directly to the ground. Natural gas is distributed to the gas-fired Infrared tube heaters. FIRE PROTECTION The fire protection systems include a wet fire sprinkler system serving the building. There is a Siamese fire hose connection for the fire fighters. Numerous handheld fire extinguishers are located throughout the building to supplement the fire suppression system. ELECTRICAL Main Electrical Service The building contains a 12.47kV, single-ended unit substation (SUB J). The system includes incoming feeders, a 15kV disconnect switch, and one 1000kVA 12.47kV-480/277V transformer. A 1600A-480/277V (3-ph 4-wire) switchgear provides the circuit breaking for the building. The switchgear includes metering. All equipment is located along the exterior of NE06. Electrical Service and Distribution Downstream electrical distribution is handled by panelboards distributed throughout the building. Branch Wiring Devices The branch wiring for this building includes a heavy concentration of interior branch wiring, electrical devices, conduit, wire, safety switches, cable trays, and utilization equipment. Lighting The building includes a lighting system with a variety of fixtures. The shop area has 300x1200mm suspended fluorescent lights. There are no lenses with these lights. The office and class areas have recessed 600x1200mm fluorescents. The exterior perimeter lighting consists of HID mounted in the wall. Telephone System The building includes a telephone system which includes conduit, cable, switches, punch panels, and head end equipment. Fire Alarm System This building includes a fire alarm system. The fire alarm system includes head end equipment, pull stations at all exit doors, bells, smokes, conduit, wire, and connections. The fire alarm control panel is located in room 110, and the announciator is located near the main entry door. LAN System The building includes a local area network system with head end equipment, conduit, switches, racks, patch panels, fiber optics, as well as Cat5 and Cat5e cable. There is an effort to add Cat6 wiring when upgrades occur. Exit Signs The emergency lighting system includes the installation of exit signs. The installation has single and double sided exit signs, conduit, wire, boxes, conduit bends, connections and circuit breakers. Emergency Lighting Page 3 of 5

The emergency lighting is handled by battery backup lights. REQUIREMENTS Requirement Name Prime System Category Priority Action Date Cost Branch Wiring - Equipment & Devices D5021-Branch Wiring Devices 1- Immediate (within 1 year) 01/31/2011 30,756 Telephone System D5033-Telephone 1- Immediate (within 1 year) 01/31/2012 1,098 Natural Gas Supply for Bldg D2090-Other Plumbing years) 01/31/2013 28,900 Water Dist Complete - Average D2020-Domestic Water Distribution years) 01/31/2013 91,341 Sanitary Waste - Gravity Discharge - Average D2030-Sanitary Waste Site Drainage G3030-Storm Sewer years) 01/31/2013 99,489 years) 01/31/2013 71,855 Custodial Sink years) 01/31/2013 12,560 Drinking Fountains years) 01/31/2013 2,752 Compressed Air Piping System D2090-Other Plumbing years) 01/31/2013 15,416 Wet Sprinkler System - Light Hazard wo/pump D40-Fire Protection Gutters and Downspouts - Copper B30-Roofing years) 01/31/2013 78,927 years) 01/31/2013 35,687 Perimeter Heat System - Hydronic Fin Tube years) 01/31/2013 46,481 Ceiling/Wall Fans years) 01/31/2013 7,728 Air Handling Unit - w/supply Fan - 1961 years) 01/31/2013 48,135 Restroom years) 01/31/2013 25,951 Air Handling Units - Distribution Ductwork years) 01/31/2013 67,891 Kitchen Sinks years) 01/31/2013 2,824 Page 4 of 5

Requirement Name Prime System Category Priority Action Date Cost Fire Alarm System - Notification & Initiating Devices D5037-Fire Alarm years) 01/31/2013 53,524 D5092-Emergency Emergency Lighting Light and Power years) 01/31/2013 18,768 Lighting - Exterior - Perimeter D5022-Lighting Equipment years) 01/31/2014 6,165 Panelboards, Feeders, Disconnects - 120/208V D5012-Low Tension Service and Dist. years) 01/31/2016 123,710 D5092-Emergency Exit Signs Light and Power years) 01/31/2014 17,689 LAN System D5039-Local Area Networks years) 01/31/2015 4,315 Overhead Rolling Doors B2030-Exterior Doors years) 01/31/2016 14,337 Windows - Aluminum B2020-Exterior Windows years) 01/31/2016 62,533 Suspended ACT C3030-Ceiling Finishes years) 01/31/2016 46,259 Windows - Steel B2020-Exterior Windows years) 01/31/2016 235,040 Metal Roofing B30-Roofing Vinyl Composite Tile C3020-Floor Finishes Rubber Treads - Stairs C3020-Floor Finishes Painted Plywood on Framing B2010-Exterior Walls years) 01/31/2014 513,607 years) 01/31/2016 26,272 years) 01/31/2016 15,072 years) 01/31/2014 14,781 Branch Wiring Devices - Wiring Not Code Compliant & Corroding Conduit D5021-Branch Wiring Devices Building Code 5- Does Not Meet Current Code - 11,605 Entrance Doors - Not Handicapped Accessible B2030-Exterior Doors Accessibility Door Hardware - Not Compliant Knob Type C1020-Interior Doors Accessibility 5- Does Not Meet Current Code - 18,070 5- Does Not Meet Current Code - 20,298 Total 1,869,836 Page 5 of 5