11 00-11 00-41 00-56 39-57 13-30 00-30 00-30 00-30 00-30 00-30 00-30 00-08 General Conditions Mobilization & Survey Demolition Tree Retention and Protection Erosion and Sedimentation Control Concrete Seat Wall w/ Stone Veneer, 2' Height Helical Piers at Site Walls, 8' O.C. Curb Wall at EWF Play Surfacing Concrete Thickened Edge at EWF Edger at PIP Concrete Edger at Sand Artificial Turf Edge - Type 1 (Curb) Contract 2735477 BF-6.1 June 26, 27
30 00-09 42 10-42 10-42 10- Concrete Ramp (Concrete Play Ramp & Ramp at Sand Discovery Area) Boulder seating, sandstone Boulder edge (boulder at sand) Boulder edge (boulder at concrete) Robinia Posts, Type 1-4" to 8" diameter, 8'-0" or less in height (~5'-0" above finshed grade) Robinia Posts, Type 2-4" to 8" diameter, 10'-0" in height (~6'-0" above finished grade) Robinia Posts, Type 3-4" to 8" diameter, 12'-0" in height (~8'-0" above finished grade) Robinia Posts, Type 4-4" to 8" diameter, 14'-0" in height (~9'-0" above finished grade) Tree Stump Walls and Seating (wood obtained from Denver Forestry) at crosscut log plaza Crosscut Log Paving (wood obtained from Denver Forestry) 10 EA $ 17 EA $ 15 EA $ 8 EA $ Contract 2735477 BF-6.2 June 26, 27
08 09 10 Stumps at Sand Discovery Area (wood obtained from Denver Forestry) Logs at Sand Discovery Area (wood obtained from Denver Forestry) Sand Deck Wood Fence Play Equipment: Basket Swings (Burke) Play Equipment: 3-Bay Traditional Swings (Burke) Play Equipment: 5-12 Spinner (Burke Comet I) Play Equipment: 2-5 Spinner (Burke KidForce Spinner) Transfer Station at Sand Discovery Area Play Equipment: Earthscape - Tower & Sky Bridge Structure Play Equipment: Earthscape - St. Lawrence Log Jam Contract 2735477 BF-6.3 June 26, 27
08 09 31 20 00- Play Equipment: Earthscape - Bee & Lady Bug Play Structure Play Equipment: Earthscape - Design and Engineering (by Earthscape) Play Equipment: Earthscape 3rd party ASTM/ADA Audit (by Earthscape) Play Equipment: Earthscape Freight (by Earthscape) Play Equipment: Earthscape Site Supervisor/Install (10 days) (by Earthscape) Play Equipment: Earthscape Installation (by Contractor) - Man Hours/Equipment Play Equipment: Earthscape Installation (by Contractor) - Footings for the Tower & Sky Bridge Structure, St. Lawrence Log Jam, and Bee & Lady Bug Play Structure Earthwork Concrete Paving, Standard Grey Concrete Mowband Contract 2735477 BF-6.4 June 26, 27
32 15 40-32 18 13-32 18 13-32 18 16-32 18 16-32 18 16- Tree Ring Plaza Paving Concrete Terrace Crusher Fines Paving Artificial Turf - on 2" crusher fines screenings Artificial Turf - on 2" sub-surface pad Poured in Place Play Surfacing, over 4" depth concrete EWF Play Surfacing, 12" depth min. (including fibar drain) Salvaged Sand Play Surfacing, ~18" Depth Benches, backless Benches, salvaged Trash Receptacle Bike Racks 2 EA $ 1 EA $ 2 EA $ 9 EA $ Contract 2735477 BF-6.5 June 26, 27
32 80 00-32 91 13-32 92 23- Leaf Seating, Backless Leaf Seating, w/ Back Irrigation Systems Soil Preparation Sodding Deciduous Shade Trees, 2.5" caliper Ornamental Trees, 2.5" caliper Ornamental Trees, 5' Height Evergreen Trees, 6' Height Evergreen Trees, #6 container Wood Mulch Shrubs, #5 container Perennials / Grasses, #1 container 1 EA $ 1 EA $ 7 EA $ 4 EA $ 3 EA $ 8 EA $ 17 EA $ 67 EA $ 556 EA $ Contract 2735477 BF-6.6 June 26, 27
Dry Wells (dry wells #1, #2, #3 - size per drawings) 4" Perforated PVC Pipe 4" Solid PVC Pipe Cleanout Contract 2735477 BF-6.7 June 26, 27