Renfrew Close, London

Similar documents
Queen Caroline Estate, London

Priors Farm Estate SuDS Retrofitting Project, Cheltenham

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

Heron Court Rain Garden, London

Forest Way School Coalville, Leicestershire

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

Alma Road Rain Gardens, London

Victoria Park Health Centre, Leicester

Greening streets, retrofit rain gardens, Nottingham

rainwise Working with communities to manage rainwater

Sewer Flooding Alleviation in the Counters Creek Catchment

Manor Ponds, Sheffield

Lead Local Flood Authority SuDS Policy Statement

An Introduction to Sustainable Drainage

Hollickwood Primary School, London

Junction of Bispham Road and Bristol Avenue, north of Blackpool town centre, Lancashire, next to the former TVR car factory.

Why we need the Counters Creek storm relief sewer

Taking control of SuDS - with permeable paving

St Andrews Park, Uxbridge

Opportunistic approaches to incorporating multi-functioning SuDS into housing redevelopments

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

Hopwood Motorway Service Area, Worcestershire

Cambrian North Basin, Llanelli

Sewer Flooding Alleviation in the Counters Creek Catchment

Stebonheath Primary School, Llanelli

Promoting Sustainable Drainage Systems

Rainwise. Sustainable Drainage Solutions. Working with communities to manage rainwater. Wuppertal Court, Jarrow

SUDS: Innovation or a Tried and Tested Practice?

Green Streets and Water

SUSTAINABLE DRAINAGE AND LANDSCAPE MANAGEMENT PLAN FOR ROBINSWOOD PRIMARY SCHOOL

4. CONCEPT PLAN DEVELOPMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Northumbrian Water is required to provide investment to reduce spills at Whitburn and St Peter s, Sunderland in

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

Grey to Green Phase 1, Sheffield

Lesson 2: Stormwater Best Management Practices (BMPs)

Ruislip green roof retrofit on a tube depot, London

Howard Street, Salford, Manchester

Melton, School SuDS scheme, Mowbray

Use of Best Management Practices

Green Roofs and Stormwater Management Virginia Stovin

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

10,000 Rain Gardens Project

Wessex Water Operations Centre, Claverton Down

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Fellgate Estate, Jarrow Surface Water Management Plan 2015

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Sustainable Urban Drainage Systems. Diederik Rousseau Tineke Hooijmans

Rainwise. Sustainable Drainage Solutions. Working with communities to manage rainwater. SuDS For Schools and Communities

4.6. Low Impact and Retentive Grading

Appendix D - Technical Design Criteria for BMPs

Homeowners Guide to Stormwater BMP Maintenance

Ames City Hall Campus: Stormwater Improvements

5.0 Storm Water Landscape Guidance Introduction

Patrick E. Lindemann INGHAM COUNTY DRAIN COMMISSIONER. Towar Rain Garden Drains A Low-Impact Urban Retrofit

Small Town Sustainable Stormwater Solutions

The Development of Urban Planning and Landscaping for Sustainable Drainage Systems

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Green Infrastructure & Low Impact Development

DEALING WITH STORM WATER MANAGEMENT

Uniclass L534:L217. November paving. permeable. for amenity CASE STUDY ROBERT BRAY ASSOCIATES SUDS PROJECTS.

Green Infrastructure and Low-Impact Development Technologies

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Bioretention cell schematic key

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

LITTLE FRANCE PARK, EDINBURGH

Sustainable Urban Drainage Systems (SuDs)

Pollutant Removal Benefits

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

How You Can Help With Flood Management

LANDMARK HOUSE SUDS NOT DUDS Image Credit: RSH

J. Paul Guyer, P.E., R.A.

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

6.1 Bioretention Areas

Kittson Parkway / Watershed Park Parking Lot

SuDS The business case. Steve Wilson

Worksheet #14 Water Runoff Management

2001 Southeastern Pennsylvania Stormwater Management Symposium Villanova University. Jean K. Akers

Sustainable Stormwater Retrofit Best Practices

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

VALLEY VIEW POND Q&A. This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting.

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

Raingardens and Bioretention Tree Pits MAINTENANCE PLAN. EXAMPLE June 2008

Clearwater Photography UK

STORMWATER TOOL. Rain Garden

Green City, Clean Waters

EXTENSIVE INTENSIVE SIMPLE INTENSIVE. We specialise in producing and installing our Extensive Green Roof System, using our sedum mats.

Figure 1. Bioswale along roadside. Photo courtesy of CalTrans. Figure 2. Diagram of typical bioswale (adapted from UDFCD 1999)

Stormwater and Your Rain Garden

Inspection and Maintenance of Stormwater Best Management Practices

Maintaining Your Neighborhood Stormwater Facilities

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Tree Pits Construction Guide

Green Infrastructure Recommendations For Parks and Public Spaces

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Transcription:

Renfrew Close, London SuDS used Rain gardens Shallow rainwater conveyance channel Shallow detention basin Conveyance channels Benefits 1. Location Effective reduction in flood risk. Creation of attractive, biodiverse, playful and productive rain gardens for the community to enjoy. Introduction of the rain garden concept and a community gardening project to local residents and an adjacent primary school. Unemployed residents gained work experience and accredited qualifications in landscaping and horticulture. Renfrew Close, Beckton, London Borough of Newham, E6 5PG. 2. Description The Renfrew Close Rain garden is a community scale retrofit project. Renfrew Close was chosen for this project as London Borough of Newham were a willing council, who both owned the land (estate), and were supportive of this work being carried out on their land. London Borough of Newham (LBN) was also happy to pay for the maintenance costs after completion. The site also fitted funding criteria of it being a community space with a supportive community. The project was designed as a demonstration project to showcase how SuDS can be incorporated into existing areas. The system comprises four rain garden basins located within the central amenity grass areas of the surrounding social housing blocks made up of approximately thirty six flats. 1

The rain gardens receive water from disconnected roof downpipes and from the impermeable surfaces at ground level (through lined conveyance channels), thus reducing the volume of rainwater from the site to the sewer network. Two of the rain gardens are sized to accommodate a 1 in 10 year rainfall event. The ornamental rain garden is designed as 1 in 100 year +30% (to accommodate capacity for a climate change event) with a clearly defined 1 in 2 year central planted basin. The productive rain garden is sized for a 1 in 1 year event only and was designed for use as a space for residents to grow their own food. 3. Main SuDS components used Rain gardens Shallow rainwater conveyance channel Shallow detention basin Conveyance channels The overall drainage strategy is to divert storm water from the sewer system into the rain gardens through a variety of conveyance pathways. Upon reaching the rain garden basins, the water is infiltrated. During heavy rainfall it has been shown that rainwater is attenuated by the basins with connection to an overflow outlet to the sewer to provide a safe overflow in the unlikely event of design exceedance. As mentioned above, there are rain garden (figure 1), shallow rainwater conveyance channels passing under the footpath (figure 2). There is also a wider shallow grass basin sited around a central rain garden to provide additional surface water storage to increase capacity up to the 1 in 100 +30%event (figure 3). Conveyance channels comprising paving block, lined vegetated and unlined grass channels (see blue lines in figure 1). Basin 4 is designed as a wildlife garden prior to final outflow to the sewer (figure 4). 2

Figure 1 Renfrew Close rain garden design (c) Robert Bray Associates 3

Figure 2 Ornamental rain garden (early after installation) showing a channel bridge under a pathway Figure 3 Nature play rain garden (early after installation) showing wide shallow grass basin around main rain garden basin 4

The SuDS chain incorporates existing Thames Water (TW) surface water sewer outflows as exceedance control. Water is diverted from a non-permeable area of 915m 2 (750m 2 roof and 165m 2 road). 4. How it works Figure 4 Wildlife Rain Garden leading to final outflow monitored by Thames Water Rainwater is tackled directly at source by conveying the water from roof level to the rain gardens. Rainwater is conveyed at surface level from the diverted rainwater pipes to the rain gardens using a mixture of concrete block, lined grass and un-lined grass channels, these pass under pathways where necessary via shallow channel bridges with integrated overflow routes over the surface in case of blockage. Runoff from the existing block paved road is directed by an existing road gulley to a natural low point in the road, where it crosses the road in a reverse-fall grated channel. It is then carried via a grass channel to the nature play rain garden. The site is underlaid with highly permeable soils so rain water will infiltrate into the subsurface during conveyance in the unlined channels, and infiltrate once entering the basins. This reduces the total volume of water leaving the site from hard surfaces. In extreme events this will delay the peak flow of rainwater from the site into the sewer system. As a good practice feature three of the rain gardens are linked so that any exceedance converges to one basin which, in the absence of a natural watercourse, overflows to an existing storm water gully connection. It is anticipated that due to the designed storage capacities of the rain garden system this will happen in extreme events that exceed the design capacity of the system. The remaining 1 in 10 basin is also connected to an overflow chamber which leads to a sewer. All of the overflow connections ensure protection from exceedance flooding as a key design feature and one which should be emulated in all future SuDS projects. 5

Due to the high infiltration capacity of the rain gardens, the basins are likely to remain dry for most of the year. These are planted or seeded with wildflower and ornamental herbaceous mixes that are capable of tolerating both dry conditions and occasional inundation by rainwater. This makes them suitable for the demands of this particular rain garden habitat. Other projects designed to remain wetter or be able to hold standing water could include marginal or wetland species, but for this case they would not have been appropriate. The Renfrew Close basin planting considerations included infiltration rates through vigorous root structure; the ability to bind the soil through maximum plant coverage; the ability to thrive in ground conditions much like the general landscape but with occasional inundation; and to provide enhanced biodiversity, aesthetic and amenity interest for the local area far beyond that of the amenity turf that covered the area prior to the installation of the rain gardens. Resident interaction is also encouraged through the use of stepping stones, balancing beams and a boulder feature across some of the rain garden basins. Anecdotal evidence suggests that the rain garden installations positively increase the local resident s perception of the area. 5. Specific project details The project demonstrates creative possibilities for rain garden design with a nature play rain garden incorporating balance beams and boulders to clamber on, an ornamental rain garden which brings aesthetic value, a wildlife rain garden that increases biodiversity, and a productive rain garden designed to provide residents with space to grow their own plants or vegetables. The design therefore provides an enhanced biodiversity, aesthetic and amenity interest for the local area. As a retrofit project - the basins were designed without flow controlled drain-down outlets due to the high permeability of soils and shallow services which limited basin sizes. This allowed the basins to be connected to the on-site storm water drains for exceedance flows only (for rainfall > 1 in 10 year events for 3 basins and greater than 1 in 100 year events for 1 basin.) This may not be appropriate for other sites with differing characteristics such as lower infiltration capacity or where design will allow other methods for accommodating with exceedance flows. Maintenance is managed by the LBN s Greenspace team and delivered on site by the council s grounds maintenance contractors. 6. Benefits & achievements Creation of attractive, biodiverse, playful and productive rain gardens for the community to enjoy, whilst reducing storm water loading on existing sewers; Demonstration of a range of surface conveyance methods, path crossings, planting styles and resident uses that can be applied to other rain garden projects; SuDS performance monitoring being used to inform future rain garden design. The project demonstrates potential for rain gardens to reduce a development s contribution to flooding which is applicable to both separate surface water sewer and combined sewer areas of London; Introduction of the rain garden concept and a community gardening project to local residents and an adjacent primary school; Successful partnership working between a Local Authority, NGO, University and Defra Arm s Length Body; 6

Successful on site delivery using local authority framework contractors and Groundwork s Green Team. Delivering elements of the design through their Green Team enabled unemployed residents to gain work experience and accredited qualifications in landscaping and horticulture. As a headline monitoring figure No water has overflown the site from the rain garden basins, thus over the first 12 months of monitoring approximately 413,214 Litres of storm water have been attenuated by the rain gardens and prevented from entering the surface water sewer. 7. Challenges & lessons learnt Detailed survey work (including Ground Penetrating Radar) is favourable in order to identify the presence or otherwise of services in areas of proposed excavation. This helps to avoid problems during construction, although consideration must always be given to the possibility of unforeseen underground constraints. A main problem arose from ponding on an existing road which ran through the site but fell outside of the scope of the SuDS retrofit. Unfortunately there are still areas that pool with water during rainfall events on this road due to subsidence caused by heavy vehicle usage. Future projects should attempt as far as practicable to redirect known problem areas for ponding into their retrofit SuDS schemes where site characteristics and project budget will allow. In planting areas adjacent to SuDS components one should always design soil levels to be below the restraining edge of a conveyance channel to avoid mulch and soil being washed into the SuDS system. At Renfrew the soil adjacent to conveyance channels featured a crowned profile to retain mulch. Initially small quantities of loose mulch and soil washed into conveyance channels and caused a degree of blockage, however this was easily removed and no evidence of conveyance channels overflowing along their integrated exceedance routes were observed. Designing for exceedance at all such interfaces is important for ensuring that flows continue to their intended destination. Follow up surveys into local residents views and community engagement research would be very useful in future SuDS projects, as these can help evaluate the changing of perceptions around SuDS components over time. 8. Monitoring SuDS performance monitoring is being performed by researchers from the Sustainability Research Institute at the University of East London (UEL). All rain gardens except the productive garden are being monitored for their rain water attenuation performance. This is realised through an innovative all-in-one system. Flow meters approximate the volume of intercepted rain water from roof level. Pressure sensors record how the basins perform during and after rain events. A remote camera trap and Thames Water (TW) V-notch weir record overflow from a 1 in 10 year basin during extreme weather events. A locally installed weather station also allows for detailed correlation between weather events and monitoring data. This system allows a response to be observed for mid-high rainfall inputs. Low flows where the pressure sensors do not record an increase in pressure following a rain event are deemed to be attenuated totally, with confirmation gained by proxy using the TW V notch weir on the site outlet which reveals whether any water has left the site. 7

Where possible, data is hosted publicly through a dedicated project web page, where interested members of the public and local community can take a look at both archived and live data, further bolstering community engagement. 9. Monitoring lessons learnt The original equipment for flow rates from disconnected downpipes silted up after short periods of time, even on vegetation free roofs, the redesign of the equipment set up reduced this. Monitoring equipment therefore needs to be carefully designed to be both low maintenance and able to cope with future events. Creating scope within project budgets to allow for the redesign of equipment is essential to deal with unseen problems; Telemetry systems for data gathering were trialled, which led to some initial confusion as queries to the service provider where often slow. Future projects must ensure that all telemetry system software are fully understood by the end user and that a system for fast responses to queries is set in place before monitoring begins; Future retrofit studies should budget for research into social attitudes and engagement to further understand people s enjoyment of SuDS components. Further methods for community feedback during the project lifetime should also be explored; A site specific website can be set up in a short amount of time and at low cost. This enables sharing of data with the community and other interested parties. 9.1. Interaction with local authority LBN has been extremely supportive of the project. A member of the Council s grounds maintenance team has been acting as a point of contact for the project. This member of staff also visited the site with UEL researchers to hear their specific concerns over maintenance. LBN have shown a great interest in the site and have been adept at solving site maintenance problems, such as keeping conveyance channels clear of cut grass and emerging vegetation. 10. Key lessons for local authorities Agree maintenance procedures prior to the handover of the site along with monitoring and evaluation; Have a designated point of contact within the local authority to report maintenance problems to; Take time to understand the SuDS system and explain maintenance needs to grounds maintenance contractors so that they manage the site sensitively. 11. Project details Project completed 2015 (two year monitoring programme scheduled to complete in 2017) Project management and community engagement costs: 15,000 Design: 9,900 Construction: 55,000 Monitoring and analysis (2015-17): 20,000 Total cost: 99,900 8

12. Project funders and partners Environment Agency Groundwork London London Borough of Newham (supporting with maintenance) 13. Project team Project management: Environment Agency Design: Robert Bray Associates Community engagement and construction: Groundwork London Maintenance: London Borough of Newham (landowners) Monitoring: University of east London (funded by the Environment Agency) Monitoring equipment: RS Hydro (funded by the Environment Agency) Other assistance: Thames Water (v-notch weir) 9