Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Similar documents
Optimize. Innovate. Deliver. Engineering the Future of Bus Rapid Transit

Call to Artists Public Art for Los Angeles Metro Stations

Rights-of-Way Preservation Guidelines

Right-of-Way Acquisitions and Relocations Technical Memorandum

SR-2 Freeway Terminus Improvement Project

Whittier Greenway Trail. Est. 2009

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

WELCOME TO OPEN HOUSE TWO November 28, 2018

Transportation Committee

Mississippi Skyway Preliminary Engineering Report

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

4.1 LAND USE AND DEVELOPMENT

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

Welcome to the. Open House

Northern Branch Corridor SDEIS March 2017

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

DRAFT Civic Center Station Area Plan. Executive Summary

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

MULTI-FAMILY LAND FOR SALE

1.0 Circulation Element

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

Lake Oswego to Portland Transit Project. Lessons Learned. John Cullerton Senior Project Manager, URS 2012 APTA/TRB Light Rail Conference

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

EXPO LINE COMMUNITY WORKSHOPS NOVEMBER 27 TH & DECEMBER 3 RD Los Angeles Department of City Planning

Goals for Tonight s Meeting

Citizen Information Meeting

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

3.4.5 Roadway System and Infrastructure Phase I (Project) Roadway System Components E Street Extension (Phase I).

Issues Requiring Future Study

Clay Street Bridge Replacement Project

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

DESIGN CRITERIA PACKAGE

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc.

Glenn Highway MP DSR. Landscape Narrative

Station Area Plan Introduction & Draft Alternatives Review

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

Chapter V-Transportation

Alaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016.

The transportation system in a community is an

South Davis County COMMUNITY SPOTLIGHT

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

S C O P E O F W O R K A P R I L

Midtown Greenway Land Use and Development Plan Executive Summary

ALTERNATIVE STATION AREA -

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

PRIMARY RECORD Trinomial # NRHP Status Code 3S, 3CS, 5S3 Other Listings Review Code Reviewer Date

4/8/2015 Item #10D Page 1

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

WESTERN ILLINOIS UNIVERSITY

Section 3.16 Visual Quality

9IMPLEMENTATION AND PHASING

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

Transportation. Strategies for Action

Subject: Expo Light Rail - Revision of the Terminus Station North Entrance Design

Speedway Mall Project Frequently Asked Questions

DESIGN PUBLIC HEARING. Phase II

Lesson 6. Corridor Planning

Figure 5. Previously Identified Viable Corridors

BeltLine Corridor Environmental Study

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

EXECUTIVE SUMMARY. Introduction

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

4.1 Build Alternative 1 Construction Phasing

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

WESTERN ILLINOIS UNIVERSITY

The West Vaughan Employment Area Secondary Plan Policies

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

New Stanton Project Update July 3, 2012

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

Project Study Report Equivalent The Old Road Widening SIX FLAGS MAGIC MOUNTAIN. On Street The Old Road Between Magic Mountain Pkwy And Turnberry Lane

Pennsy Greenway Trail

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Chapter 22. Alternatives to the Proposed Project

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

A. INTRODUCTION B. PREFERRED ALTERNATIVE

3.0 PROJECT DESCRIPTION

Project Purpose. Project Need

California Environmental Quality Act (CEQA) Environmental Review Process

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21

FAQS What is the Purple Line? Why is the Purple Line a benefit for the University? How will the Purple Line affect me?

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences

Written Statement for Keizer Station Area B Amendment. Master Plan Amendment for Keizer Station Area B GENERAL INFORMATION

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Without leaps of imagination or dreaming, we lose the excitement of possibilities. Dreaming, after all, is a form of planning.

38 Queen s University Campus Master Plan Part 1

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

NOTICE OF PREPARATION

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Planning Commission Report

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

CITY OF SIMI VALLEY MEMORANDUM

Transcription:

White Paper: Metro Orange Line Extension Four Years Early and $61 Million Under Budget July 2013 Innovation for better mobility

Metro Orange Line Extension Iteris, Inc. was the prime consultant leading a multi-disciplinary team of engineers, architects and environmental consultants on the Metro Orange Line Extension Project (MOL Extension). The MOL Extension is a four-mile extension of the Metro Orange Line Busway in the San Fernando Valley of Los Angeles. It is an off-street busway with a parallel bikeway and pedestrian pathway. Iteris prepared the planning level Alternatives Analysis, prepared the Environmental Impact Report (EIR), prepared Conceptual and Preliminary Engineering Plans, Design/Build procurement documents and Final Design of several up-front, long lead time elements of the project. This paper focuses on the implementation phase of the MOL Extension, which was completed in record time and for less than budgeted. Project Background The Metro Orange Line Busway is a 13-mile east-west busway linking the North Hollywood Metro Red Line Station to Warner Center. It opened in 2000 with 12 stations spaced approximately one mile apart. The stations are designed similar to light rail stations with raised platforms and ticket vending machines to expedite boarding. The entire MOL system is designed to be convertible to light rail operations at some point in the future. The project includes a parallel bikeway and pedestrian pathway and extensive landscaping improvements along its entire length. The MOL has been very successful at attracting riders with over 25,000 daily boardings on a typical weekday. The MOL Extension is one of several north-south routes in the San Fernando Valley that will interface with the MOL and the Metro Rapid Bus line on Ventura Boulevard at the southern end of the Valley. The right of way stretches north from the Canoga MOL station to the Chatsworth Metrolink Station, where the busway interfaces with the Metrolink Ventura County commuter rail line and Amtrak. The right of way is a former freight rail line and is owned by Metro. It runs parallel to and directly adjacent to Canoga Avenue. Metro had owned the right of way since 1991 and there were 93 leases for businesses along the right of way when planning began for the MOL Extension. The right of way is typically 100 feet wide although narrows to 65 feet in one location and as wide as 275 feet along several blocks.

Lessons Learned As planning for the MOL Extension began, a review was conducted of lessons learned from the existing MOL. One of the lessons learned dealt with the analysis of project alternatives. The east-west alignment on which the MOL was built was also an abandoned railroad right of way that had been purchased by Metro. Opponents of the project successfully challenged the EIR on the MOL based on the contention that Metro had not studied a wide enough range of alternatives and had focused too quickly on a project located on the Metro-owned right of way. The court required Metro to update the EIR with a broader range of alternatives. In order to avoid that problem on the MOL Extension, the alternatives analysis studied parallel corridors on Topanga Canyon Boulevard and Desoto Avenue, as well as Canoga Avenue, before narrowing the alternatives for the EIR to an on-street bus lanes alternative that widened Canoga Avenue into the Metro right of way and an off-street busway parallel to Canoga Avenue. The design and approval process for the overcrossing were anticipated to be lengthy efforts... In terms of project design elements, there were several lessons learned from the original MOL. The landscape palette that had been used was too intense and included too many decorative flowering plants that were high maintenance. The landscaped plans for the MOL Extension relied much more heavily on native plants and included fewer tees, less bushes along the bikeway/pedestrian path that could be used as hiding places, and larger areas of cobble in retention basins. The MOL busway itself was 24 feet wide plus shoulders. Based on feedback from bus drivers, the roadway on the MOL Extension was widened to 26 feet plus shoulders to avoid the potential for mirrors colliding on passing buses. The amount of concrete paving in advance of stations and cross streets was also lengthened to reduce the wear on asphalt pavement in heavy braking areas. Construction Contracting The MOL Extension was initially intended to be constructed using a Design/Build procurement. The preferred design for the project however, included a grade separation over Lassen Street and the Metrolink/Amtrak/UP Railroad tracks near the northern terminus of the extension. The design and approval process for the overcrossing were anticipated to be lengthy efforts, so the project team proposed that the Iteris team develop the final design plans for the overcrossing so that the design/builder could begin work on construction of the overcrossing on day one of the construction contract. The overcrossing was directly south of the northern terminus of the MOL Extension at the Chatsworth Metrolink Station. The overcrossing descends into the terminus station, which was to be built on an existing parking lot serving the train station. Fortunately, there was available vacant land on the north side of the station, so Metro also contracted

with Iteris to complete final design plans for the north parking lot that would serve as the replacement and expanded parking for the lot that would be displaced on the south side of the station. Metro separately contracted for the construction of the north parking lot before the Design Builder was on board, so the north parking lot expansion was complete prior to the award of the design/build contract. This also facilitated the beginning of construction of the Lassen Street/Railroad overcrossing on day one of the design/build contract, since the south parking lot could immediately be closed and used as the construction staging location for the overcrossing project. The placement of the overcrossing support columns, the approach ramps and the at-grade bikeway/pedestrian path required that the railroad tracks be realigned to make room for the busway. The preparation of the final design plans for the overcrossing required coordination and approval by Metrolink, the UP railroad and the California Public Utilities Commission (PUC). It was a complicated design process because the busway overcrossing crossed the tracks at an angle in a location where the railroad right of way was tight. The placement of the overcrossing support columns, the approach ramps and the at-grade bikeway/pedestrian path required that the railroad tracks be realigned to make room for the busway. The train controls and pedestrian safety devices at the Lassen Street at-grade crossing below the busway overcrossing also had to be brought up to current standards as part of this process. It should also be noted that the overcrossing itself had a unique architectural design that was mandated by the project EIR to mitigate a visual impact that was identified as a project impact. By preparing the final design plans and obtaining approvals for the plans of the railroad overcrossing prior to the award of the design/build contract for the rest of the MOL Extension project probably saved as much as two years in the project schedule. Community Outreach During the planning and environmental clearance phases of the project, an extensive community outreach effort was conducted to involve the community in the design of the project and to identify issues that needed attention. The architectural design of the Lassen Street/Railroad Overcrossing was actually suggested by a member of the community to portray the outline of the nearby Simi Hills that prominent in the western sky.

A major effort was made to work with the many lessees who had established businesses on the right of way for many years. Several of them were allowed to remain and the project was designed around them, including two concrete batch plants, a self-storage facility and a building supplies business. The two concrete batch plants were important to the construction industry in the San Fernando Valley and would have been difficult to relocate, so the busway plans included reconfiguration of their lease parcels to longer, narrower parcels, but allow them to keep their heavy equipment in place and only reconfigure materials storage bins and truck circulation patterns. The building supply business was also accommodated with a modified site plan and the busway was designed to pass behind the self-storage facility to allow it to continue to function as is. Working with the businesses on the right of way allowed the project to proceed without significant opposition and preserved sources of significant lease revenue for Metro. Working with the businesses on the right of way allowed the project to proceed without significant opposition... There were also three mobile home parks along the project. Although the project EIR did not identify a noise impact at the mobile home parks, it was decided to provide screening walls along each of them as project betterments to enhance their security and avoid any future noise issues. Conclusion Photos by John Livzey of Livzey Photography The Metro Orange Line Extension planning and design efforts took advantage of lessons learned on the original Orange Line by carefully assessing project alternatives and comprehensively addressing environmental issues, working with the adjacent residential communities and businesses along the right of way. Creative packaging of the design/ build procurement with several long, lead time items having been fully designed in advance allowed the design/builder to begin construction on day one as the rest of the project was in final design. The result was that the MOL Extension opened in June 2012, approximately four years in advance of its original schedule and $61 Million below its estimated budget. Metro was able to take advantage of a favorable contracting environment during the recession and the project avoided any delays associated with community opposition by having completed the up-front work needed to address all community concerns during the environmental approval process.