INDUSTRIAL BOILER MACT GUIDELINES

Similar documents
Boiler MACT Deadline Is Here, Are You In Compliance? Sponsored by

Boiler MACT Webinar Q/A

PROPOSED October 15, 2013

06-96 DEPARTMENT OF ENVIRONMENTAL PROTECTION CONTROL OF EMISSIONS FROM OUTDOOR WOOD BOILERS

July Area Source Boiler NESHAP, 40 CFR Part 63, Subpart JJJJJJ (6J) Questions and Answers

Nine Metal Fabrication and Finishing Source Categories 40 Code of Federal Regulations (CFR) Part 63, Subpart XXXXXX (6X NESHAP)

d. Portable water heaters used exclusively for underwater diving operations.

RULE 3.23 NATURAL GAS-FIRED WATER HEATERS, SMALL BOILERS, AND PROCESS HEATERS (Adopted 10/03/2016)

Guidance Document for the Halogenated Solvent Cleaner NESHAP - Forms Only Version

06-96 DEPARTMENT OF ENVIRONMENTAL PROTECTION CONTROL OF EMISSIONS FROM OUTDOOR WOOD BOILERS

Glenside Environmental Services Ltd

ATTACHMENT A BIORETENTION SOIL SPECIFICATION

Boiler Basics. Design and operation

ANCHORAGE, ALASKA AO No (S)

RULE 225 WOOD BURNING APPLIANCES

S 2024 S T A T E O F R H O D E I S L A N D

CONTENTS. B. System Design and Performance Requirements

DISTRICT/ MUNICIPALITY OF Wood Burning Appliance Bylaw No., 20

BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION

Biosolids Compost Informational Handout

Environmental Expenditures. by the U.S. Oil and Natural Gas Industry


The Environmental Health & Safety Guardian

NESHAP 6W Notification of Compliance Status

Applied Techno Systems

CS744 Series: Carbon/Sulfur by Combustion

Carbon Monoxide Detectors in New and Existing Buildings

Biosolids Compost Informational Handout

The world s standard in efficiency. CBEX FIRETUBE

Division F Of G Of The 1987 Standard Industrial Classification Manual

DRAFT July 31, Any person who transfers or receives a wood burning stove or wood burning heater as part of a real property sale or transfer.

Biomass Energy Systems

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system

Barb Johnson Kansas Small Business Environmental Assistance Program June 1, 2011

Keywords biomass boiler, biomass resource, Small scale sewage treatment plant, twin drum type dryer,

LA GRANGE FIRE DEPARTMENT JANUARY 2018

Ministerial Decree No. 14/2005 (VI. 28.) KvVM. on the rules concerning the screening surveys of remedial site investigations.

Model Carbon Monoxide (CO) Alarm Response Policy

FACILITY PROFILE ARBEC FOREST PRODUCTS INC. PRODUITS FORESTIERS ARBEC INC. Oriented Strand Board Mill Miramichi, N.B. Prepared by:

CEM Istanbul - Turkey. True trace emission monitoring system

Home Fires Involving Heating Equipment

CONTROL SYSTEM D ESIGN, E NGINEERING & C ONSTRUCTION.

Schedule of Accreditation issued by United Kingdom Accreditation Service High Street, Feltham, Middlesex, TW13 4UN, UK

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system

Technical manual 2G-TA 04 - Gas

Fired Heaters Key to Efficient Operation of Refineries and Petrochemicals

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system

Electrochemical DrägerSensor Sensors for Fixed Gas Detectors

City Council Special Meeting AGENDA ITEM NO. C.

Smoke & Carbon Monoxide

ARTICLE 14.A WOOD STOVES AND FIREPLACES. Standards for Solid Fuel Burning Appliances

Aluminum Dust Management in a Metallizing Facility

Append LCCO 10.8 Emissions from Fuel-Burning Equipment

Chapter 12 HOT WORK OPERATIONS. Purpose:

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

HVAC Workshop â Air Conditioning & Boilers

EL765. Fire Extinguishers [EL /2/ ]

ACTIVITIES OF THE MEASURING GROUP

SPECIFICATION MODEL 5200 GAS MONITOR SYSTEM. User Instructions For The Model 5200 Gas Monitor System

PROFIRE -E SERIES BURNERS

SECTION STRUCTURAL SOIL

Compliance Guidance for non-technical managers

Melrose Fire Department

1.0 PROJECT PURPOSE AND NEED

[Docket No. FAA ; Directorate Identifier 2004-CE-25-AD; Amendment ; AD ]

Flexible Schedule of Accreditation. SIRA CERTIFICATION SERVICE Unit 6, Hawarden Industrial Park, Hawarden, CH5 3US.

Flexible Schedule of Accreditation. SIRA CERTIFICATION SERVICE Unit 6, Hawarden Industrial Park, Hawarden, CH5 3US.

The Emergence of Triboelectric Technology

RULE 417 WOOD BURNING APPLIANCES Adopted INDEX

You can view our archived webinars by going to

Append LCCO 10.8 Emissions from Fuel-Burning Equipment

Standard Development Timeline

City of Pine Island Planning and Zoning Commission Agenda Tuesday March 12, :00 PM Second Floor City Hall 250 South Main Street

EPA/ODEQ DEMOLITION BY FIRE REQUIREMENTS

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 3, 2016 PERMIT TO INSTALL 31-02B

LIGHTING DESIGN STANDARDS SECTION City of Maryland Heights ZONING CODE

Regulatory Highlights 2006: E-scrap & Air December 2006

2013 Efficiency Requirements for Gas Furnaces

WELCOME TO THE AWT REGIONAL TRAINING PROGRAM

COMPOSITE MESH PAD (CMP) DRY SCRUBBERS ENFORCER III TM III

MONTH-BY-MONTH GUIDE TO HVAC MAINTENANCE

COURSE 474 CONTINUOUS EMISSION MONITORING Extended Agenda

COMMISSION REGULATION (EU) No /.. of

PLUMBING & CARBON MONOXIDE

Flameless Technology Demonstration Heater

Home CALOR. At with INTRODUCING OUR NEW TUMBLE DRYER SAFETY AT HOME

EU GPP Criteria for Water-based Heaters

Home Heating MORE THAN JUST STAYING WARM

For inspection purposes only.

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

326 IAC Definitions Authority: IC ; IC Affected: IC 13-12; IC ; IC

ENERGY RECOVERY SOLUTIONS. Recover wasted energy to increase efficiency and save money immediately.

CITY COUNCIL STAFF REPORT

COMMISSION IMPLEMENTING DECISION

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

LOMBARD FIRE DEPARTMENT ILLINOIS CARBON MONOXIDE ALARM DETECTOR LAW. Carbon Monoxide Law. Takes effect January 1, 2007 One outside each sleeping area

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

Development of Boiler Design

Refrigerant Management Requirements Update

Transcription:

INDUSTRIAL BOILER MACT GUIDELINES Blake McBurney McBurney Corporation Norcross, Georgia Discussion Topics ICI Boiler MACT: - W hat is it? - What units are affected? - What units are not affected? - Definitions - Emission limits - Implementation schedule Implications for the Forest Industry W hat s next? Comments and Questions What is MACT? Achieved by: National Emission Standard for Hazardous Air Pollutants (HAPs) for Industrial, Commercial and Institutional Boilers and Process Heaters (ICI Boiler MACT) For existing sources, represents the average emission limitation achieved by the best performing 12 percent For new sources, the limit represents that achieved by the best-controlled similar source Reducing value, or eliminating emissions of HAPs Enclosing systems or processes to eliminate emissions of HAPs Collecting, capturing, or treating emissions of HAPs Work practice standards A combination of the above Western Dry Kiln Association 91

Industrial Boiler MACT Category standard required by 112(d) of the Clean Air Act Proposed in January 2003 Signed by EPA Administrator in February 2004 Published as final rule in Federal Register on September 13, 2004. The effective date of the regulation was November 12, 2004. An existing boiler or process heater to be in compliance with ICI Boiler MACT, except for compliance demonstration by September 13, 2007. Existing boilers to be in compliance demonstration 180 days after that date. Applicability includes all industrial boilers and furnaces, regardless of fuel(s) fired. University of affected units: ~42,000 boilers and ~15,000 process heaters. EPA has developed categories and subcategories by size, utilization and fuel combusted, so NOT all boilers are required to achieve emissions reductions. Applies to sources with the potential to emit >10 tons/yr of a single HAP or 25 tons/yr of aggregate HAPS. MACT Applicability Existing boilers - Solid fuel fired - Liquid fuel fired - Gaseous fuel fired Each category is broken down into: - Large boilers (heat input >10 MMBtu/hr) - Small boilers (heat input <10 MMBtu/hr, and all firetube boilers) - Limited use boilers (large units with federally enforceable capacity factor limitation of less than 10% New Boilers - Solid fuel fired - Liquid fuel fired - Gaseous fuel fired Each category is broken down into: - Large boilers (heat input >10 MMBtu/hr) - Small boilers (heat input <10 MMBtu/hr, and all firetube boilers) - Limited use boilers (large units with federally enforceable capacity factor limitation of less than 10%) Western Dry Kiln Association 92

Which Boilers are Affected? When MACT was proposed, it was clear that the US-EPA was focusing on solid-fuel fired boilers Existing gas and oil fired boilers have notification requirements, but no emission fits under ICI MACT Definitions New Units: Commenced construction or reconstruction (relocated unit) on or after January 13, 2003. Existing Units: Commenced construction before January 13, 2003. Small Units: Any firetube boiler (regardless of size) and any other boiler or process heater <10 MMBtu/hr heat input Large Units: Any watertube boiler or process heater>10 MMBtu/hr heat input Regulated Pollutants Particulate Matter (PM) (as a surrogate for HAP metals - arsenic, beryllium, cadmium, chromium, led, manganese, nickel, and selenium) Hydrogen Chloride (Hcl) (as a surrogate for inorganic HAPs) Mercury (Hg) Carbon Monoxide (CO) (for new or reconstructed boilers/furnaces only) Western Dry Kiln Association 93

Emission Limits Fuel Type Existing Units New Units Solid -PM 0.07 lb/mmbtu 0.025 lb/mmbtu -HCL 0.09 lb/mmbtu 0.020 lb/mmbtu -6 -Hg 9x10-6 lb/mmbtu 3x10 lb/mmbtu -CO None 400 ppm - 7% O 2 Liquid -PM None 0.03 lb/mmbtu -HCL None 0.0005 lb/mmbtu -CO None 400 ppm - 3% O 2 Gas None 400 ppm - 3% O 2 Compliance Flexibility ICI Boiler MACT is flexible relative to how a facility may choose to comply. Compliance can be demonstrated by using any of the following for existing boilers and process heaters: Fuel analysis (every 5 years) Performance testing Emissions averaging Health-based alternatives for Hcl and/or TSM Fuel switching Air pollution control equipment upgrades Any combination of the above Fuel Analysis Fuel Type Wood Ultimate Analysis (% by weight): Carbon 27.65 Hydrogen 2.75 Oxygen 18.65 Nitrogen 0.15 Chlorine 0.02 Sulfur 0.05 Ash 0.73 Moisture 50.00 Total 100.00 Higher Heating Value - HHV (Btu/lb): 4500 Western Dry Kiln Association 94

Compliance Monitoring New boilers and process heaters 100 MMBtu/hr input must continuously monitor CO and O on a 30 day rolling average. 2 New boiler <100 MMBtu/hr only have to demonstrate CO compliance during initial performance test. Existing boilers are not required to continuously monitor or test for CO emissions. New and existing units (without wet scrubbers) must comply with PM or TSM and mercury limits must continuously monitor opacity. New and existing units that have operating limits must monitor certain parameters including T/R voltage, water ph, liquid flow rate, urea flow rate, etc. Record Keeping The final rule requires that facilities keep certain records for 5 years, including at least 2 years on site following the date of each occurrence. Operating records Copies of site plans Copies of all performance tests results, fuel analyses and continuous compliance data Records of non-compliance All reports and notifications submitted to comply with the Final Rule. Boiler MACT was Proposed Now What? Process began with a series of questions: Which boilers are affected? What pollutants are regulated? What monitoring/testing is required? Where do we stand right now? What comments must be made to ensure we have a voice in the process? Hybrid Boiler Applicability? What s Next? Seeking clarification of MACT Firetube boilers are classified as small units regardless of size Hybrid boilers are not covered by the rule Seeking to define existing hybrid boilers as firetube boilers Is Boiler MACT the End? The EPA time table on the following page suggests not. Western Dry Kiln Association 95

Recommendations Do a detailed analysis of your facility to determine the least cost option. Pay attention to the time requirements for compliance. If you need help, there are competent and experienced firms out there. Get it! Closing Thoughts When budgeting for future fiscal years, don t forget to increase $$ allocated for emissions testing: - MACT requires initial annual testing for 3 years followed by one test every 3 years unless using fuel analysis as the compliance demonstration method. The clock is ticking! - September 13, 2007 Western Dry Kiln Association 96