Combustion hot flew gases passing chamber

Similar documents
INSTRUCTIONS FOR INSTALLATION, SETTING AND USE

PUSHING THE LIMITS OF WHAT IS POSSIBLE

FLUIDIZED BED BOILERS

tççç= ÜÉ~íáåÖ çéíáçåë

TECHNICAL DATA MOBILE WASTE INCINERATOR

Renewable energy-based fruit dryers 1

LEAD RECYCLING PLANT. Battery Machine Manufacturers: Since 1989

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens

Easyfire Standalone biomass pellet boiler

Pellet boiler Electronic Modulation Automatic Cleaning Grinder system Easy Installation 4 power levels: 10, 16, 25, 43 kw

Fire Chief Wood/Coal Burning Furnaces

Incident Summary (II )

Report on Development of a 5-tonne Capacity Solar Biomass Hybrid Dryer for Drying Maize

HYBRID-FYRE FLUSH WOOD INSERTS

Leading European manufacturer of fireplace stoves and fireplace inserts. Fireplace inserts

100% IRISH...make yours a Brightfire.

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty.

TECHNICAL TRAINING IN DRYING WITH BIOMASS BASED DRYERS INTRODUCTION TO DRYING AND BIOMASS DRYERS

Development of Boiler Design

OFTEC s role in promoting safe domestic oil storage

Flush Wood Hybrid-Fyre Inserts

With its particular heat retencion capacity, cast iron is the perfect

Max-3 Steel Shell Boiler

Leading European manufacturer of fireplace stoves and fireplace inserts

Aquaflam Wood boiler stoves and fireplace inserts

Rozp.UE2015/ kw kw

CHIMNEYS AND VENTS CHAPTER 8

Come home to Nectre. NECTRE SLOW COMBUSTION HEATING

NECTRE SLOW COMBUSTION HEATING

BIOMASS COMBUSTION BOILERS

INSTRUCTION. for installation and operation of solid fuel fireplace

Boiler. Fire tube Boiler:

INTEC Engineering GmbH Energy systems

anti-condensation valve

Technical Datasheet. P4 Pellet Boiler Models 8/15, 20/25, 32/38, 48/60. Benefits at a Glance:

Varde Aura. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas

comfort and peace of mind

Hybrid Series. Innovative Heating Solutions continentalheatingandcooling.com

RS Chimney Fan for Solid Fuel Applications

Varde Shape. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas

SAUNA HEATER INSTALLATION AND OPERATING MANUAL

INSTRUCTION MANUAL. for installation and operation of solid fuel cookers. Victoria and Victoria Lux

Flush Wood Hybrid-Fyre Inserts

Weatherization Assistance Program (WAP) Space Heater Policy

Smart Heating Technology Ltd. U Statku 653/24, Ostrava-Bartovice Czech Republic

Technical Datasheet. FHG-S Models 28, and 45. Benefits at a Glance: State Route 22 Salem, NY 12865

RS Chimney Fan for Solid Fuel Applications

Your guide to. Biomass Heating Systems

CI2600 PRO-SERIES WOOD INSERT BEST LINEAR STYLING - CI2600 LATEST IN WOOD BURNING TECHNOLOGY SPECIFICATIONS

Hybrid Series. Innovative Heating Solutions continentalheatingandcooling.com

TECHNICAL BOOK 4: OIL FIRED APPLIANCE & SYSTEM INSTALLATION REQUIREMENTS

Before selecting your stove, it is very important that you clearly identify what your needs are:

INSTALLATION AND OPERATION MANUAL

integrated sludge treatment combined sludge drying and incineration

AIM OF THE EXPERIMENT:- Study of boilers (fire tube, water tube) APPARATUS REQUIRED: - SL.NO NAME OF THE APPARATUS SPECIFICATION QUANTITY 01 Fire tube

Air and technology System solutions with a perspective... System solu

Hamlet of Cambridge Bay By-Laws

MANUAL. Page 1/44

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

Rocket heater GAMERA

Masterflamme Convection Wood Stoves Perfect combustion with unique design

Website:

Esse B MODEL Roomheater with boiler WOOD BURNING ONLY MODEL

Part J of the Building Regulations: Changes for 2010 Tuesday 28 th September 2010 Presenter: David Bleicher

Boiler Technical Specifications (2013)

<< >> Condensing technology at the service of oil. Controlling energy to save money

OWNERS MANUAL MODEL DO110 & DO180 IS CERTIFIED TO: Unit Serial # Purchased From Company Address

The Difference Is Quality

Riva F40 Cube. Multi-Fuel Free Standing Stove. Installation Instructions. Models: RVF40C. For use in Great Britain and Eire IMPORTANT

FIREPLACE INSERTS. SINCE 1960

Can I install my stove using an existing masonry chimney?

HIGHLANDER Wood and Multi-fuel Stoves

TABLE OF CONTENTS. Site preparation 2 Placement. 2 Chimney and stove pipe connections. 2

CHAPTER 8 CHIMNEYS AND VENTS

MG SERIES - ENERGY CLASS A. Meeting the. MG series 1 / 7

THE CHOICE IS CLEAR. Quality Australian Made Wood Heaters

product catalog 2014 The most awarded central heating boilers in Poland

Owner s Manual for. PennStoker

INSTALLATION AND OPERATING INSTRUCTIONS

DOMESTIC SMOKE. working for a cleaner, quieter, healthier world

BIOMASS BOILER DUAL THERM

HYBRID SERIES FURNACES. napoleonheatingandcooling.com

Image_engl_08:Image-engl-RZ :55 Uhr Seite 1. INTEC Engineering GmbH Energy systems

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

High quality boiler stoves and fireplace inserts

Energy Saver 101: Home Energy Audits

Technical Datasheet. Solo Innova Models 30 and 50. Benefits at a Glance: Solo Innova

ecodry Figure 1 - Process Diagram ecodry B General Process Description

MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF AN AUTOMATED PELLET BURNER FROM SERIES GP XX SC.

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

qüé=`üáãåéó An effective chimney is an important part of any successful wood-burning system.

Technical Datasheet. P4 Pellet Boiler Models 8/15, 20/25, 32/38, 48/60, 80/100. Benefits at a Glance:

HDG K SERIES. Wood pellet boiler. The perfect alternative to fossil fuels. Receive up to

Dovre 700CBW Cast Iron Wood Stove INSTALLATION INSTRUCTIONS 700G/1095

The types BK 20 to BK 100 convincing power

napoleonfireplaces.com WOOD BURNING WOOD BURNING FIREPLACES

Wind. Service instruction

Masterflamme Convection Wood Stove

Forward-looking and energy effi cient Biomass heating

Problem Cause Remedial action. Gauge glass There was excess chemical dosage The normal ph recommended was 9.5 to See photo 3 & 4.

Transcription:

Disposal of Solid Municipal, Gram Panchayat, Domestic and Hospital Biomass Waste Through use of Incinerator, And Energy for Heating Water Introduction :- In present condition solid waste management is a big issue, the solid waste is generated at domestic, commercial and agricultural levels which is to be managed and treated in a proper manner so that it can be used as energy source and also be less polluting. The traditional systems of dumping solid waste causes land pollution and the process of burning solid waste causes air pollution which is not desirable. Solid waste incinerator is the most useful device for managing wastes and it is the desirable technique which can be used for disposing all types of hazardous wastes. At domestic level such as house, the waste such as plastics, clothes, packing materials, cardboard, paper, garden wastes, Coconut wastes, etc. are not disposed properly. And if this is the condition of a single house then what would be of one city and that of whole country we cant imagine. This waste is just taken and dumped at the places out of city which causes the land pollution or burned which causes the air pollution. This condition can become critical if proper steps are no taken before its too late. Technology Intervention :- This traditional method of burning is modified in such a way that the burning process is carried out in a closed compact system called Solid Waste Incinerator. A Solid Waste incinerator, which is used for domestic hot water generation was designed, successfully constructed and tested. The natural draft system, primary and secondary air system is introduced along with it for clean burning. Performance testing of the system was carried out on large observation basis and concluded that the system is reliable for daily use. It could be very useful for urban and rural areas as well, especially in school/college hostels where papers and other non toxic solid wastes are generated in large quantities. It can prove to be useful in hospitals and villages for domestic use. Components of Incinerator :- Fuel loading door Combustion chamber Hot water tank (Heat Exchanger) Cold water Inlet tube. Pressure release valve Ash box Combustion hot flew gases passing chamber

Chimney 1. Fuel loading door : 400 mm x 300 mm Angle : 50 mm x 50 mm. Thickness : 5 mm 2. Combustion Chamber : Diameter : 400 mm. Height 400 mm. Cast Iron (CI) grate 300 mm x 300 mm. Thickness 16 mm. Construction in fire bricks 3. Hot water Tank (Heat Exchanger) : Stainless steel (SS). Grade 302. Thickness 3 mm. Capacity 50 ltrs. Size : Diameter 400 mm. Height 450 mm. 4. Cold water Inlet tube : Stainless Steel (SS). Diameter 25 mm. Inserted into heat exchanger at center. 25 mm above the bottom of the heat exchanger. 5. Pressure release valve : At the top of heat exchanger. Stainless Steel (SS) 6. Ash Box : 280 mm x 280 mm : Constructed in bricks. 7. Flue gasses chamber : Diameter 600 mm. Height 650 mm. 8. Chimney Height : 4.5 m. Diameter 150 mm. Thickness 3 mm (Mild steel) Operation :- 1. Load fuel from fuel chamber to combustion chamber. 2. Fuel burning in combustion chamber. 3. Combustion process takes place due to combination of primary and secondary air. 4. Hot flue gases formed in combustion chamber, which passes in the flue gas chamber which is insulated by fire bricks. 5. Hot flue gases passing around the heat exchanger. 6. Thus heated tank surface heats the water. Study Results : - Burning rate 20-25 kg/hr Temperature in combustion chamber 600 to 700 0 Hot water capacity 300-350 ltrs Hot water temperature 50-60 0

Efficiency 25% Particulate Matter >350 pm(mg/mjd) CO 5g/mjd Extension of Technology :- Solid waste disposal incinerator was successfully demonstrated and installed at corporate sector canteens, hospitals, Institutes training centres, Hostels, agro-tourisum centres, industries, village level gram panchayat and domestic use. Care should be taken while using incinerator Ash near combustion chamber should be cleared regularly. Chimney should be cleaned once in a month and carbon particulates should be removed by opening the chamber and then close the chamber. Top hood of bricks should be opened and cleaned once in 3 months and then close the hood as before Incinerator should be cleaned from inside by opening the drain valve once in three months When dry solid wastes catches the fire load half dry waste inside combustion chamber Before burning the hospital waste first burn the dry waste or wood and the load hospital waste. Combustion chamber should be loaded by light weight waste of 2 to 5 kg and then burn it It takes about 30 min to get hot water Pressure wall used in the system, should be used regularly Combustion chamber door should be always closed. After removing hot water from the system cold water should be filled in the system

Catalyzed and supported by SEED Division, Deptt. of Science & Technology New Delhi 110 016