INTRODUCTION EXISTING CONDITIONS

Similar documents
The transportation system in a community is an

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

Official Plan Review

MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS

Sustainable Development Call for Projects Western Infrastructure Project Submissions

Executive Summary. NY 7 / NY 2 Corridor

PORT WHITBY COMMUNITY

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

City of Nogales General Plan

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Implementation Guide Comprehensive Plan City of Allen

hermitage town center

Silverdale Regional Center

Health and the Built Environment Placemaking Workshop, February 2018

Manchester. Vision for Manchester

City of Long Beach. creating vibrant and exciting places

Stafford County Strategic Plans

CITY OF PUYALLUP. Background. Development Services

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

THE TOWN OF WASAGA BEACH

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

4.1.3 LAND USE CATEGORIES

BUDGETING FOR OUTCOMES TRINITY RIVER CORRIDOR

Best Practices Appendix: Waterfront Communities

Comprehensive Plan ADOPTED APRIL 2014

Visioning Statement and Guiding Principles

Bourne Downtown Site Planning

City of Chickasaw Land Use Comprehensive Plan 2030 Chapter5-Draft(2)Public review_

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Lambeth Main Street Streetscape Improvements

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Name of Action: Arrangement of beach locations on the River Vikhra

PLANNING ADVISORY BOARD AGENDA OCTOBER

4-Town Comprehensive Plan DRAFT 7/30/07

This Review Is Divided Into Two Phases:

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

Town of Oakville Streetscape Strategy

Anatomy of A Vibrant Downtown. Anatomy of a Vibrant Downtown

TEMPLE MEDICAL & EDUCATION DISTRICT

Year in Review

THEMES, VISION, + PRINCIPLES

A Growing Community Rural Settlement Areas

The West Vaughan Employment Area Secondary Plan Policies

TORTI GALLAS and partners, inc. How to Retrofit Your Suburb to Make a Downtown

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

Quality Public Realm & Streetscapes

Complete Streets in Lancaster County

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Mississauga Waterfront. Parks Strategy - Draft

Hockessin Community Redevelopment Plan

A. Selma Park, Davis Bay and Wilson Creek

10.0 Open Space and Public Realm

2018 Northampton Township Comprehensive Plan

4- PA - LD - LIVELY DOWNTOWN. LD - Background

1.0 Circulation Element

Portage Parkway Environmental Assessment Public Information Centre No. 1

Planning, Property and Development Department Report. To the Riel Community Committee

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

Toronto Complete Streets Guidelines

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Age Friendly Design ( 2:15 Breakout Session )

SCHEDULE 'A' TO BY-LAW as Amended by AMENDMENT NO. 90 TO THE WHITBY OFFICIAL PLAN

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Appendix C: Interim Mixed-Use Evaluation Criteria

Ridgefield and the Growth Management Act

Subject: Hendry County Evaluation and Appraisal Report Letter of Understanding - Identification of Major Issues

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

Chapter 3 Core Strategy

Arlington, Virginia is a worldclass

The Five Components of the McLoughlin Area Plan

PUBLIC OPEN HOUSE SEPTEMBER 8 TH, 2010 CITY OF LETHBRIDGE DEVELOPMENT SERVICES

Chapter 5: Natural Resources and Environment

Master Plan for Preservation and Scenic Conservation (1995)

2.0 THE PLATINUM TRIANGLE VISION

Rights-of-Way Preservation Guidelines

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.

Niagara Region Official Plan. Table of Contents

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Southeast Policy Area Community Plan

Regional Context Statement

Future Land Use SAMPLE RECOMMENDATIONS

Rezoning Transportation Analysis Petition Number: General Location Identifier:

City of Tacoma Planning and Development Services

Master Environmental Servicing Plan & Secondary Plan

OPEN SPACE TYPES. SIZE 8 acres. SIZE 20 acres. SIZE 1 acre

Complete Neighbourhood Guidelines Review Tool

Chapter 2: Vision, Goals and Strategies

SPRINGHILL LAKE TRANSIT VILLAGE

Sacramento Area Council of Governments (SACOG)

Transcription:

INTRODUCTION The Pedestrian Mobility Study and Plan is a Transportation Planning effort to identify Safe Mobility Alternatives for Pedestrian and Bicycle traffic within the City of Port Aransas. This plan is the first step in the planning process and establishes the framework in which the subsequent steps can and should take place. Key issues for providing for these alternative modes of transportation include: Safety Connectivity Walkability I Functionality Accessibility I Conformance Promote Health Community Healthy Economy Tourism Inviting to residents and tourists alike This study was conducted within the Port Aransas City Proper, or the Study Area generally bounded on the South by Mustang Boulevard, on the North and West by the ship channel and on the East by the Gulf of Mexico. This plan recognizes that the overall system will expand generally along SH 361 and the beach to the South as growth occurs within the City and this plan should expand to incorporate that growth. The purpose of the Pedestrian Mobility Study and Plan is to achieve two objectives. First, the City needed an initial analysis and plan that provides guidance and supporting information for immediate pedestrian/bicycle system improvement to the City with its existing conditions. These immediate improvements included hike & bike trail projects resulting from funding opportunities through Texas Department of Transportation (TxDOT) and private developers. Second, the City intends to add to the core system as it grows with new development and municipal expansion. This plan will be used for identifying how to integrate pedestrian/bicycle system improvements with more standard capital improvements and park additions. The plan also helps private developers include routes and linkages to connect to the City-wide system. EXISTING CONDITIONS - 2004 An inventory was conducted to evaluate the city's supply of pedestrian access ways. The inventory found various sidewalks throughout the city providing some connectivity through the city both North-South and East-West. Sidewalks generally occurred on the more major thoroughfares and access points to the beach as well as some new developments and parks. Sidewalk condition and travel width varied throughout the city and internal routes within the city were lacking to a large extent. The Existing Conditions Map on the following page depicts the locations of existing sidewalks/trails within the study area.

MULTI-USE SYSTEM The Multi-Use System Plan maps a recommended approach to creating the pedestrian & bicycle mobility system within the study area. In determining route locations, issues of available space, traffic and future development were taken into consideration. With respect to connectivity, facilities were identified that were considered pedestrian traffic generators and listed on the map as school/civic, parks, pedestrian generators (high density residential, local shopping, etc.), retail districts and the active recreation areas of the beach & shoreline. System routes were identified with a hierarchy based on anticipated volume of use and function. Primary Route: The highest volume of traffic is anticipated along these routes. Width: 8'-10' to allow for passing and multiple two way traffic Material: reinforced concrete to allow for the widest variety of users Secondary Route: A moderate volume of traffic is anticipated along these routes. Width: 6'-8' to allow for passing and two way traffic Material: reinforced concrete to allow for variety of users

Connector Route: A low volume of traffic is anticipated along these routes. Width: 4'-8' to allow for one or two way traffic Material: reinforced concrete or decomposed granite to allow for access to higher volume route Types of Facilities The plan calls for primarily building multi-purpose, concrete paths as Port Aransas standard trail wherever feasible. However, there are constraints along many of the routes identified in the plan since the City is establishing a new system along pre-existing streets and by-ways. In many locations, the appropriate choice could be sidewalk or narrow-width paths consisting of crushed stone, gravel or another type of material because of design limitations. Financial considerations may also require a phased approach where the first trail may be a base material and will eventually be converted to concrete when funding becomes available to make the improvements. SUMMARY The goal of this plan is to incorporate Pedestrian/Bicycle Routes into identified and future capital improvement projects (CIP), new development and specific route projects. As the City grows and builds new infrastructure, opportunities to incorporate Pedestrian/Bicycle Routes will surface and allow the City to take advantage of this opportunity. Collaboration of this Pedestrian/Bicycle Mobility Plan should occur with other efforts within the City such as the Thoroughfare Plan, Parks, Recreation and Open Space Plan and other improvement plans to aid in funding as well as multi-use and multi-function facilities. Funding Opportunities exist through grant programs (Texas Department of Transportation, Texas Parks and Wildlife, etc.), CIP projects, private development and civic development (schools) that can allow routes to be constructed to provide the overall system. Continuation of this process is recommended so to evaluate each route on a route by route basis to determine the design criteria, potential funding alternatives and create an implementation plan. This next step effort will facilitate the implementation of the system in a more timely manner and identify all opportunities currently planned for and anticipated in the future.