London Legacy Development Corporation Quality Review Panel. Thursday 16 April 2015 Level 10, 1 Stratford Place, Montfichet Road, London E20 1EJ

Similar documents
London Legacy Development Corporation Quality Review Panel

London Legacy Development Corporation Quality Review Panel. Report of Formal Review Meeting: IQL Redman Place

Masterplanning in Hackney Wick and Fish Island

Anston House, Brighton

Town and Country Planning (Local Planning) (England) Regulations 2012, Regulation 22 Submission of Legacy Corporation Local Plan

Aerial view of Hackney Wick. PTE - Diespeker Wharf, Islington. PTE - Deptford Lounge

BROMLEY-BY-BOW SUPPLEMENTARY PLANNING DOCUMENT (ADOPTED - APRIL 2017)

THE LOCAL PLAN SUB AREAS

Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan

Design Review Report Former YMCA Building, Bridgend DCFW Ref: N164 Meeting of 12th April 2018

OUR AREA SECTION 02 I NEXT PAGE. 2.1 This section sets the scene in regard to the role of the Legacy Corporation and the baseline

Welcome to the Queen s Square, Croydon Consultation

Hackney A Place for Everyone

Soho Loop, Dudley Road

Existing offices occupy part of the site and Policy E5 of the Local Plan seeks to retain appropriate employment sites.

Past, Present and Future

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

16. Peckham Peckham Area Vision

BROMLEY BY BOW SOUTH. LANDOWNER MASTERPLAN Final October 2016

WELCOME. Thanks for visiting Hadley Property Group s exhibition on its initial plans to redevelop land at Bath Road in Totterdown.

Peckham Peckham Area Vision Map

Warren Farm, Ampthill

Has there been interest in the site from other parties since St. Modwen owned it? No

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

1) Masterplan and design principles

REPORT BACK BROADSHEET 3 May 2016

LINDEN HOMES McArthur s Warehouse, Gas Ferry Road. Welcome. Feedback

75-89 Wallis Road & 59 Berkshire Road, Hackney Wick, London, E9 5LN

The Old Post Office Site

Introduction to MP3. MP3 H4 Park Central (North)

PUBLIC REALM STRATEGY

PUDDING MILL INTRODUCTORY FLIP-BOOK. Summer Pudding Mill Square

Welcome to the Ashley Road South Consultation Event!

Shaping the heart of Stroud - Policy options

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

Huddersfield Urban Design Framework. 3. Framework

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

LANDSCAPE DESIGN REPORT

Village Enhancement Scheme Barton under Needwood

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Welcome. To download the materials on display today, please visit the project website

South Quay Plaza Tower Hamlets Community Forum; Record of Discussion

97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015

Proposed Redevelopment of Hope Wharf

You can contact the Planning Policy Team on or by at

Welcome to this public exhibition on our plans for the Camberwell Union, a creative centre on the site of the Burgess Business Park in Camberwell.

Design Review Report Police Headquarters, Cwmbran DCFW Ref: N159 Meeting of 15th March 2018

SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK

Paignton Neighbourhood Plan (Submission version 2017)

Welcome to our exhibition

Rotherhithe Rotherhithe Area Vision Map

ROYAL MINT COURT SECURES PLANNING CONSENT FOR 600,000 SQ. FT. COMMERCIAL SCHEME FOR OVER 6,000 LONDON WORKERS

Scottish Natural Heritage. Better places for people and nature

INVESTING IN WATERWAYS

Aberfeldy New Village Wayfinding & Public Art Strategy

CHESTER ONE CITY PLAN

NATURAL AND BUILT ENVIRONMENT BACKGROUND PAPER

Strategic Environmental Assessment Screening Statement for the Pudding Mill Supplementary Planning Document

GREENFORD HALL & ADJOINING LAND

How can we improve mobility and access?

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

Place Brief. National Collections Facility (NCF site)

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

Notting Hill Housing & The Development Team

URBAN DESIGN BRIEF REPORT

The future of South Grove

OPTIONS QUESTIONNAIRE


Longbridge Town Centre Phase 2 Planning Application


LEWISHAM RETAIL PARK WELCOME

Proposed Student Accommodation Development

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA.

MANAGING GROWTH Tower Hamlets Perspective. Sripriya Sudhakar Place Shaping Team Leader

Background. The Round Chapel 1d Glenarm Road London E5 0LY Tel: E: iety.org

PHASE III: Reserved Matters Submission

Vision for East Cowes

WELCOME. Welcome to this public exhibition about the future of the Aylesham Shopping Centre.

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

Date: 23 January Grange and Riverside Ward. Deputy Chief Executive

1 INTRODUCTION 1.1 INTRODUCTION

Kidbrooke Village Forthcoming Planning Proposals Phases 3, 5 and 6

Masterplan development

Herne Hill and North Dulwich Herne Hill and North Dulwich Area Vision Map

NORTH CIRCULAR ROAD - REGENERATION IN ACTION

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

South of Eastern Strategic Direction Status Update

3.0 Area-Wide Strategies 30

Public Consultation. Land at Monks Farm, North Grove. Welcome

East Grove Public Realm

Draft Western District Plan

Welcome to Ashley Road South Masterplan Vision Event!

ISIS BCC MADE. Warwick Bar Development in Eastside Birmingham. Artist s Brief

MINUTES OF THE PLANNING COMMITTEE MEETING HELD MONDAY 19 TH JANUARY PM BURBAGE MILLENNIUM HALL

Design Guidance. Introduction, Approach and Design Principles. Mauritius. November Ministry of Housing and Lands. .. a

Barton-under-Needwood Village Improvement Scheme

LDF. Local Development Framework. Manor House Area Action Plan. Adopted January 2013 PJ50811

Welcome. Thank you for attending our first Early Input Opportunity Meeting. The Purpose of this meeting is to: Introduce you to the project team

City Plan 2036 At a glance

Welcome THE SITE PHASE 1 EXCLUSION ZONE.

Transcription:

London Legacy Development Corporation Quality Review Panel : McGrath Site Thursday Level 10, 1 Stratford Place, Montfichet Road, London E20 1EJ Panel Peter Studdert (chair) Adam Khan Tom Holbrook Dan Epstein Peter Lainson Attendees Rachel Gleave Sarah Jones Hannah Lambert Esther Everett Deborah Denner Tessa Kordeczka London Legacy Development Corporation London Legacy Development Corporation Fortismere Associates Fortismere Associates Apologies / report copied to Anthony Hollingsworth Allison De Marco Amy Thompson London Borough of Tower Hamlets

1. Project name and site address Wickside (McGrath Waste Transfer Station), Hepscott Road, London E9 5HH Planning reference: PREAPP/13/00024 2. Presenting team Guy Forrester Roger Castle Frank Green Robert Sakula Cany Ash Bridget Snaith Philip Chadda Austin Mackie Sven Münder Ash Sakula Ash Sakula Shape Landscape Regeneration TC Developments Austin Mackie Associates Ltd creative industry consultant 3. Planning authority s views Since the scheme for the McGrath site was first reviewed by the Quality Review Panel in March 2014, there has been a series of pre-application meetings with the planning authority. LLDC officers welcome the progress made and generally support revisions to the scheme, particularly in relation to the public realm. The planning authority is keen to ensure that the scheme is consistent with the broader masterplan for Hackney Wick, which includes a new north / south route anchored by Hackney Wick Station and connected to Neptune Wharf by a new bridge across the Hertford Union Canal. Detail of the design for the eastern part of the site will be dependent on the exact configuration of the bridge and its approach, plans for which are still evolving. It will be important that the proposed mix of uses for the McGrath site complements the planned new neighbourhood centred around the station. 4. Quality Review Panel s views Summary The Quality Review Panel is encouraged by the significant progress made since its previous review of the development of this large and complex site. It thinks that the proposals presented provide the basis for a successful scheme. At this stage the panel has addressed broader strategic questions and recommends further reviews to consider in detail the various blocks and public realm across the site. The panel also suggests that expanding the design team to include other architects could add to the richness and quality of the development. Comments are provided below on the development character, site, management, accessibility and sustainability strategies.

Development character The panel welcomes the approach taken to developing a characterful development on the site, including a coherent narrative and naming various components of the scheme such as the squares and quarters. It welcomes the analysis undertaken of the character of the area, including streets and yards, which is reflected in the strong juxtaposition of scales in the proposed scheme. The panel supports the retention and re-use of Victorian industrial buildings. The scheme introduces considerable diversity in the form, massing and architectural expression of its many elements. The panel agrees that this is appropriate for a large mixed use site, but suggests that some aspects of the scheme would benefit from a more rational and restrained approach. For example, the panel thinks that the proposed block along Wansbeck Road could be improved by fewer changes in height, and a simplified building form. The panel also suggests that given the scale and diversity of the site additional architects could add to the richness of the scheme. Site strategy: A12 / Wansbeck Road At a strategic level, the panel thinks that much could be done to improve the quality of the streetscape of Wansbeck Road which is vulnerable to air pollution and noise from the adjacent A12. For example, extending the verge opposite the site and significantly increasing the planting could help to create a less hostile and more attractive street. Because of proximity to the A12 the lower storeys of buildings along Wansbeck Road have been designated for industrial / commercial use. For industrial / commercial uses to be accommodated, service and delivery access from Wansbeck Road will need to be resolved. Management strategy The panel emphasises the importance of effective management of the development through a management company. This will be as important for the social and economic success of the scheme as it is for the buildings and landscape.

The strategic approach to accommodating creative industries is welcome. For this vision to be realised, however, it will be essential to ensure that workspace is affordable. This will need to be secured by a S106 agreement. It is encouraging that some industrial / commercial uses for example a brewery have already been identified. The panel supports the strategy of distributing a mix of uses across the site. Effective management will be equally important for ensuring the quality and maintenance of the public realm. The ambition of the landscape design means that it is unlikely that the London Borough of Tower Hamlets will have the resources to maintain it. Landscape strategy and public realm The panel notes that detailed proposals for the landscape strategy, including the canal frontage, have yet to be developed. At this stage, however, it suggests that it may be preferable to maintain a clear demarcation between the towpath and the proposed linear park. This would indicate a clear route for pedestrians and cyclists along the towpath. Along the towpath, considering separation between pedestrians and cyclists will be important, if this is likely to be used by commuting cyclists travelling at speed. Further information on parking, servicing and refuse collection would also be welcome at a future review. Accessibility Although detailed proposals for streets and the public realm have yet to be produced, the panel stresses the importance of adopting a consistent accessibility strategy across the site. The panel would like more information about how the landscape design achieves accessibility given the significant changes of level. The panel is concerned that visually impaired users may find Lock Road confusing if it changes from a traditional street to a shared surface midway through the site.

The panel thinks that a traditional street continuing to the canalside could be successful, and may feel less like private space. Finally, in terms of accessibility, the panel suggests a cautious approach to the use of strongly patterned paving, which can cause confusion for people with visual impairments. Sustainability The panel would like further information on the sustainability strategy for the development, including energy, water and biodiversity. Air pollution and noise are significant issues for this site and will need to be addressed. Considering how the development can be designed for long life and loose fit could also contribute to its long term sustainability. Next steps The panel looks forward to reviewing detailed designs for the different components of the scheme, including the various blocks and the public realm, as well as the sustainability strategy, before a planning application is submitted.