Community Workshop. City of Richmond. January 25, 2011 SF Bay Trail Connection - Castro St to Richmond-San Rafael Bridge

Similar documents
Public Meeting December 1 st, 2011

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Creating Complete Roadway Corridors:

Clay Street Bridge Replacement Project

I-70 Corridor Enhancement Plan

4.1 AESTHETICS AND VISUAL QUALITY

Introduction and Overview

Mississippi Skyway Preliminary Engineering Report

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

E. RURAL COMMERCIAL/INDUSTRIAL PARK MODEL

3.10 Land Use and Planning

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

9 th Street Sub Area Plan

California Environmental Quality Act (CEQA) Environmental Review Process

I-90 Mississippi River Bridge & Interchange Project

Downtown Cleveland Alliance/Tremont

Berkeley Strategic Transportation Plan

22a. Existing Condition. 22b. Simulation of NE 20th Street Alternative (D3)

Otay Regional Trail Alignment Study. Public Workshop March 14 th, 2017 from 5:30-8 p.m.

Workshop #1 Outcomes. The Planning Partnership

Corridor Enhancements

Appendix G Response to Comments

Office of Greenways & Trails Providing Statewide Leadership and Coordination. Southeast Greenways and Trails Summit October 1-3, 2017

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

10.0 Open Space and Public Realm

6.8 SCENIC HIGHWAYS Introduction

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

The West Vaughan Employment Area Secondary Plan Policies

Figure 3-1: Public Realm Plan

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Tricia Millington, RLA New York State Department of Transportation

URBAN DESIGN GOALS / POLICIES / MEASURES

Parks, Recreation, and Open Space Land Use Goals

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

LARKSPUR SMART STATION AREA PLAN Scope of Work

CHAPTER 10 AESTHETICS

Devil s Slide Coastal Trail Improvements Project. County of San Mateo

KEY MAP DEVELOPMENT PERMIT AREA MAP. Sunnymede North Sub-Area Plan

Asbury Chapel Subdivision Sketch Plan

REPORT TO: Council FOR: Regular Meeting. PRESENTED: April 1, 2008 FILE: , Byl 1932 & 1936

INTRODUCTION EXISTING CONDITIONS

Town of Weston Guardrail Overview Report

CITY OF LARKSPUR Staff Report. August 21, 2013 Council Meeting UPDATE ON TRANSPORTATION AUTHORITY OF MARIN (TAM) GREENBRAE CORRIDOR WORKING GROUP

CHAPTER FIVE COMMUNITY DESIGN

DRAFT Subject to Modifications

3.1 AESTHETICS Background and Methodology

SCTPO Project Summary September 2014

GREENBANK DEVELOPMENT MASTERPLAN

2 ALTERNATIVES AND OPTIONS

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Route 1 Corridor Study

LOCATION AND DESIGN DIVISION

8.0 Design and Form of Development 43/

1.0 Circulation Element

Access Management: An Overview

CHAPTER VIII Implementation

CHAPTER 2 - AFFECTED ENVIRONMENT, ENVIRONMENTAL CONSEQUENCES AND AVOIDANCE, MINIMIZATION AND/OR MITIGATION MEASURES

1 PURPOSE AND NEED 1.1 PURPOSE OF THE PROPOSED ACTION 1.2 NEEDS FOR THE PROPOSED ACTION

COASTAL CONSERVANCY. Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT. File No Project Manager: Megan Johnson

Transportation Research Center

HAMLET OF KINGMAN AREA STRUCTURE PLAN

TOWN BRANCH COMMONS & VINE STREET MOBILITY IMPROVEMENTS

The following principles guide the development of goals and strategies to protect and promote these amenities:

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR

T H A T E V E R Y O N E

Gibsons Foreshore & Seawalk Improvements

Potential Green Infrastructure Strategies May 6, 2015 Workshop

DRAFT MAP AMENDMENT FLU 04-4

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004)

PC RESOLUTION NO

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

NOTICE OF PREPARATION

BAY AREA PARKS & RECREATION

4-Town Comprehensive Plan DRAFT 7/30/07

Authority of the General Plan

Subcampus Recommendations

North Shore Trail. Council Meeting June 10, 2002

ARTICLE II CITYWIDE REGULATIONS

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Southern Gateway Project and Public Green

MIXED-USE ZONING DISTRICT DESIGN GUIDELINES

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

4.13 Security and System Safety

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

Roundtable Meeting #1

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 LOS ANGELES GREEN VISION PLAN. File No.: Project Manager: Marc Beyeler

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Parapet/Formliner/Fencing

M i s s i o n B a y W a t e r f r o n t

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

This page left intentionally blank.

Transcription:

Community Workshop City of Richmond 1

City of Richmond Lead Agency BPAC Richmond Community ABAG Design and Process Funding Partner Caltrans Environmental; Process Review Design Process State and Federal Funding Disbursement Chevron Key Stakeholder Funding Partner BCDC Shoreline Permitting US Coast Guard Homeland Security (MTSA) TRAC Community Liaison Design Team (Consultant) Project Management Analysis and Design Alternatives Recommendations 2

1. Project Purpose & Need 2. Project Goals & Constraints 3. Alignment Alternatives Studied 4. Proposed Design & Assessment Criteria 3

4

NORTH 1 2 RICHMOND- SAN RAFAEL BRIDGE 3 4 5

6

7

9

Close a Bay Trail Gap to create safe, inviting, convenient access for bikes & pedestrians. Unsafe and Inconvenient Access where California Code Mandates Safe & Convenient Access Lack of Connection where Economic, Recreational & Transportation Development Plans call for a Connection Inadequate Bike and Walk Infrastructure (Senate & Assembly Bills Mandate Enhanced Bike and Walk Infrastructure, SB 375 and AB 32) 10

11

13

14

15

Primary: Close a Key Gap in the Bay Trail 1. Replace existing unsafe bicycle-only access on Highway 580 and provide for pedestrian access between Castro Street and the Richmond/San Rafael Bridge Toll Plaza. Additional Goals and Objectives: 2. Safety 3. Encourage Bicycling and Walking 4. High Benefit to Cost Ratio 5. Create and Preserve Bay View Opportunities 6. Avoid Interim Solutions that do not Meet Project Goals 7. Facilitate Access to Trail Entry Points 16

17

RICHMOND- SAN RAFAEL BRIDGE NORTH 18

Project Study Area Looking North TOLL PLAZA NORTH 20

Project Study Area Looking North OFFICE HILL Steep Topography Narrow Streets Quiet Residential Area NORTH 22

Project Study Area Looking North Very Steep Street NORTH 23

Project Study Area Eastern Terminus Looking South NORTH 25

Project Study Area Looking South NORTH Parking? OFFICE HILL (Chevron) RETENTION POND 28

Project Study Area Looking South EPA FACILITY OFFICE HILL NORTH HIGH VOLTAGE TRANSFORMER RETENTION POND 31

Project Study Area Looking South NORTH OFFICE HILL 33

Project Study Area Looking South LONG WHARF NORTH TOLL PLAZA 36

Project Study Area Western Terminus - Looking South NORTH RICHMOND- SAN RAFAEL BRIDGE TOLL PLAZA 37

38

REFINERY FACILITIES CALTRANS RIGHT-OF-WAY TWIC AREA CALTRANS RIGHT-OF-WAY BOUNDARY TWIC BOUNDARY OFFICE HILL SECURE AREA CALTRANS RIGHT-OF-WAY OFFICE HILL MTSA BOUNDARY RESIDENTIAL AREA 40

HIGH VOLTAGE TRANSFORMER RETENTION POND OFFICE HILL RETENTION POND EPA FACILITY TWIC BOUNDARY OFFICE HILL MTSA BOUNDARY 41

B A B A 42

SECTION AA 44

Refinery Geometrics Constraints Envelope SECTION BB 45

RETAINING WALL 4 RETAINING WALL 3 PINCH POINT AROUND I-580 RETAINING WALL 2 OFFICE HILL TWIC BOUNDARY OFFICE HILL MTSA BOUNDARY 46

48

52

Federal Highway Administration (FHWA): Visual Quality of Existing Resources Vividnessis the visual power or memorabilityof landscape components as they combine in distinctive visual patterns. Intactnessis the visual integrity of the natural and manbuilt landscape and its freedom from encroaching elements. It can be present in well-kept urban and rural landscapes, as well as in natural settings. Unityis the visual coherence and compositional harmony of the landscape considered as a whole. It frequently attests to the careful design of individual components in the landscape. 53

1. Viability, Security, Safety of Refinery Operations. 2. Operation, Safety, Maintenance of I-580 Corridor. 3. Residential Security, Privacy, Quiet, Views. 4. Topography, Roadways, Utilities, Sub-surface Conditions. 5. Biological, Visual Resources Cultural, Historical. 54

55

57

1. Goals + Constraints -> Design Criteria & Assessment Criteria Geometrics Width, slope, mode separation needed to meet goals 2d & 3d envelope studies (where is ok for constraints) Lighting, construction, structure 2. Develop Alternatives 3. Systematic Assessment Functionality & Safety Aesthetics Cost, Constructibility, Process Compatibility with Existing Uses Screening for basic acceptability criteria Scoring to identify best alternative 58

59

61

Fencing Both Sides 62

Fencing Enclosed 64

Fencing Typeof Mesh 65

Fencing Straight 69

Fencing Angled 71

Width & User Separation 78

Pull outs & Stopping points 84

Adjacent to Vehicular Traffic Along a Retaining Wall 85

Adjacent to Vehicular Traffic Along a Fence 86

Adjacent to Vehicular Traffic Buffer Zone between Trail and Traffic 87

Functionality & Safety Grades Gentle, Hills not too High Pull-outs for safety and enjoyment Good Visibility, no blind corners Curves are not too sharp Aesthetics Freeway does not dominate experience Existing Bay Views are protected Bay View Opportunities are provided for 97

Cost, Constructability, Process Construction Cost Maintainability Constructability Permitting Process Compatibility with Existing Uses Environment Security Impact on Refinery Operations Impact on Residential Areas Impact on Highway I-580 98

Finalize Assessment Criteria & Process Second Public Meeting to Evaluate Alternatives Prepare Project Study Report for Caltrans Review Environmental Process (CEQA and NEPA) 103