SANTA FE COUNTY IFB# PW/KE CONSTRUCTION FOR THE SANTA FE MOUNTAIN CENTER KITCHENETTE AND OFFICE SPACE ADDENDUM #2

Similar documents
Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

Pinky Lewis Recreation Centre Interior Renovations in the City of Hamilton

FAIRA TRANSPARENCY REPORTS th St SE, #13A, Auburn, WA January 25, 2018

Single Family, Hamden, CT

FAIRA TRANSPARENCY REPORTS S 236th St, 10-5, Kent, WA 98032

FAIRA TRANSPARENCY REPORTS NE 117th Pl, #F8, Kirkland, WA 98034

FAIRA TRANSPARENCY REPORTS S 237th St, Kent, WA November 28, 2017

Coquille Indian Housing Authority Maintenance Report February 2017

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401

Scope of Work - Single Family, Carlsbad, CA

McLean Overlake New Home Features

Procurement Department ADDENDUM # 1

McLean Overlake New Home Features

TRADITIONS 2017 COLLECTION SINGLE SECTION HOMES

McLean Overlake New Home Features

Scope of Work - Single Family, San Diego, CA

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

FAIRA TRANSPARENCY REPORTS Hazel Loop SE, #D, Auburn, WA 98092

Axiom Property Inspections

Nims Village New Home Features

Opening Soon! Ian Weber & Sam Melendez (239) Gopher Tortoise Trail Lehigh Acres, FL drhorton.com/swfla

Every manufactured and modular home Champion builds is professionally designed and engineered. Built by craftsmen in a controlled factory

Bid Response: Formal Sealed Bid

Asurity 1. Property Inspection Report S Gurd Rd., Hastings, MI Inspection prepared for: Beretta Lenos Real Estate Agent: Stan Labinski -

FAIRA TRANSPARENCY REPORTS th St SW, Lynnwood, WA 98037

FAIRA TRANSPARENCY REPORTS Spruce Way, Lynnwood, WA August 21, 2017

Scope of Work - Single Family, San Diego, CA

Memphis Housing Authority High Rise Fire Alarm Upgrades. Questions from Contractors (Through Addendum #2) Communications Systems, Inc.

SAMPLE PUNCH LIST. Room Trade Item Work needed Completed? KITCHEN

FAIRA TRANSPARENCY REPORTS th Ave S, A304, Des Moines, WA March 13, 2018

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

Yes, any other system must be clean agent, and the Fire Alarm Control Panel must be a single addressable Fire Alarm Control Panel.

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS

FAIRA TRANSPARENCY REPORTS Country Club Dr, B-203, Mill Creek, WA April 5 th, 2017

Multi Family, New Haven, CT

FAIRA TRANSPARENCY REPORTS SE 279th St, Maple Valley, WA March 7, 2018

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM.

FAIRA TRANSPARENCY REPORTS S 272nd St, #39, Kent, WA September 1 st, 2017

Scope of Work - Single Family, Chula Vista, CA

Examples of Acclaim s Energy-Efficiency Green Technology

FAIRA TRANSPARENCY REPORTS Wells Ct S, Renton, WA 98055

RENTAL PROPERTY INVENTORY AND CONDITION FORM

Location and lifestyle meet in this great townhome by Domicile, located on a quiet cul-de-sac just steps from Parkdale Market, the Ottawa River,

SUMMARY 1234 Main St.Severn Buyer Name 07/18/2018 9:00AM

PROPERTY MANAGER S INVENTORY AND CONDITION REPORT

FAIRA TRANSPARENCY REPORTS W James St, 8, Kent, WA 98032

Ph: (907) Quality Homes

Scope of Work - Single Family, Oceanside, CA

FAIRA TRANSPARENCY REPORTS Alaskan Way, 514, Seattle, WA 98101

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

FAIRA TRANSPARENCY REPORTS th Ave NE B-3, Kenmore, WA March 28 th, 2017

Scope of Work Single Family, El Cajon, CA

FAIRA TRANSPARENCY REPORTS SE 240th Pl, Maple Valley, WA June 5th, 2017

Madison. The. leewoodfranklin.com THE MAD ON THE JEFFERSON THE MADISON

RW West Consultants. Property Inspection Report NE 199th St, Kenmore, WA Inspection prepared for: FAIRA/ Chris Ellis Real Estate Agent: -

TERRACE VIEW APARTMENTS

Jeff Brown Inspections

Move In Report. Report Information

Kitchen Planning Worksheet

THE CROWN SERIES. Coco, Jackson & Myrtle Floorplans REV *With Craftsman Package

Watson Home Inspection Services, LLC.

Cabinets & Appliances Countertops & Sinks

QUALITY FEATURES Trent 24 7 & ascot semi-detached

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

Scope of Work Single Family, Canal Winchester, OH

Standard Features. ashbysbridge.com. Mobile: (757)

TERRACE VIEW APARTMENTS

FAIRA TRANSPARENCY REPORTS th Dr NE, Marysville, WA June 14 th, 2017

Scope of Work - Single Family, San Diego, CA

FAIRA TRANSPARENCY REPORTS W Villa Monte Dr, Mukilteo, WA August 8 th, 2017

FAIRA TRANSPARENCY REPORTS. November 21, 2016

Inside Out Home Inspections

TERRACE VIEW APARTMENTS

1921 River Birch Dr., Shawnee, OK Inspection prepared for: Vicki Jager Date of Inspection: 7/27/2015 Time: 8am Weather: Sunny

FAIRA TRANSPARENCY REPORTS rd Pl SE, Maple Valley, WA April 4 th, 2017

The Salvation Army Southern Territory OFFICERS QUARTERS PROPERTY INSPECTION FORM

Interior & Exterior Finishes & Specifications for The Bradford & Weston Style Homes

TEXAS ASSOCIATION OF REALTORS RESIDENTIAL LEASE INVENTORY AND CONDITION FORM

FAIRA TRANSPARENCY REPORTS Brighton Pl, Mukilteo, WA 98275

THE HEMLOCK 3 BD 2.5 BA 1371 sq ft

EXHIBIT H. Tobytown Renovation Specifications

FAIRA TRANSPARENCY REPORTS NE 108th St, Redmond, WA April 4 th 2017

All In One Home Inspections

FAIRA TRANSPARENCY REPORTS. January 27 th, 2017

FAIRA TRANSPARENCY REPORTS nd Ave S, E-2, SeaTac, WA 98198

TheHeritage COLLECTION SINGLE SECTION HOMES

Getting Started. Gather Ideas. Visit our Showroom. What s next? Page 1 of 7

FAIRA TRANSPARENCY REPORTS st Pl SE, Sammamish, WA May 18 th, 2017

Closing Checklist. Mstr Hall/Clo. Mstr Bath. Guest Bath 1/2 Bath Kitchen Nook. Guest Hall. Utility Rm Garage Yard. Right Side Left Side Rear

FAIRA TRANSPARENCY REPORTS. 553 Chelan Pl NE, Renton, WA March 3 rd, 2018

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS

FAIRA TRANSPARENCY REPORTS th St SW, 301, Lynnwood, WA May 31 st, 2017

Scope of Work - Single Family, Escondido, CA

MAINTENANCE STANDARD LABOR CHARGE ESTIMATE AMOUNTS

Single Family, Hamden, CT

Eagle Ridge Builders Providing Quality Homes at Radiant Lake

Bay Wide Commercial and Home Inspection Thackeray Avenue/ Mail address Hayward, Calif TH AVENUE SAN LEANDRO, CALIFORNIA

Extra Mile Inspection, Inc.

Move-Out Condition Form

Transcription:

Henry P. Roybal Commissioner, District 1 Anna Hansen Commissioner, District 2 Robert A. Anaya Commissioner, District 3 2017-0262-PW/KE Anna T. Hamilton Commissioner, District 4 Ed Moreno Commissioner, District 5 Katherine Miller County Manager April 27, 2017 Dear Proponents, SANTA FE COUNTY IFB# 2017-0262-PW/KE CONSTRUCTION FOR THE SANTA FE MOUNTAIN CENTER KITCHENETTE AND OFFICE SPACE ADDENDUM #2 This addendum is issued to reflect the following immediately. It shall be the responsibility of interested Offerors to adhere to any changes or revisions to the IFB as identified in this Addendum No. 2. This documentation shall become permanent and made part of the departmental files. ATTACHMENT: Final Construction Documents for Santa Fe Mountain Center On April 11, 2017 Santa Fe County held the pre-bid conference and site visit for the above referenced Invitation for Bid (IFB). Addendum #1 was issued on April 19, 2017. The DEADLINE to submit proposals has been EXTENDED to 2:00pm (MDT) ON Thursday. May 4, 2017 at the Santa Fe County Purchasing Division, located at 142 W. Palace Avenue, (2 nd Floor Bokum Building), Santa Fe, NM 87501. QUESTION 1: Will stove in kitchen be electric or gas? Either way please specify power source? (Not shown on drawings) ANSWER 1: Electric Only, See Plans. QUESTION 2: Please specify power supply and location on electrical drawings for the following: ANSWER 2: See revised Electrical Plans for additional outlets. a. Electric Range Connection: b. Hood vent outlet: c. Garbage Disposal Outlet: d. Dishwasher Outlet: e. End of the Counter, Peninsula Outlet: 1

2017-0262-PW/KE f. West side of Range Outlet: g. GFCI at Sink? h. Emergency Lighting at (these are not noted in the Electrical Plans.) 1. Kitchenette: 2. Top of each set of Stairs: QUESTION 3: Please provide light fixture schedule for new lights in kitchen and office areas. ANSWER 3: New lighting in office area only, see revised plans with fixture schedule. The Kitchen light fixtures existing will change to LED bulbs provided there is funds available. Question 4: Do we need to provide support angles at all six (6) Mechanical floor penetrations? (If yes, please specify). Answer 4: Block with 2x6 at penetrations. QUESTION 5: A101 is calling for a new sink with disposal, Please provide power supply and location if needed for garbage disposal on electrical drawings? ANSWER 5: See revised electrical plans. QUESTION 6: Any Fire Alarm, Smoke detectors required on this Project? ANSWER 6: Building has existing alarm system & smoke detectors. QUESTION 7: There are no Special Systems shown on drawings, any data outlets/lines for new offices? ANSWER 7: Yes, there is one per an office please see the revised electrical plans. QUESTION 8: Is Existing Data Rack to remain in existing location, if so will power source have to be GFI protected if within 6 feet of sink? ANSWER 8: Yes, see the revised electrical plan. QUESTION 9: During the walk thru I noticed that Suite A and B have separate power supply's/panels. Yet the plan shows a shared circuit for the lighting and note 2 on E101 calls for both suite A and B's new circuits to go to panel 1. Please clarify? ANSWER 9: The revised electrical plans will clarify. QUESTION 10: Any lighting in warehouse closets (room 102)? if so please specify location and catalog # for light fixture. ANSWER 10: No 2

QUESTION 11: For the Add Alternates, 2017-0262-PW/KE ANSWER 11: No. a. Any lighting in water heater/ furnace closets (A 4/102)? if so please specify location and catalog # for light fixture. b. Any lighting in office closets (A 5/102)? if so please specify location and catalog # for light fixture. QUESTION 12: Are there any specifications for the kitchen appliances or the tile floor? If not is there a not to exceed budget? ANSWER 12: Appliances will be GE or Equal a.oven/range: (Free standing electric Range JBS10DFWW) b.hood Vent/Microwave: (Microwave and hood damper assembly JVM3160DFWW) c.kitchen Sink: (See Revised plumbing plans) d.kitchen Faucet: (See Revised plumbing plans) e.mop Sink (See Revised plumbing plans) f.mop Sink Faucet (See Revised plumbing plans) g.floor Tile (Daltile or Equal Cannes 18 x18 ceramic tiles) h.grout Color: (Beige) i. Casework: (Plastic Laminate see attached spec. sheets) j. Counter Tops (Formica or Equal see attached spec. sheets)oven/range: k. Cabinet Hardware: ( See attached specs) QUESTION 13: What will the paint colors be where needed? ANSWER 13: Sherwin-Williams Match color and sheen of existing Interior walls One coat primer & 2 coats finish. QUESTION 14: On the drawings there is a tie-in for a gas line; is that just for a gas stove? If an Electric Stove is used is there a need for a gas line? ANSWER 14: One gas line is needed. QUESTION 15: If the furnace closed in what are the plans to vent and provide fresh air? ANSWER 15: See the revised mechanical plans. QUESTION 16: Is there going to be Thermostat controls for the upstairs offices? How is that the temperature controlled in the new office spaces? ANSWER 16: There is no thermostat upstairs there is only one furnace. QUESTION 17: Please clarify where we connect to the return duct. Is this connection above the roof, below the roof, or below the second floor mezzanine? 3

ANSWER 17: See revised mechanical plans. 2017-0262-PW/KE QUESTION 18: On Page A101 and A102 Key Note 13 points to floor sink tile. However, this is noted as bringing handrail up to code, please clarify and provide what about the hand rails needs to be brought up to code? ANSWER 18: The Key Note 13 was changed to 17 to (TILE WAINSCOT TO 48 ). QUESTION 19: First Sheet titled A100, Index notes it as C100. Missing in the index is A001 and A002. ANSWER 19: The Sheet has been re-titled to C100. QUESTION 20: Note #4 on Sheet M101 is Exhaust Fan needed? ANSWER 20: The Exhaust fan is not needed if the Microwave Hood has the hood damper assembly vented thru wall to outside. QUESTION 21: In the IFB and the attached Contract Builder s Risk Insurance is talked about. Is the Contractor required to purchase Builder s Risk? ANSWER 21: Builder s Risk Insurance is not required to be carried by the contractor for the project but, the contractor is encouraged to carry it. Please add this Addendum #2 to the original bid documents and refer to bid documents, hereto as such. This and all subsequent addenda will become part of any resulting contract documents and have effects as if original issued. All other unaffected sections will have their original interpretation and remain in full force and effect. Bidders are reminded that any questions or need for clarification must be addressed to Karen K. Emery, Senior Procurement Specialist at kkemery@santafecountynm.gov. 4