HI-MAX INSTANT Indirect HIU First Fix Rail / Stand-off Kit Fitting Instructions

Similar documents
OPEN OUTLET TAPSETS. Fitting Instructions and User Guide

STREAMLINE OVERSINK. Fitting Instructions and User Guide _iss_05.indd 1 15/09/ :46:30

SuperChill 30B Installation and user manual

Aquatap (Boil only) Installation and user manual

HOTFLO 10 / 15. Fitting Instructions and User Guide

Streamline Undersink. Fitting Instructions and User Guide

Installation and User Instructions Aquarius Undersink Vented Water Heaters Models: AU7/3, AU7/1, AU10/3, AU10/1.

Aquatap (Boil and Chill / Boil and Ambient) Installation and user manual

SPEEDIBOIL Installation and User Instructions

Megalife Solar Vented Cistern Fed Water Heater Installation manual

Installation and User Instructions Instantaneous Hand Wash Models: EV 2008

HOTFLO 10 / 15. Fitting Instructions and User Guide

MULTIPOINT 30 & 50 Litre

MULTIPOINT SS H 50/80 & 100

Supreme 150SS, 165SS, 180SS Fitting Instructions and User Guide

Megalife Vented Cistern Fed Water Heater Installation manual

SUPREME 140, 155, 170

Installation and User Instructions Aquaheat Unvented Water Heaters Models: SS V 50/80 & 100

Handy No Touch Electric Handwash Fitting Instructions

Express 50 Litres Installation, operation and maintenance manual

Fitting Instructions and User Guide

Installation and User Instructions Instantaneous Hand Wash Models: EV 2008 No-Touch. EV 2008 No Touch

SPEEDIBOIL Installation and User Instructions. Models: SP2.5, SP5.0, SP7.5

Fitting Instructions and User Guide

Amptec Electric Flow Boiler Installation Instructions and User Guide

Stored Water District Heating Interface Units. Heat Interface Units

INSTALLATION and USER INSTRUCTIONS

IMPORTANT: PLEASE READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE COMMENCING INSTALLATION. PACK CONTENTS

HEATRAE SADIA. Installation and User Instructions for the UTC Undersink Vented Water Heater

THE REMEHA HIU RANGE Installation, operation and maintenance manual December 2017

Hotflo. Unvented point of use hot water

FRONT COVER (TOP) OUTLET WARNING LABEL RED IDENT ELECTRICAL CABLE ENTRY POINTS EARTH CLAMP INSULATION SHEET TERMINAL BLOCK FLYING LEAD MAIN PCB

UNVENTED MAINS PRESSURE WATER HEATER 100, 120, 150, 170, 210, 250 AND 300 LITRE DIRECT AND INDIRECT MODELS INSTALLATION AND SERVICING INSTRUCTIONS

Multipoint. Installation and User Instructions Instantaneous Hand Wash Models: EV 2008

MEGAFLO HE Iss 1

CEILING FED RISER RAIL KIT. Installation Guide. tritonshowers.co.uk/digital

Radiance Thermal Interface Units (TIU) RAPID - RTIU702XXX

HI-MAX STORE Installation, operation and maintenance manual

METRO BASIN MONO MIXER CHR

Amptec. Electric flow boiler

METIS. Installation instructions. Riser rail kit INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER.

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Unvented water heating

Combined electric boiler and domestic hot water store

Cyrene. Installation instructions. Fixed showerhead kit. Installers please note these instructions are to be left with the user.

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

THERMAL INTERFACE UNITS. Designed and manufactured in the UK. Designed for performance

Enzo Concealed Shower Mixing Valve

Cistern-fed water heating

These instructions must be left with the user.

Thermostatic Bar Valve

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

MEGAFLO Eco MEGAFLO HORIZONTAL SHRU IZI. MEGAFLO 1 Product 16 Guide INSTALLATION MANUAL

Multipoint Technical Data

INSTALLATION INSTRUCTION

Mio Concealed Shower Mixing Valve MI40010CP

Thermostatic mixing valve VADO-PRO-100P

Installation and Servicing Instructions. Alpha FlowSmart

Gas 220 Ace Cascade Assembly Manual

Unvented Direct & Indirect Hot Water Cylinders (400L L)

Express Thermo Shower Mixer Set With Handset THE QUALIFICATIONS INSTALLATION INSTRUCTIONS

Shower Panels with a Thermostatic Sequential Control

Herz York Direct Heat Interface Unit

Puro Mini Dual Control Shower Mixer PU90010CP

Installation and Commissioning Instructions FMU3 Floor Mixing Unit with Grundfos UPM3 Pump

Enzo Safe Touch Thermostatic Shower EZ10010CP & EZ10014CP

Technote. Frese AquaHeat HW - DH. Application. Design. Features and Benefit. Operation. Optional.

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

ALH SYSTEMS LTD ALH SYSTEM 1 SERVICE VALVE AND DRILLING MACHINE OPERATING MANUAL

Thermostatic Bar Valve THE QUALIFICATIONS INSTALLATION INSTRUCTIONS

TREVI BLEND SINGLE LEVER SHOWER VALVES. INSTALLER After installation pass to user for future reference

Deluge Concealed Shower Mixing Valve DL40010CP

Inta City Shower Mixing Valve CT20010CP

Traditional Rigid Riser With Eight Inch Rose

ELECTRIC SHOWER INSTALLATION and USER INSTRUCTIONS

Streamline. Vented point of use hot water

Grant Spira 6-26kW and 9-36kW Wood Pellet Boilers

Brassware. Thermostatic Bath Mixer With Shower Kit 1YEAR JM R E P L A C E M E N T R G U A R A N T E E

INSTALLATION AND SERVICING

Unvented Water Heaters. September Aqualine. Unvented Electric Water Heating

THERMOSTATIC SHOWER CONCEALED VALVE - TWIN WITH DIVERTER & TRIPLE WITH DIVERTER

INSTALLATION INSTRUCTIONS POINT OF USE WATER HEATERS EPU - US10 EPU - US15

Kiko Concealed Shower Mixing Valve KK80010CP

MK 8706 / MB 8706 CONCEALED THERMOSTATIC SHOWER VALVE INSTALLATION GUIDE

Thermostatic Bar Valve THE QUALIFICATIONS INSTALLATION INSTRUCTIONS

Enzo Safe Touch Thermostatic Shower EZ20011CP & EZ20012CP

Mira Sport Max with Airboost

These instructions must be left with the user.

Installation and User Instructions

Multipoint. Unvented point of use hot water

Telo Shower Mixing Valve TL10016CP

Hot Water Energy Storage THE HOT WATER PEOPLE HEAT INTERFACE UNIT ENGINEERED FOR ULTIMATE HEATING COMFORT AND MAXIMUM SYSTEM EFFICIENCY

Plus Bath Shower Mixing Valve CP and PL30020CP

Remote Water Quality System Standard Equipment (supplied by EPI) Remote Water Quality System Optional Equipment (supplied by EPI)

Enzo and Enzo Deluxe Safe Touch Thermostatic Shower EN10031CP & EN10035CP

UB110DNC/L/U/B BASIN MONOBLOC WITH NO POP-UP WASTE BASIN MONOBLOC TALL WITH NO POP-UP WASTE UB112DNC/L/U/B INSTALLATION INSTRUCTIONS

Mira Atom ERD Thermostatic Bar Valve

Handy Dri / Hair Drier

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

Bar valve with fixed and adjustable shower heads. Installation guide. Midas Plus installation instructions Page 1

Transcription:

HI-MAX INSTANT Indirect HIU First Fix Rail / Stand-off Kit Fitting Instructions HImax Instant

. Installation. General The Heatrae Sadia HI-MAX INSTANT unit can be supplied with an optional first fix rail or stand-off kit for ease of installation. The rail allows the installer to pipe up and test the pipework to and from the heat interface unit without the need to have the heat interface unit on site. The stand-off kits are available with the Heatrae Sadia HI-MAX INSTANT to allow the installer to reconfigure the connection positions. A safety valve discharge pipe connection is provided in the st fix rail to allow the installer to carryout all piping work at the same time. A cable entry point is provided in the top of first fix rail to allow the electrical contractor to route the power, room thermostat(s) and outdoor sensor cables into the unit. Stand-off kit - A. Water connections configurations The Heatrae Sadia HI-MAX INSTANT is supplied with the following connections: ) District heating flow connection /"bsp female ) District heating return connection /"bsp female ) Apartment heating flow connection /"bsp female ) Apartment heating return connection /"bsp female ) DHW cold feed connection /"bsp female ) DHW flow connection /"bsp female ) Safety valve discharge pipe mm Stand-off kit - B These can be reorientated with the use of a stand-off kit. A basic stand-off kit is available to allow the installer to change the direction of the pipework and still pipe directly to the first fix rail. Figure details the connection positions when using the first fix rail or stand-off kits. Figure : Hydraulic connection position options Stand-off kit - C Standard unit Stand-off kit - D

. st fix rail and stand-off kits Figure Different connection options First Fix rail - - Standard Configuration - :0:0 Top Connections: District Flow and District Return Bottom Connections: DHW Flow, Cold Feed, Heating Flow and Heating Return Basic Stand-off kit - :0:0 Top Connections: District Flow and District Return Bottom Connections: DHW Flow, Cold Feed, Heating Flow and Heating Return Stand-off kit - A - :0:0 Top Connections: District Flow, District Return, DHW Flow and Cold Feed, Heating Flow and Heating Return Stand-off kit - B - :0:0 Bottom Connections: District Flow, District Return, DHW Flow, Cold Feed, Heating Flow and Heating Return Stand-off kit - C - :0:0 Top Connections: District Flow, District Return, DHW Flow and Cold Feed, Bottom Connections: Heating Flow and Heating Return Note: Pressure relief valve discharge connection at bottom on all ID models Stand-off kit - D - :0:0 Top Connections: District Flow, District Return, Heating Flow and Heating Return Bottom Connections: DHW Flow and Cold Feed

. Dimensions and connections Figure Unit Dimensions () 0 Access for services Sides = 0mm Front = 000mm () Top = 0mm Bottom = 00mm () () Access is gained from the front. () Unit with st fix rail detailed, allow an additional 0mm when using the stand-off kits A, B, C and D. () Access for casing screws. Connection ID -0 & ID -0 () Community Heating Flow Connection /" BSP Female () Community Heating Return Connection /" BSP Female () Domestic Hot Water Flow Connection /" BSP Female () Apartment Heating Flow Connection /" BSP Female () Apartment Heating Return Connection /" BSP Female () Cold Feed Connection /" BSP Female () Heating Safety Valve Discharge Connection mm Pipe Note: All dimensions are in mm and are reference only

. Fitting Instructions. Access and mounting details Figure Minimum access requirements 00 00 0 0 Figure First fix mounting details Front access = 000mm It is important that all fixing holes (Hole No. in Figure ) are used as they give support to the valve rail. Failure to do so could lead to misalignment issues.. Wall fixing procedure ) Ensure that the access requirements have been met. ) Ensure the structure that the HIU will be fixed to will support the weight of the unit when full of water and with all its casings on. Max total unit wet weight = kg. ) Position the st fix rail / stand-off kit on the wall ensuring it is level using a spirit level and mark out the six fixing holes. ) Drill and plug the wall as necessary. ) Fix the st fix rail / stand-off kit to the wall using suitable fixings and check that it is still level using a spirit level. The unit is now ready to be plumbed in. CAUTION It is important that when piping to and from the st fix rail / stand-off kit that the connecting pipes are aligned with the connections on the st fix rail / stand off kit. Failure to do so could lead to damage of the isolation valves or misalignment issues. Once all plumbing work as been carried out the HIU can be fitted.. HIU fixing procedure ) Slide the four M studs on the st fix rail through the slotted holes in the Heatrae Sadia HI-MAX INSTANT CAUTION When fixing the HIU to the first fix rail it is important that you do not not over tighten the nuts on the studs provided. Maximum torque Nm. Use a torque adjustment spanner. ) M studs for HIU fixing. ).mm Dia hole for fixing the st fix rail to the wall or the st fix rail to the stand-off channels. ) Access holes to the stand-off kits wall fixing holes. The unit is only suitable to be installed in one orientation, ie. with the community heating system isolation valves positioned at the top. All hot and cold water pipes should be labelled and insulated in accordance with Part L of the Building Regulations. HIU's back plate and secure loosely with the M nuts provided. ) Insert the fibre washers supplied between the pipe connections on the HIU and the isolation valves / safety valve discharge pipe connection on the st fix rail. Lightly tighten up all of the connection nuts. ) Make any final adjustments to the HIU position on the st first rail / stand-off kit as necessary and tighten up all four fixing nuts. ) Gradually tighten up all flat face joints. CAUTION When connecting the HIU to the st fix rail / stand-off kit, do not over tighten the joints. CAUTION When piping to and from the st fix rail / stand-off kit, take care not to flex the bracketry as this could lead to misalignment issues.

. Flushing Bypass. Community heating flow and return connections The community heating (district heating) flow and return connections are located at the top of the HIU, unless stand-off bracket B is used, in which case they will be found at the bottom of the unit. Please see Figure on page for more details.. Community heating flushing bypass It is recommended that a flushing bypass arrangement is installed in the community heating flow and return pipes to the unit. The flushing bypass (FBP) is a pipe between the district flow and return pipes fitted with an isolation valve to allow the distribution network to be flushed free of debris during the installation and commissioning process (as detailed in Figure ). Note there are drain valves fitted in the HIU which can be used for forward and back flushing purposes during maintenance. Do not forward or back flush debris through the unit during the commissioning phase of the installation. Note there is a drain valve fitted in the cold feed pipe in HIU, this can be used for flushing the cold water supply pipework prior to filling the hot water system. Figure : Community heating flushing bypass FBP FBP FBP FBP HM HM HM HM HM HM HM HM HM HM HM HM P S P S P S P S P S P S P S P S S S S S Flushing Bypass during maintenance and commissioning Flushing Bypass during normal HIU operation Flushing Bypass during forward flushing Flushing Bypass during back flushing Legend Valve open Valve closed Water flow

. Spares Spares - st fix rail Spares - Basic Stand-off kit Spares - Stand-off kit A 0 Spares - Stand-off kit B 0 0 Spares - Stand-off kit C Spares - Stand-off kit D 0 0 0 0 Spare Part Number Ref Part Description ID -0 (:00:0) ID -0 (:00:0) Isolation valve - district flow. /"bsp male/female with RED butterfly handle and x/" gaskets. 0 0 Isolation valve - district return. /"bsp male/female with BLUE butterfly handle and x/" gaskets. 0 0 IP Cable gland GW0 0 0 Locking nut /" set of 0 0 Pipe. Ball valve connection elbow 0 F/F complete with x /" gaskets. 0 0 Pipe. mm Safety valve discharge pipe (lower) complete with x /" gasket. 0 0 Isolation valve - heating flow / DHW flow. /"bsp male with RED butterfly handle complete with x /" gaskets. 0 0 Locking nut /" set of 0 0 Isolation valve - heating return and cold feed. /"bsp male with BLUE butterfly handle complete with x /" gasket. 0 0 0 Stand-off channel. 0 0 Pipe. DHW flow stand-off pipe. 0 0 Pipe. Heating flow stand-off pipe. 0 0 Pipe. Cold feed and heating return stand-off pipe. 0 0 Pipe. District flow stand-off pipe. 0 0 Pipe. District return stand-off pipe. 0 0 Not detailed Gasket & fixing set st Fix. 0 0

After Sales Service T: 0 F: 0 E: heatraesadiaservice@heateam.co.uk www.heatraesadia.com Heatrae Sadia, Hurricane Way, Norwich, Norfolk, NR EA, United Kingdom. SPARES STOCKISTS: Advanced Water Company Ltd Unit D Enterprise Way Vale Park, Evesham Worcs, WR GS T: 0 00 F: 0 00 Electric Water Heating Co Horsecroft Place, Pinnacles, Harlow, Essex, CM BT T: 0 0 E: sales@ewh.co.uk SPD Units & 0 Hexagon Business Centre Springfield Road, Hayes, Middlesex, UB 0TY T: 00 0 Parts Center T: 0 0 00 W: www.partscenter.co.uk Newey & Eyre Unit // Wassage Way Hampton Lovett Industrial Estate Droitwich, Worcestershire, WR 0NX T: 00 00 F: 00 0 UK Spares Ltd Unit, Aztec West, Almondsbury, Bristol, BS TF T: 0 000 William Wilson Ltd Unit A, 0 South Street, Whiteinch, Glasgow, G 0SY T: 0 0 Alternatively contact your local supplying merchant or wholesale branch. 00_issue_0