No.2 Whitehall Riverside, Leeds July 2013

Similar documents
Artists impression of the Park Promenade and plot H4 with café and restaurant uses that is still subject to change

Introduction to MP3. MP3 H4 Park Central (North)

New Street Proposed Redevelopment Architecture & Urban Design Brief

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.

Site 5 Development Brief

public spaces and accociated development

Potten End C of E First School Proposed Expansion to One Form Entry Primary Planning Consultation Presentation

I615. Westgate Precinct

Waikato Innovation Park Masterplan. 13 NOVEMBER 2015 Prepared for Waikato Innovation Park Limited // Prepared by Beca

COURTHOUSE CAMPUS BARNSLEY Executive Summary March 2010

Bel-Air Lexus Automobile Service Station

design & access statement Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping

ADELAIDE COMETS CLUBROOMS DESIGN CONCEPT

INDOOR SPORTS COMPLEX PROJECT BRIEF

Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

City of Redlands Architectural Guidelines for Non-Residential Development

North Oakville East Parks Facilities Distribution Plan. November, 2009

Former Keighley College Buildings, North Street

Armourers Court, Woolwich

Birmingham University, Pritchatts Road, Adjacent to Gisbert Kapp Building, Edgbaston, Birmingham, B15

Site Planning. 1.0 Site Context. 2.0 Pedestrian Circulation Systems. Pag e 2-23

TURNING CONCEPTS INTO REALITY

URBAN DESIGN BRIEF REPORT

Eastside Locks (Building 5), Plot C, Land at Cardigan Street/Belmont Row, Birmingham, B4 7RJ

YMCA Erdington (Phase 2), 300 Reservoir Road, Erdington, Birmingham, B23 6DB

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

Stadium District Masterplan

(DC1) Direct Development Control Provision DC1 Area 4

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016

THEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC

Stoke Newington High Street 1.0 Site Analysis

Eastside Locks (Building 6), Plot C, Land at Cardigan Street/Belmont Row, Birmingham, B4 7RJ

6.0 Access & Maintenance

In partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

Huddersfield Urban Design Framework. 3. Framework

Proposed Mixed-Use Development at Barking Road, Newham, London. Design & Access Statement. March 2013

t wo t a be r n ac l e s t r e e t shoreditch london

DESIGN & ACCESS STATEMENT - PART I. Blythe Valley Park - Plot F5 Development. webbgray

4. MASTERPLAN FRAMEWORK

Integrated Building Environmental Design Case Study: Beijing Parkview Green

UNIVERSITY OF TORONTO FACULTY OF LAW

3.1 The hybrid planning application proposes the following description of development:

WINDSOR GLEN DESIGN GUIDELINES

A new park will be delivered as part of the Elephant Park regeneration.

Plots L4 & L5 Marchwood Industrial Park Presentation to Marchwood Parish Council 27 th February 2017

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

/05 Architectural Response

CHESAPEAKE CHILD DEVELOPMENT CENTER

A1 Portrait: Pdf/print with bleed & slug

Surface Materials Strategy Reference Images

Carton Avenue Action Area Plan Maynooth

CRYSTAL CITY BLOCK PLAN # CCBP- G 1

WELCOME. Spend a little Live a lot. View of store entrance, overlooking the adjacent park - bonded warehouse detailing

East Grove Public Realm

UK-GBC Project Case Study Smithfield, Manchester

Urban Design Brief. 875 Wellington Road. Proposed One-Storey Fast Food Restaurant and Two-Storey Restaurant. Wellington Harlech Centre Inc.

Design and Access Statement Planning Application: Royal Wharf Marketing Suite Ref: DAS. September 2014 Arup Associates

Clairtrell Area Context Plan

Lecture 4 Circulation MoveMent through Space

ILLUSTRATIVE MASTERPLAN

Proposals for a new college and homes. Thank you for visiting our exhibition.

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

40 UPPER HEIDELBERG ROAD, IVANHOE PLANNING REPORT

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon

1.2: Worked Example: Plot WV04 (North East)

GREENFORD HALL & ADJOINING LAND

DEVELOPMENT DESIGN GUIDELINES

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

I404 Beachlands 2 Precinct

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

PLANNING COMMITTEE AGENDA 28 April 2016

Poolbeg West SDZ Draft Planning Scheme

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Site 2 Development Brief

DESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018

West Street Underpass View

Building Regulations Part M 2004 Access To And Use Of Buildings Checklist Of Provisions/Areas For Consideration

ARCHITECTURAL DESIGN BRIEF

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

4.00 STAKEHOLDERS. urbanprojects

Housing Development at Balloonagh Tralee Co Kerry

therry, elizabeth, franklin and queen: BLOCK plan

Mixed Use Centres Development Permit Guidelines

Keystone Business Park Precinct Structure Plan North East Industrial Precinct. Part 2 Design Principles

5.1 Site Plan Guidelines

CENTERS AND CORRIDORS

T O W N O F A J A X URBAN DESIGN GUIDELINES FOR MOTOR VEHICLE GAS BARS / SERVICE CENTRES

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

Lighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1

Schematic Design Proposal Presentation

0.0 Design and Access Statement. South Shields & Westoe Club / 11-17

3.1 community vision. 3.3 required plan elements

PLANNING APPLICATION REPORT

Transcription:

No.2 Whitehall Riverside, Leeds July 2013

New Office_ View from Whitehall Road

New Office_ Site location No.2

New Office_ Site location

New Office_ Proposal in context 1

No.2 Whitehall Riverside No.1 Whitehall Riverside New Office_ Proposal in context 2 n

Multi-Storey Car Park No.2 Whitehall Riverside New Office_ Proposal in context 3 No.1 Whitehall Riverside

Scheme Design_ Current Outline Planning application No.1 Whitehall Riverside

Drop off point leading to entrance court Existing no-build zone Dedicated high quality reception areas New shared surface feature roundabout with sculpture and drop off at entrance to office New integrated ramp and water feature Existing landscaping Site in context_ Landscape Not to Scale Enclosed circular light well through building to ground floor n

No.1 Leeds Wellington Place. Northern Street No.2 Whitehall Riverside 5 Scheme Design_ Key View 5: Whitehall Road looking away from Leeds City Centre

New Office_ Landscape precedent

Ground floor office with strong kerbside presence on Whitehall Road Ground floor office with strong kerbside presence on Whitehall Road Reception 1 Reception 2 Back of House servicing 1.5m planning grid 0m 15m Atrium New Office_ Ground Not to Scale

New Office_ Reception Hall

Canopy from drop-off to entrance Centralised core allows for 1-4 separate tenancies Atrium Level < 1 1.5m planning grid Strong riverside frontage 0m 15m New Office_ Level 1 Not to Scale

Level 4 Level 3 Level < 2 1.5m planning grid Atrium 0m 15m New Office_ Level 2, 3 and 4 Not to Scale

Level 6 Level < 5 Atrium 0m 15m New Office_ Level 5 and 6 Not to Scale

Level < 7 Roof Garden 0m 15m Roof Garden_ Precedent New Office_ Level 7 Not to Scale

Cycle storage. Access via MSCP adjacent Showers and Changing @ 10% of cycle accommodation to achieve BREEAM Excellent credit. QUANTUM 66 car parking spaces (inc. 3 disabled) 10 motorcycles 72 bicycles 0m 15m New Office_ Basement Not to Scale

GROUND Riverside_ 9,591ft² Whitehall Rd_ 3,068ft² 12,659ft² LEVEL 1 Riverside_ 10,947ft² Whitehall Rd_ 6,717ft² 17,664ft² LEVEL 2 Riverside_ 12,260ft² Whitehall Rd_ 8,396ft² 20,656ft² LEVEL 3 Riverside_ 12,260ft² Whitehall Rd_ 8,396ft² 20,656ft² LEVEL 4 Riverside_ 12,260ft² Whitehall Rd_ 8,396ft² 20,656ft² LEVEL 5 Riverside_ 12,734ft² Whitehall Rd_ 8,396ft² 21,130ft² LEVEL 6 Riverside_ 12,734ft² Whitehall Rd_ 8,396ft² 21,130ft² LEVEL 7 Riverside_ 10,441ft² Whitehall Rd_ 8,396ft² 18,837ft² New Office_ Arrangement Not to Scale

Gross Internal Area Nett Internal Area Floor Sq.m Sq.ft Sq.m Sq.ft Nett: Gross Basement Parking and Plant 2,554 27,491 - - Ground Floor Reception Areas Ground Floor Office_ Whitehall Rd Ground floor Office_ Riverside 674 7,255 1,666 17,933 - - 285 3,068 891 9,591 50% Level 1_ Whitehall Rd Level 1_ Riverside Level 2_ Whitehall Rd Level 2_ Riverside Level 3_ Whitehall Rd Level 3_ Riverside Level 4_ Whitehall Rd Level 4_ Riverside Level 5_ Whitehall Rd Level 5_ Riverside Level 6_ Whitehall Rd Level 6_ Riverside Level 7_ Whitehall Rd Level 7_ Riverside Roof 2,178 23,444 624 1,017 6,717 10,947 2,222 23,918 780 1,139 8,396 12,260 2,222 23,918 780 1,139 8,396 12,260 2,222 23,918 780 1,139 8,396 12,260 2,266 24,391 780 1,183 8,396 12,734 2,266 24,391 780 1,183 8,396 12,734 2,266 24,391 780 8,396 970 10,441 75% 86% 86% 86% 87% 87% 77% TOTAL (Excluding Basement, and roof plant) 17,982 193,558 14,250 153,387 79% New Office_ Quantum

New Office_ Space Planning Level 1 Not to Scale New Office_ Space Planning > 20,656ft² single open plan floor > 350 people over 2 floors > This floor 128 workstations + breakout and ancillary accommodation

New Office_ Space Planning Level 2 Not to Scale New Office_ Space Planning > 20,656ft² single open plan floor > 350 people over 2 floors > This floor 222 workstations + breakout and ancillary accommodation

< ---------------------------------------- 67m ------------------------------------------ > < --------- 24m ---------- > < 8m > < ------------------ 39m ------------------------ > New Office_ Key Dimensions Not to Scale

MONTH STAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Outline Planning Aug 13 Detailed Planning Nov 13 Tender Preparation Jan 14 Contractor pricing Mar 14 Section 106 Award Contract / Mobilisation Apr 14 Start on Site May 14 Oct 15 Fit Out Dec 15 New Office_ Anticipated Programme

D2 Unit at Ground Level No2 Whitehall Ramp in to MSCP 20m Diameter Turning circle Ramp in to No2 Pick up / Drop off area New Office_ MSCP and Masterplan Not to Scale Riverside walkway n

No. 2 Whitehall Riverside undercroft car park Pedestrian access to lift & stair to all floors Shallow ramp parking, 72no. spaces per floor @ 1:23 gradient Escape stair Office core Vehicular access up to multi storey car park Adjacent available office plot Service access to adjacent office Ramped access down to adjacent office undercroft parking @ 1:7 gradient Ramped access down to adjacent office undercroft parking @ 1:7 gradient Ramped access up to multi storey car park @ 1:10 gradient New MSCP_ Integration with proposed office

Pedestrian access to lift & stair to all floors Roof mounted photo voltaic cells Escape stair Service access to adjacent office Vehicular access up to multi storey car park Ramped access down to adjacent office undercroft parking @ 1:7 gradient Adjacent available office plot New MSCP_ Integration with proposed office

MSCP Core located away from corner to minimise impact of wind. Glazing allows activity to be expressed and circulation areas to be naturally lit and well seen. GYM 5m high, primarily clear glazed ground storey KEY MSCP An aluminium cladding system is proposed whereby a sequence of randomly orientated cowls allow sufficient free area for natural ventilation whilst creating an interesting texture and pattern that disguises the utilitarian structure behind. Design Code_ MSCP

KEY Pavilion The location of the pavilion within a landscaped garden presents the opportunity for a unique single story building at the entrance to the site. It is envisaged that this will become a coffee shop / café with a small external area for when weather permits. The material palette will be subject to reserved matter discussions however an initial indicative concept is shown here. The proposal would be for a circular, drum like building, predominantly glazed with a shroud like enclosure. The precedents across the page show a variety of similar precedents, each unique in character and location but relevant in treatment of form and material. Design Code_ Pavilion

Design Code_ Pavilion_ Precedent studies

Reflective coating on glass limits solar gain and reduces need for cooling thus minimising energy expenditure 50:50 Solid to void ratio to contribute towards minimising solar gain Vision glazing panel has reflective coating minimising solar gain 2.8m Floor to Ceiling Glazed look-a-like panels with laminate interlayer Aluminium spandrel flush within curtain wall system Energy efficient mechanical ventilation with heat recovery maintains fresh air and comfortable temperature Planar glazed ground and first floor Roof mounted Photovoltaic panels generate renewable energy and contribute towards BREEAM Excellent rating. Large roof area will allow significant renewable gains from photovoltaic sand solar hot water heating. New Office_ Façade build up and Sustainability

New Office_ Material precedent

New Office_ View from Whitehall Riverside

New Office_ View from Whitehall Road