PRE-CONSTRUCTION CONFERENCE AGENDA 2:00 PM October 8, Type of Work: Grading, Concrete/Bituminous Paving, Storm Sewer, Watermain, Signal/Lighting

Similar documents
Mr. Burke presented the Airport and Boeing s badging process and public safety issues as outlined in the attached meeting agenda.

ELEVATOR RESCUE PROCEDURE

Phase 2 Security Response

Master Emergency Action Plan. NHA Johnston Project 40 Scholar Drive, Clayton, NC 27520

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road

ALEXANDRIA. Fire Department Impacting Lives, Empowering Future Leaders. Annual Report

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University

ALLIED FIRE & SAFETY EQUIPMENT CO.,INC.

DUNCAN STUDENT CENTER. Emergency Action Plan

Minnesota Erosion Control Association EROSION MATTERS

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room

Emergency Action Plan

HEALTHWEST PROCEDURE. No Prepared by: Effective: February 6, 2008 Revised: June 5, 2017 Environment of Care Committee

Policies and Procedures for the Missouri Master Gardener Program

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University BLUE BAND BUILDING ( )

Ada Township is soliciting bids for the following commodity or service:

KALAMAZOO METROPOLITAN COUNTY PLANNING COMMISSION (KMCPC)

1700 Pratt Drive, Blacksburg, VA Main Entrance Receptionist Desk

Fall 2017 Construction Update

Cleaning Contract Maintenance Specifications General Information

Art and Antique Vendor Application

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Railroad Commission of Texas Pipeline Evaluation System Incident Updates Inspection Package ID =

CITY OF KELOWNA MEMORANDUM. Date: June 20, 2001 File No.: Z City Manager Planning and Development Services Department

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University

Environment and Natural Resources Trust Fund 2009 Phase 2 Request for Proposals (RFP)

Legislative Report. High Pressure Boiler Attendance Rule. October 1, Lafayette Road North St. Paul, MN

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University

Design and Sustainability for Winter Operations

Minister of the Environment Representative

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION METAL AND NONMETAL MINE SAFETY AND HEALTH REPORT OF INVESTIGATION

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

RISK, RESILIENCE, AND RESPONSE APRIL 23, 2019

OPTI PUMP TRAINING COURSE OUTLINE

Fire Safety Account Financial Report for Fiscal Year 2018

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University ARTS COTTAGE ( )

CITY OF FORT BRAGG EMERGENCY ACTION PLAN

MANUAL OF PROCEDURE. Keys and Access Control (Standard and Electronic)

EMERGENCY POWER PLAN BELLE VISTA RETIREMENT HOME, INC. AL7261 BELLE VISTA BLUFFS, INC. AL7888

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

Request for Qualifications. Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design

CONNECTION, ENERGISING, COMMISSIONING AND PERMANENT DISCONNECTION OF HIGH VOLTAGE APPARATUS

EMERGENCY ACTION PLAN: Building Evacuation

Austin Independent School District Police Department Policy and Procedure Manual

Water Heater Innovations Marathon Water Heater Limited Warranty Policies & Procedures

Fire Protection Essentials QA/QC Plan Sample

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

An inspection of the above noted operation was conducted on January 10, 2019 by Resource Management Officers Norm McCowan and Jayda Robillard.

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

SECONDARY EMERGENCY ACTION PLAN: Building Evacuation

ALEXANDRIA Fire Department Impacting Lives, Empowering Future Leaders Annual Report

Commonwealth of Virginia Department of Health Division of Onsite Sewage, Water Services, Environmental Engineering and Marina Programs

ENVIRONMENTAL HEALTH AND SAFETY. Power Washing Guidelines

World-Class. Solutions

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

SECTION 605 PLANTING

Trinity River Authority of Texas

Key Event Spaces Use Protocols. Facilities and Services Group

Downtown Redevelopment Project Update

PUBLIC WORKS FREQUENTLY ASKED QUESTIONS

Route 7 Reconstruction and Widening, Wilton. State Project Nos & 124. Wolf Pit Road to just north of Olmstead Hill Road

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

SOAH DOCKET NO PUC DOCKET NO

TABLE OF CONTENTS ABOUT 3 HISTORY 4 MISSION 4 WHY GLOWING HEARTH & HOME 5 BUILDER SALES TEAM 6 BRANDS WE CARRY 8 TESTIMONIALS 9 SELECTION CENTERS 10

Hospice of Rutherford County Policies and Procedures

Cumberland Comprehensive Plan Town Council adopted August 2003, State adopted June 2004 TABLE OF CONTENTS

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Improving an Urban Watershed The Past, Present and Future of Addison Creek

OHIO UNIVERSITY RADIATION SAFETY REVIEW

ADDENDUM No. 3 BID NO TRANSMISSION WAREHOUSE OFFICE REMODEL

REQUEST FOR QUALIFICATIONS

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS

X0.01 Emergency Management. Approved: September 27, 2002 Revised: July 15, Next Scheduled Review: July 15, 2014 PROCEDURE STATEMENT

Emergency Action Plan For

GREENVILLE-SPARTANBURG AIRPORT DISTRICT REQUEST FOR PROPOSALS FOR DEVELOPMENT SERVICES FOR GSP AIR CARGO FACILITY PHASE 1

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Project Memo. IDNR State Revolving Fund

Emergency response lock box unit contents and maintenance.

GUIDELINES FOR TEMPORARY FOOD SERVICE PREMISES

DRIVEWAY APRON REPLACEMENT WITH STREET RECONSTRUCTION

The project manager Chris Darity was excellent throughout the entire process.

CLARK CO.COMBINED HEALTH DIST COUNTY ONLY - MASTER PLUMBERS LIST

Alternate Evacuation Route B: Secondary direction of egress considered safe with the information available.

Gwinnett County Land Disturbing Permits. Presented by the Departments of Planning & Development Public Utilities October 2001

Laser Safety Subgroup Charter

Annual Report. Year Logan-Rogersville Fire Protection District 3427 S. State Highway 125 Rogersville, MO (417)

Transportation Systems and Utility Infrastructure

SAINT CHARLES COUNTY ROAD BOARD Minutes of June 15, 2016

2014 ANNUAL REPORT OF THE CONDITION OF ROADS, BRIDGES & CULVERTS IN RICHLAND COUNTY, OHIO Richland County Engineer, Thomas E. Beck, P.E., P.S.

2019 Landscape Awards

This ORDINANCE shall be known as the [insert name of Entity] Regional Landscape Water Conservation Ordinance.

GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES

SOIL EROSION AND SEDIMENT CONTROL

Transportation Committee

CHEROKEE METROPOLITAN DISTRICT 6250 Palmer Park Blvd., Colorado Springs, CO Telephone: (719) Fax: (719)

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Transcription:

Project No.: SAP 055-622-050 / SAP 055-633-003 Location: CSAH 22 / CSAH 33 Type of Work: Grading, Concrete/Bituminous Paving, Storm Sewer, Watermain, Signal/Lighting Contractor: Hoffman Construction Company I. Personnel Assigned to Project A. County County Engineer - Kaye Bieniek Project Supervisor - Scott Holmes (cell: 507-273-6893) Project Inspector(s) - Clint Larson (cell: 507-273-5288) Zach Demmer (cell:507-273-0291) Kent Haugen (material/lab cell: 507-208-0844) B. Prime Contractor Project Manager Shawn Hoffman, 715-896-2037 Superintendent Shawn LaFaunge, 715-896-1508 Foreman Jason Ivers, 715-533-2331 C. Sub-Contractor - Request to Sublet forms and list of Supervisors II. Schedule Information A. Proposed Starting Date: October 20, 2015 B. Completion Date: September 1, 2017 (Proposal Date) will push to get most done in 2016 C. Project Staging/Operations: East of river work to be starting first. West side of CSAH 33 constructed before east side. West of river work to begin mid-summer. D. Scheduled Hours and Days: (Hoffman) M-F, 10 hour days, possibly a Saturday (Minnowa) bridge, 6 days a week

III. Suppliers & Materials A. Material certifications Mix designs shall be submitted B. Material storage County owns property in some locations, so if area is needed contact Olmsted County IV. Utilities Gopher State One Call, 800-252-1166 A. Century Link will replace everything on east side of CSAH 33. Will submit a plan for relocating in a couple weeks. Relocation could be complete as early as December 2015. B. Charter Communications Overhead on poles (People s) West River Road. Has moved on 48 th Street. C. City of Rochester Sanitary No additions D. Minnesota Energy Resources on existing 55 th Street west side. Relocation on 48 th Street this fall. CSAH 33 4 to 6 steel to all be relocated March start-up. E. RPU Water Included in plans located on the east side of CSAH 33 F. RPU Electric - Overhead transmission line along CSAH 33 to be moved to the west. Award to contractor in the spring. G. People s Energy Cooperative CSAH 33 poles to be adjusted. West River Road need clearing of trees to move poles. V. Traffic Control A. Contractor Supplier Warning Lites of MN B. Safety Officer Chris Meyer, 612-770-9154 C. Names & Numbers of two, on-call traffic maintenance personnel Richard Hart 507-208-1335 Justin Klunder 507-208-1629 D. Inspection of Devices - Daily E. Special Traffic Control Requirements Lots of traffic stages on project so make sure setup is correct.

VI. Safety A. Safety Policy will send B. Safety Officer Gary Kaas 715-896-2047 C. Sub s & Suppliers aware of Safety Compliance - Yes D. Onsite safety meetings Daily team meetings/weekly project meeting VII. Labor Provisions A. Prevailing wage paid by Prime and all Subcontractors - see special provisions B. Poster and Notices Displayed first day of work will display at work site/office trailer Displayed at a common site accessible to employees C. Required Posters See special provisions D. Payroll Clerk - Name and Telephone Number: Lisa Sheffer, 715-284-2512 x 144 County requires all payroll be submitted for life of project E. Wage Interviews County conducts random prime and sub-contractor employee wage interviews VIII. EEO Provisions A. EEO Policy Non-discriminatory, harassment-free and violence-free work site B. EEO Officer - Name and Number: Jessica Peterson, 715-284-2512 x 148 C. Employees aware of Policy and Officer? Yes IX. Discussion Items A. Erosion Control/NPDES Permit - Inspection

B. R/W property concerns CSAH 33 should receive title & possession on March 7, 2016 C. Contract Paperwork Egram D. Field Office Location Possibly on 55 th Street west of East River Road E. Overruns/underruns - Contractors responsibility to notify the County F. Construction staking ROW staking should begin soon G. Construction Projects upcoming in area East River Road culvert replacement/bituminous preservation on West River Parkway H. Cascade Creek Project Possibly needing trees and root balls. I. Wetland Permit Skip will check on availability to clear and grub before permit approval. K:\PW\Highway\Engineering\Projects\55TH ST\Construction\Documents\Preconstruction Agenda.docx

PRECONSTRUCTION CONFERENCE ATTENDEES SAP 055-622-050 / SAP 055-633-003 NAME REPRESENTING/FIRM EMAIL Address TELEPHONE/FAX NO. Scott Holmes Olmsted County holmes.scott@co.olmsted.mn.us 507-328-7025 Kaye Bieniek Olmsted County bieniek.kaye@co.olmsted.mn.us 507-328-7060 Kevin Dunagan Rochester Public Works kdunagan@rochestermn.gov 507-328-2470 George Calebaugh Rochester Public Works gcalebaugh@rochestermn.gov 507-328-2430 Charlie Dartusek J & R Larson jrlgrounds@yahoo.com 952-369-4192/952-469-6585 Lenny Laures Cascade Twp Lenny.township@gmail.com 507-254-6625 Chad Lind Doyle Conner Co. Chad@doyleconner.com 507-993-5444 Ben Wolf MN Energy bdwolf@minnesotaenergyresources.com 507-529-5132 Andrew Dohrmann MN Energy aedohrmann@minnesotaenergyresources.com 507-529-5129 Chad Jurgensen Olmsted County jurgensen.chad@co.olmsted.mn.us 507-319-7219 Travis Martin Olmsted County martin.travis@co.olmsted.mn.us 507-208-5325 Eric Anderson Olmsted County anderson.eric@co.olmsted.mn.us 507-328-7060 Kent Haugen Olmsted County haugen.kent@co.olmsted.mn.us 507-208-0844 Ben Johnson Olmsted County Johnson.benjamin@co.olmsted.mn.us 507-328-7060 Skip Langer Olmsted County SWCD skip.langer@mn.nacdnet.net 507-280-2850 Nick Schneider Nietz nps@nietzco.com 507-208-0627

Quentin Thorson Minnowa Construction qthorson@minnowa.com 507-951-4565 Brian Connell Minnowa Construction bconnell@minnowa.com 507-993-2792 Jim Brink Minnowa Construction jbrink@minnowa.com 507-951-7696 Jason Fitzgerald Fitzgerald Excavating fitz8477@gmail.com 651-301-5203 John Klein Hoffmann jklein@hoffcons.com 715-896-5409 Jason Ivers Hoffman jivers@hoffcons.com 715-533-2331 Shawn Hoffman Hoffman shoffman@hoffcons.com 715-896-2037 Shawn LaFaunge Hoffman slafaunge@hoffcons.com 715-896-1508 Richard Hart Warning Lites rhart@warninglitesmn.com 507-208-1335 Jon McPherson SRF Consulting jmcpherson@srfconsulting.com 763-452-4812 Dale Prestegard Olmsted County Prestegard.dale@co.olmsted.mn.us 507-328-7048 Doug Klamerus RPU Water dklamerus@rpu.org 507-280-1508 Steve Hanke CenturyLink steve.hanke@centurylink.com 507-285-3629 Dave Kemper Rochester Public Works Sanitary dkemper@rochestermn.gov 507-421-8166 Ron Muller Charter ron.muller@charter.com 507-208-1154 Brian Engen Peoples Energy Coop Bengen@peoplesrec.com 507-273-3272 Steven Cook RPU Electric scook@rpu.org 507-280-1570 K:\PW\Highway\Engineering\Projects\55TH ST\Construction\Documents\Preconstruction Agenda.docx