STEAM BATHROOM MODEL : http:// www. eaglebath.com No advanced advice will be submit before we change our design and size. The pictures may be alittle different from the real products. Our company keep the final explanation right.
TECHNIQUE PARAMETER Voltage Ac110 V(±10%) Frequency Water Volatge Power of steam generator 60HZ 0.1~0.2Mpa 2.65KW 1.2HP 1.0KW 0.2KW CAUTIONS:Heatpumpandair bubble pumpisrequiredbycustomers. CONSTRUCTION SKETCH Power of water pump Power of heatpump Power of air pump Storage capacity 66gallon Storage capacity 3 0.3m Self-clean system After the whole steamroom installation, pls. put on the power supply and cold/ hot waterswitchtocheck whetherall functions worknormally. If not, please installagain. Step 2 Step 1 Handrail Step 3 Step 4 Pour into cleaning liquid from here Glass door 01 SIZE:1500x1500 2200mm 59.0 x59.0 x86.6 Cleaningmethod: 1.Clean thesteamengine regularlyat least once byevery 2weeks orafterusing20 times. 2.Inject citric acid as maincleaningliquid,add1.5leach time.after10 minutes, turnon andwhenthe systemturns on, press button to start the steamfunctionforabout 30seconds and thenshutdown thesystem.afterventthe stagnant water,repeat2or3times. 3.CAUTION:Thesystem mustbe shut downbefore injecting 16
Packing list CONSTRUCTION SKETCH PACKING 1 Backside bodyacrylic panel column + strips; +4pcs aluminum 1 5 2 3 4 PACKING 2 PACKING 3 PACKING 4 8 PCSglass; Bottom tub, ceiling +2 pcs aluminumframe ; Control panel cap, door handle, shower, handrailbesidethe glass, soap box; drainer cap; T- pillow; wheelwith cap; towel handrail ; Self- clean system, screws. SCREW (1) M6x25 10pcs 6 7 89 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 SCREW (2) M6x35 10pcs SCREW (3) SCREW (4) SCREW (5) SCREW (6) SCREW (7) St420 x St425 x St420 x St412 x ST4x16 4pcs 4pcs 16pcs 8pcs 8pcs 25 26 27 28 29 30 31 32 33 34 1.Roof 2.Top light 3.Top shower 4.Led 5.Exhaust fan 6.Mirror 7.Control panel 8.Decotated light 11.Handrail 12.Tower bar 13.Nozzle 14.Handle 15.Left body glass 16.Skirt 17.Moveable shower 18.Elevating holder 19.Shower chain 20.Soap box 22.Right body glass 23.Black handle 24.Glass of bathtub 25.Air switch 26.Air adjuster 27.Drainage switch 28.Drainage 29.Steam outlet 30.Pillow 31.Water jets 32.Bathtub 33.Waterfall 9.Function switch 10. Hot/ Cold water switch 21.Back body 34.Water inlet 15
INSTALLATION SKETCH SIZE:1500x1500 2200mm 1250 (49.2 ) 59.0 x59.0 x86.6 ILLUSTRATION OF INSTALLATION Coldwater pipe Hot waterpipe Other screws M4x16 M4x25 The socketof power Install the screw M6x25 Active chain wheel of glass 1500 (59 ) 1.The products should be installed by technical guy with certificateorwhoareassignbydealers.themainpowerswitchand electronicleakagedeviceshouldbeinstalled. 2.The plug of electric should be installed above the steam generatorandupfromtheground59inch. 3.Thehot&cold water pipeof steam roomshould connect to house ones &the water pipesof steamgenerator should be connecting to drainagewaterpipestodraintherestwater. 4. Install the products according to the diagram of installation insuitableplace. ATTENTION 1.Inorder to avoid betripped andfelldown,paymoreattentionwhengetinto thesteamroom.pleasedon'tshutthefinger in thedoor inorder to behurt. 2.Inorder to avoid damagingthesurfaceofproductspleasedonotuse hardnessandsharpnesstooltocurvetheproducts. 3.Inorder to avoid coursefire,nosmokinginsidethebathroom. 4.thejets ofsteamanddrainagepipeboth arehightemperaturewhen products working,inorder to behurtpleasebecareful. 5.Inorder avoid to betripped andfelldownpleasekeepclearofthebathtub after takingshowereachtime. 6.Itwillbeleakingiftheglass glueplasticsheetbeoffthen pleaseadd some moreforrecover. 7.Iftherearemarks of water pleaseclear withsoftcloth andtoothpaste. 8.Inorder to beblocked of drainagedevicepleasekeepclean of thesurface ofbathtub. 9.Pleasedonothangupheavythings on thesteamroomorthehandleof steamroom. 10.Pleasedealwiththeproductsaccordingtothelocallaws whenitis no longerbeuse. ATTENTION FOR USAGE 1 check if power and cold/ hot water switch be turn on or be turn off each time before use this product. 2 check if power of electronic leakage device be get through or not. Checking way: Press testing button, light of power be off, press button of restart then light of power be on. It is not being what mentioned above after operated step by step, then that shows the electronic protection device out off control or there is something wrong with the electronic leakage device, so should ask professional to check and maintain the product. 3 Turn off the main power of control panel after stop usage. The plug of power should be pull out because only turn off all the functions of control panel that is not stop the power. 4 People with hypertension or drunk are not allowed to have sauna steam bath. 5 Children should have sauna steam bath under adultsinstruction '. 6 Please dontshut ' the finger in the door in order to be hurt when get into the steam room. 03 8 keep clean of the tray in order to be tripped and fell down. 14 room. 7 In order to be tripped and fell down, pay more attention when get into the steam
Attention: Themachinemustbefixedinthecircuitwhichprotected bycreepageprotectionandshouldbewell-connectedwiththe ground.nontechnicalpeoplecannotbefixedorremovedat random. INSTALLATION PROCESS Strip A Strip B Strip C(retaining strips 3mm width) Strip D(retaining strips 7mm width) 1. Assembly of tray If thegroundisnot smooth, please adjust thenail under the traytokeep the balanceofthe tray and ground. The steam pipe is in thebottom support of thetub, pls. kindly takeout the steam pipeatthis step. Drain 13 STEP 1 04
8-M6 25 05 STEP 2 4. Pls. move the back side steam room body to the top of the bathtub, and lock it on the bathtub per factory ready screwholes. 2. Back sidesteam room body installation. Lock the back sideglasses & back side acrylic panel togetherby screws. 3. Install the spare partson the back side steam room body. The spare partsare soapbox, shower, mirror, handrail & Towel bar. STEP 4 (1)Theelectrical pitch Press pitchcanopenthemachine,thetemperature istheroomtemperature.thetimewillshow30m.atthesame time,itwill opentheceilinglamp.press againwill closeall the functions.(after theclosureof themachine,thewatercase willdrainfor2minutes) (2)The application of thebacklamp Press,thesidelight ison.press again,theceiling lampisout, press athird press, thesidelightisout too. 3)Thesteamfunction Press,startupthesteam function, thewatercase will pump water automati-cally.after60minutesorso,it will generate steam. (When thewater caseislackofwater, thecontrollerwillreplenish automatically) (4)Theair draftfunction Underthe conditionof turnning on,press canstart up airdraftfunction, pressagain willcolseit. (5)Thesetting of timeortemperature 1. Press pitchcan adjustthetime from1-99. 2. Press pitchcanadjustthetemperaturefrom 30-60. 12
5. Pls. lock 2pcs middle aluminumcolumns & top and bottom aluminumframe togetherbyscrewsaspicture. 4-ST4 12 1 2 3 4 5 6 7 8 05 Strip A STEP 6 Strip A 8-ST4 35 STEP 5 6.Firstly, install the U shape stripson 2 sidesof fixed glass. Loose the grey glass clipfrom the aluminum frame, andinsert the left & right sidefixed glass into the glassclip, then tighten it upagain. Atthe same time, pls. insert thefixed glass intonext aluminum column. Afterthis step, also insertfixed glass into another aluminumcolumn. At the sametime, lockthe side aluminumcolumns & aluminum frametogether by screws. 1 2 3 4 Time adjustment pitch+ Temperature adjustment pitch+ CeilingLamp/Back Lamp pitch Time adjustment pitch- 5 6 7 8 Temperature adjustment pitch- Fan Pitch Steam Pitch Main Cock Pitch 7. Pls. Refer to the step 6, and install thefixed glass beside the movable door. There is glassclip on top & bottom, and nextaluminum frame. Pls. put theglass inside the glass clips. Pls. insert strips intothe aluminum column later than insert thefixed glass. STEP 7 Strip D 11 06
ELECTRIC CIRCUIT SKETCH clean system Strip C Strip B STEP 8 8. Install the wheels on movable doorup & down part, magnetic strip on closed side of the 2 doors. After this, put movable dooronaluminum rail. Adjust the gapbetween the doors & rail, pls. also remember to install thestrip on another sideofthe movable doors. steam outlet water inlet Power 8-ST4 25 9. After finish thefront glass door installation, pls. carry thiswhole front glassdoor to the surfaceof the bathtub.( At least require 2 people to carry this part Lock the aluminumpoles from frontside glass & back side wall together as picture. Then these 2 big steamroom bodylock together. Control panel 07 STEP 9 Light ( AC12 V) Fan ( DC12 V) 10
DRAWING OF WATER CONNECTION As the from thepicture,pleasemakethe connectionaccordingtotheserialnumberv1,v2,etc. Moveable shower Top shower Function shift switch Hot/ Cold water switch 10. Pls. put the ceilingon the top, and lockthe ceiling on the steam room bodybyready screw holes. 9-M6 25 5-ST4 16 Waterfall Nozzle Steam generator STEP 10 TROUBLESHOOTING Nozzle 11. Connect the cold / hot water pipetohouse corresponding water pipe andconnect the power cabletohouse power socket.( Cold water pipe is withblue color mark & hot water pipe is with red color mark ) 12. Pls. putglass glue on contact surfacebetween the steam room body & bathtub, ceiling & connection place between theacrylic panel & backside glass. Later, install themovable door handle. 09 STEP 11 WS-701 08