OVERALL LANDSCAPE PLAN

Similar documents
Section 815. LANDSCAPING

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

2-B-18-UR. Revised: 3/27/2018

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

Planting Landscape Trees

SECTION TREES, SHRUBS AND GROUNDCOVERS

Success with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION 605 PLANTING

Selection and Care of Trees and Shrubs. Ray Ridlen Oklahoma County OSU Extension Educator

Home Depot Page 1 of Humacao, Puerto Rico 03/19/10

VICINITY MAP 1" = 1000'

DIVISION II PLANTING SECTION 02950

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

EXTERIOR PLANTS

Planting Landscape Trees

DISCOUNT TIRE - IAD 10739


Planting Trees & Shrubs. Choosing Trees and Shrubs. Tree Quotes

Guelph Humane Society Section PLANTING Page 1

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

Planting Trees & Shrubs. and Shrubs Study Guide

a. Section Irrigation b. Section Operation and Maintenance of Planting c. Section xx xx xx Trees

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball:

Root-bound potted tree after pot removal

PLANT LIST (CONTRACTOR RESPONSIBLE FOR ALL PLANTS SHOWN ON PLAN) SHRUBS PERENNIALS/ORNAMENTAL GRASSES

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

ACTIVITY: Trees, Shrubs and Vines ES 10

SECTION LANDSCAPE

SECTION TREE TRANSPLANTING


DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

Dan, this is a list of the items included in the submittal package for the Plan Commission Public Hearing on May 24, 2018:

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014

Guideline SpeciVications for Selecting, Planting, and Early Care of Young Trees

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

Guidelines for planting within the 100 Ft. Buffer

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

Planting Containerized Trees

Cooperative Extension

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

SIUE LANDSCAPE UPGRADE

Types of Planting: Balled and Burlapped

CITY OF VISALIA. Parks & Urban Forestry Guidelines. Street Tree Standards For Residential And Commercal Development

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

PREPARING THE PLANTING HOLE

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging.

Applicant Submittal HWANG HOSPITALITY, LLC ARCHITECTS OVERLAND PARK, KANSAS 6470 W. 151ST STREET FIRST FLOOR PLAN A NEW MULTIFAMILY DEVELOPMENT FOR:

HALIFAX REGIONAL MUNICIPALITY

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.

Landscape Restoration Specifications

ANEW LANDSCAPE really

Selecting Quality Trees from the Nursery. Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida)

City of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS

HG Homeowner Landscape Series: Planting Problems of Trees and Shrubs

WMU Tree Care Plan and Policies

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

Punch-list Item Punch-list Photo Remedy for Signoff. Burlap and Wire Basket Visible (top 2/3 must be removed)

City of Gering Tree Rebate Program

A. Surface parking areas shall be constructed of bituminous paving.

Town of Fuquay-Varina


Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program

L0.1 E BROADWAY TREE MANAGEMENT LEGEND. TREE MANAGEMENT PLAN Scale: 1:100. Vancouver, BC September 2018

Unit 4 Landscape Installation

Part 1: Exterior Landscape Installation

Illinois Chapter ISA Certification Workshop

Planting a Tree or Shrub

SECTION LANDSCAPING

LAUREL STREET WATER TANK - LANDSCAPE RFP SECTION SECTION LANDSCAPING PLANTS

Don t Put a $100 Tree in a $10 Hole

B. Finish Grade: Elevation of finished surface of planting soil.

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

ISSUANCES FINAL 4.1 SITE PLAN SUBMISSION

Construction Specification for Planting

CMG GardenNotes #633 The Science of Planting Trees

OVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216.

BID PACKET 2015 DOWNTOWN ENHANCEMENT PROGRAM

Arboretum Tree Planting Specification

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009

F. Finish Grade: Elevation of finished surface of topsoil.

Xeriscape Rebate Program Manual

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805)

NURSERY FACILITY CONTENTS


Wise Watering Practices: Trees and Shrubs

SECTION TREES, PLANTS AND GROUNDCOVER. A. Preparation of subsoil, topsoil and planting soil mixture.

University of New Hampshire Scholars' Repository

TREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service

Planting and Establishment

PLANTING PRACTICES THAT GROW SUCCESS. Erik Draper, Commercial Horticulture Educator Ohio State University Extension- Geauga County

Extension SERVICE. Recommended Trees for Southeast Minnesota (FO-6S74) Recommended Trees for Southwest Minnesota (FO-6S7S)

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING

Transcription:

OVERALL LANDSCAPE PLAN : LIC. NO: SM RECORD COPY BY: L.0 OVERALL LANDSCAPE PLAN Scale: " = 40'-0" 0 40' 80' Scale: " = 40' L.0

L2.0 TREE PLANTING PLAN Scale: " = 40'-0" 0 Scale: " = 40' 40' wsbeng.com 80' L2.0 TREE PLANTING PLAN : LIC. NO: PROJECT NO: DESIGN BY: RECORD COPY BY: CHECKED BY: SM PLAN BY:

SEE LANDSCAPE ENLARGEMENT PLAN 'B' LANDSCAPE ENLARGEMENT PLAN 'A' : LIC. NO: SM RECORD COPY BY: L3.0 LANDSCAPE ENLARGEMENT PLAN 'A' Scale: " = 0'-0" SEE LANDSCAPE ENLARGEMENT PLAN 'C' 0 0' 20' Scale: " = 0' L3.0

LANDSCAPE ENLARGEMENT PLAN 'B' : LIC. NO: SM RECORD COPY BY: L4.0 LANDSCAPE ENLARGEMENT PLAN 'B' Scale: " = 0'-0" SEE LANDSCAPE ENLARGEMENT PLAN 'D' 0 0' 20' Scale: " = 0' L4.0 SEE LANDSCAPE ENLARGEMENT PLAN 'A' SEE LANDSCAPE ENLARGEMENT PLAN 'F2'

SEE LANDSCAPE ENLARGEMENT PLAN 'D' LANDSCAPE ENLARGEMENT PLAN 'C' : LIC. NO: SM RECORD COPY BY: L5.0 LANDSCAPE ENLARGEMENT PLAN 'C' Scale: " = 0'-0" SEE LANDSCAPE ENLARGEMENT PLAN 'A' SEE LANDSCAPE ENLARGEMENT PLAN 'E' 0 0' 20' Scale: " = 0' L5.0

LANDSCAPE ENLARGEMENT PLAN 'D' : LIC. NO: SM RECORD COPY BY: L6.0 LANDSCAPE ENLARGEMENT PLAN 'D' Scale: " = 0'-0" SEE LANDSCAPE ENLARGEMENT PLAN 'B' 0 0' 20' Scale: " = 0' L6.0 SEE LANDSCAPE ENLARGEMENT PLAN 'C'

LANDSCAPE ENLARGEMENT PLAN 'E' : LIC. NO: SM RECORD COPY BY: L7.0 LANDSCAPE ENLARGEMENT PLAN 'E' Scale: " = 0'-0" SEE LANDSCAPE ENLARGEMENT PLAN 'C' SEE LANDSCAPE ENLARGEMENT PLAN 'F' 0 0' 20' Scale: " = 0' L7.0

LANDSCAPE ENLARGEMENT PLAN 'F' : LIC. NO: SM RECORD COPY BY: L8.0 LANDSCAPE ENLARGEMENT PLAN 'F' Scale: " = 0'-0" 2 L8.0 LANDSCAPE ENLARGEMENT PLAN F Scale: " = 0'-0" SEE LANDSCAPE ENLARGEMENT PLAN 'C' 0 0' 20' Scale: " = 0' 0 0' 20' Scale: " = 0' L8.0 SEE LANDSCAPE ENLARGEMENT PLAN 'B'

LANDSCAPE SCHEDULE : LIC. NO: SM RECORD COPY BY: Landscape Notes:. MINIMUM NUMBER OF OVERSTORY TREES: SITE PERIMETER: 2300' / 40 = 58 TREES REQUIRED OVERSTORY TREES PROPOSED: 63 (INCL. DBL. CREDIT FOR 6" MM TREES) 2. TREE PRESERVATION NOTE: EXISTING SITE TREES: 0 TOTAL CALIPER INCHES TO BE PRESERVED: 0 TOTAL CALIPER INCHES TO BE REMOVED: 0 3. ALL LANDSCAPE AND TURF AREAS TO BE IRRIGATED. CONTRACTOR TO SUBMIT SHOP DRAWING FOR PROPOSED IRRIGATION SYSTEM TO OWNER / LA / CITY FOR FINAL APPROVAL RPIOR TO INSTALLATION. 4. IMPERVIOUS CALCULATIONS: TOTAL LOT AREA: 202,032 SF (4.638 AC) BUILDING: 5,227 SF (.76 AC) SIDEWALKS AND TRAILS: 2,327 SF (0.283 AC) PARKING: 38,558 SF (0.885 AC) TOTAL IMPERVIOUS: 02,2 SF (2.344 AC) 50.5% TOTAL PERVIOUS: 99,920 SF (2.294 AC) 49.5% L9.0

DECIDUOUS TREE PLANTING DETAIL NTS Planting Notes:. ALL PLANTING BEDS SHALL BE PREPARED IN THE FOLLOWING MANNER: - REMOVE EXISTING VEGETATION, ESPECIALLY GROUNDCOVER - ROTOTILL TO A DEPTH OF 2 INCHES AND INCORPORATE FERTILIZER - TRENCH THE EDGE OF THE PLANTING BEDS - INSTALL EDGING WHERE APPLICABLE - REMOVE ALL ROCKS AND DEBRIS - INSTALL PLANTS AS PER PLANTING DETAIL - INSTALL DOUBLE SHREDDED HARDWOOD MULCH TO 4" DEPTH - WOOD MULCH SHALL BE PULLED AWAY FROM STEMS/TRUNKS OF ALL PLANTS. - WATER AS PER DETAILS 2. CONTRACTOR SHALL NOT PLANT TREES OR SHRUBS IN PLANTING PITS WHERE HIGH WATER OR OTHER UNFORESEEN CIRCUMSTANCES ARE ENCOUNTERED. CONTRACTOR SHALL NOTIFY OWNER/LANDSCAPE ARCHITECT IMMEDIATELY IN SUCH INSTANCES. 3. ALL PLANT MATERIALS SHALL BE TRUE TO THEIR SCIENTIFIC NAME AND SIZE AS INDICATED IN THE PLANT SCHEDULE. 4. OWNER RESERVES THE RIGHT TO REVISE QUANTITIES TO SUIT BUDGET LIMITATIONS. CONTRACTOR'S UNIT BID PRICES SHALL PREVAIL FOR ANY CHANGES IN QUANTITIES. 5. CONTRACTOR SHALL FIELD STAKE PLANTING ACCORDING TO PLAN. OWNER / LANDSCAPE ARCHITECT SHALL APPROVE ALL PLANT LOCATIONS PRIOR TO INSTALLATION. OWNER RESERVES THE RIGHT TO REVISE PLANTING LAYOUT AT TIME OF INSTALLATION. 6. ALL LANDSCAPED AREAS TO BE IRRIGATED. IRRIGATION SYSTEM(S) SHALL BE EQUIPPED WITH RAIN SENSORS TO PREVENT UNNECESSARY WATERING. BALLED AND BURLAPPED STOCK: ROOTS OF ALL BALLED AND BURLAPPED STOCK SHALL FILL THE SOIL BALL, BE FREE OF KINKS, CIRCLING AND GIRDLING, AND THE UPPERMOST ROOTS SHALL NOT BE MORE THAN FOUR INCHES BELOW THE TOP OF THE SOIL BALL. TRANSPORT ROOTS SHALL BE SYMMETRICAL AROUND THE TRUNK / STEM OF THE PLANTS. SOIL BALLS MUST BE CENTERED OR NO MORE THAN 0% OFF CENTER. DIG THE PLANTING PIT TWO TO THREE TIMES WIDER THAN THE SIZE OF THE ROOTBALL AND AT THE SAME DEPTH AT WHICH THEY GREW IN THE NURSERY. SCARIFY THE SIDES AND BOTTOM OF THE PLANTING PIT. PLACE PLANT IN PLANTING PIT AND SET PLANTS VERTICAL. WHEN MOVING PLANTS, LIFT FROM BENEATH THE ROOT BALL, DO NOT LIFT BY THE TRUNK AND DO NOT BREAK OR LOOSEN THE ROOTBALL. SET PLANTS ON SOLID, UNDISTURBED SOIL, OR THOROUGHLY COMPACTED BACKFILL SOIL SO THE TOP OF THE ROOTBALL IS SLIGHTLY ABOVE FINISHED GRADE TO EXPOSE ROOTFLAIRS ON ALL B&B TREES TO PREVENT "STEM GIRDLING". CUT AND REMOVE ALL TWINE AROUND THE TRUNK. PULL BURLAP AWAY FROM TRUNK SO THAT NO BURLAP REMAINS IN THE TOP THREE INCHES OF THE SOIL SURFACE. REMAINING BURLAP SHALL BE SLIT AT SIX INCH INTERVALS AROUND THE CIRCUMFERENCE OF THE ROOTBALL. BACKFILL PLANTING PIT WITH ORIGINAL SOIL HALFWAY TO THE TOP OF THE ROOTBALL. BREAK UP CLODS OF SOIL. IF SOILS ARE POOR (I.E. HEAVY CLAYS, SAND, OR COMPACTED), BACKFILL CAN BE A MIXTURE OF /3 SOIL AMENDMENT MIXED WITH 2/3 ORIGINAL SOIL. DO NO USE PEAT AS PART OF BACKFILL IN CLAY SOILS. REMOVE ALL ROCKS AND DEBRIS FROM BACKFILL AND THEN WATER PLANT AND BACKFILLED AREA TO SETTLE PLANTS AND FILL VOIDS. REMOVE ALL WIRE BASKETS FROM THE TOP /2 OF THE ROOTBALL AND CONTINUE BACKFILLING REMAINING PLANTING PIT WITH ORIGINAL SOIL. WATER THOROUGHLY A SECOND TIME TO SETTLE PLANTS AND FILL VOIDS WITHIN TWO HOURS OF PLANTING. PLACE SPECIFIED MULCH WITHIN 48 HOURS OF THE SECOND WATERING. PROVIDE SUPPORT IF NECESSARY. CONTAINER STOCK: DIG THE PLANTING HOLE TWO TO THREE TIMES WIDER THAN THE SIZE OF THE CONTAINER, OR TO THE EDGE OF THE PLANTING BED AS INDICATED ON THE PLANS, AND AT THE SAME DEPTH AT WHICH THEY GREW IN THE NURSERY. FOR ADDITIONAL PLANTING BED PREPARATION, SEE PLANTING NOTES. REMOVE CONTAINER (BY CUTTING IF NECESSARY). IF ROOTS ARE GROWING IN A SPIRAL AROUND THE SOIL MASS, USE A SHARP KNIFE TO SCORE THE OUTSIDE OF SOIL MASS VERTICALLY, JUST DEEP ENOUGH TO CUT THE NET OF THE ROOTS, AND MAKE A CRISS-CROSS CUT ACROSS THE BOTTOM OF THE SOIL MASS. SET PLANT ON SOLID UNDISTURBED SOIL OR THOROUGHLY COMPACTED BACKFILL SOIL SO THE TOP OF THE SOIL IS AT FINISHED GRADE OR SLIGHTLY ABOVE, NOT TO EXCEED TWO INCHES. BACKFILL PLANTING BED WITH ORIGINAL SOIL. BREAK UP CLODS OF SOIL. IF SOILS ARE POOR (IE: HEAVY CLAYS, SAND, OR COMPACTED), BACKFILL CAN BE A MIXTURE OF /3 SOIL AMENDMENT WITH 2/3 ORIGINAL SOIL. DO NOT USE PEAT AS PART OF BACKFILL IN CLAY SOILS. REMOVE ALL ROCKS AND DEBRIS FROM BACKFILL. SM RECORD COPY BY: : LIC. NO: THOROUGHLY WATER TO SETTLE THE PLANTS AND FILL VOIDS WITHIN TWO HOURS OF PLANTING. INSTALL MULCH WITHIN 48 HOURS OF WATERING. SPRING TO MID-SUMMER PLANTING: FERTILIZE AT THE TIME OF PLANTING WITH A SLOW-RELEASE, BALANCED FERTILIZER. USE ACCORDING TO MANUFACTURER'S INSTRUCTIONS. MIX FERTILIZER IN WITH BACKFILL OR BROADCAST IN A DIAMETER AROUND THE PLANT. LATE SUMMER TO FALL PLANTINGS: USE A FERTILIZER WITHOUT NITROGEN FOR DECIDUOUS TREES. DO NOT APPLY ANY FERTILIZER TO EVERGREEN TREES AND SHRUBS PLANTED IN LATE SUMMER OR EARLY FALL. SHREDDED WOOD MULCH: SHREDDED WOOD MULCH SHALL BE INSTALLED AT A 4" COMPACTED DEPTH PLACED TO THE EDGE OF THE PLANTING BED. PLANTS NOT IN A PLANTING BED SHALL HAVE A 4' DIA. MULCHED AREA. MULCH SHALL BE PULLED AWAY FROM DIRECT CONTACT WITH THE TREE TRUNK OR PLANT STEM. MULCHED AREA SHALL FORM A WELL AROUND PLANTS OR PLANTING BEDS. LANDSCAPE NOTES AND DETAILS 2 CONIFEROUS TREE PLANTING DETAIL NTS wsbeng.com L0.0