INSTY-PAC INTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

Similar documents
INSTY-PAC EXTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

INSTY-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY

CUFFED FAST-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY

Insty-Pac Steam Humidifiers

ES Series Electric Humidifier

Installation Instructions. Operation and Maintenance Manual

DRI-STEEM STEAM INJECTION HUMIDIFIERS

Installation Instructions. Operation and Maintenance Manual

Ultra-sorb Model XV. Installation, Operation, and Maintenance Manual. Steam Dispersion Panel. For pressurized steam applications

Installation Instructions. Operation and Maintenance Manual

"ER" Series Electric Humidifier

"ESDDR" Series Electric Humidifier

"SXDDR" Series Steam Heat Exchanger Humidifiers

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

CELDEK Evaporative Cooler Module Installation, Operation, and Maintenance Manual. CELDEK Evaporative Cooler

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Ultra-sorb Models LV and LH

ULTRA-SORB STEAM DISPERSION TUBE HUMIDIFIER PANEL

Steam Humidifier Fan Pack Installation & Maintenance Instructions

Steam Injection Humidifiers for use with steam boilers PR0DUCT CATALOG

Steam Injection Pressurized Steam Humidifiers. Installation, Operation, and Maintenance Manual

Steam Injection Pressurized Steam Humidifiers. Installation, Operation, and Maintenance Manual

ULTRA-SORB. Installation, Operation, and Maintenance Manual MODEL. Steam Dispersion Panel. For pressurized steam applications

Steam Injection Humidifiers for use with steam boilers. Installation, Operation, and Maintenance Manual

Steam Injection Humidifiers for use with steam boilers PRODUCT CATALOG

HumidiPack,HumidiPackPlus and HumidiPackPlus CF Steam Humidifier Systems

Safety, Installation, and Operation Manual

SPECIFICATION DIVISION 23 SECTION DESCRIPTION DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION STEAM HUMIDIFIERS

Ultra-sorb Steam Dispersion Tube Humidifier Panel

Steam Injection. Humidification system

Armstrong ExpressPack Multi-Tube Steam Dispersion Panel Assembly and Installation Instructions

.4 Section Ductwork Low Pressure Metallic to 500 Pa..3 ANSI/ARI 640 Commercial and Industrial Humidifiers.

ULTRA-SORB. Installation, Operation, and Maintenance Manual MODEL. Steam Dispersion Panels

Steam Distribution. Installation Manual. Includes installation instructions for steam distributions ASD/BSD/CSD/RSD/SSD.

STEAM DISTRIBUTORS ASD / BSD / CSD. Installation Manual C

DBF 4XL Dryer Booster Fans

Installation and Maintenance

Installation and Operation

ICS Float and Thermostatic Steam Trap Installation and Operation Manual

AIC Series Float & Thermostatic Steam Trap Installation and Maintenance Instructions

Installation and Maintenance Manual IM Single Duct VAV Terminals. Group: Controls Part Number: IM 1093 Date: February 2015

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

SH-2000, SH-2500, AB-3000 Bimetallic Steam Traps Installation and Operation Manual SH-2000

The SKD direct steam injection system uses low pressure steam from an in-house boiler to humidify the air.

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

DRI-STEEM CRU SERIES ELECTRIC STEAM HUMIDIFIERS

Niles Steel Tank Hot Water Generator Installation and Operation Manual

Operation & Maintenance Manual

EBAC MODEL CD30 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

SECTION AIR HANDLING UNITS WITH COILS. 1. Central Station Air Handling Units. 1. Section Basic Mechanical Requirements.

PRESSURE FOG HIGH ATOMIZING HUMIDIFICATION SYSTEM

1.3 REFERENCES A. ANSI/NFPA 70 - National Electrical Code. B. ARI Commercial and Industrial Humidifiers.

SOLARHOT. SuperVox. Description / Applications System Overview. Installation/ Owner s Manual

Installation and Testing of Inverted Bucket Steam Traps Manual

PAC, NQAC, HQAC, SQAC, EQAC AIR-COOLED CONDENSERS OPERATING AND INSTALLATION INSTRUCTIONS

Installation, Operation, Maintenance, Spare Parts, and Exploded Views Guide

VIFB Coil Technical Guide

Installation and Maintenance Manual IM 1102

Ultra-sorb Steam Dispersion Panels

Installation Instructions. Operation and Maintenance Manual

SH-300, SH-900, SH-1500, SH-1600 and SH-1700 Bimetallic Steam Trap Installation and Operation Manual

Installation & Operation Manual

SAM-e - Short Absorption Manifold Submittal Drawings

Operation Maintenance. Mobile Oil Caddy

INSTALLATION AND MAINTENANCE INSTRUCTIONS FOR ROOFTOP UNITS

FLOW-THROUGH FURNACE HUMIDIFIER

GRF-SERIES REFRIGERATION TYPE NON CYCLING STANDARD

CS90H INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Volterra. Owner s Manual WARNING WARNING WARNING FOR OUTDOOR USE ONLY CAUTION: OUTDOOR FIREPIT TABLE

EBAC MODEL KOMPACT INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

XT Series Electrode Steam Humidifier. Installation, Operation, and Maintenance Manual

DOUBLE INTERLOCK, PREACTION SYSTEM WITH ELECTRIC/PNEUMATIC RELEASE

CD85 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Daikin Water Cooling, Heating, and High Capacity Booster Coils

EBAC MODEL CD60 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Installation & Operation Manual

Installation and Maintenance "L" and "LS" Series

M Series Fan Filter Units

SEISCO SUPERCHARGER EXTENDER/BOOSTER INSTALLATION GUIDE & OWNERS MANUAL

SINGLE INTERLOCK, SUPERVISED PREACTION SYSTEM WITH ELECTRIC RELEASE

INSTRUCTION MANUAL HS-229G

INSTALLATION and OPERATION MANUAL DIRECT STEAM KETTLES MOUNTED ON ELECTRIC BOILER BASE CABINET MODELS: EMT-6 EMT-10 EMT-12 EMT-6-6 EMT-10-6 EMT-10-10

MODEL CDB8 INSTALLATION INSTRUCTIONS

Alnor AirGard 410HE Air Flow Monitor for Hazardous Environment Fume Hoods

EBAC MODEL NEPTUNE INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

SECTION AIR DUCT ACCESSORIES

INFRARED RADIANT HEATERS

ComfortSTEAM TM. Humidification System

VIFB Coil Technical Guide

EBAC MODEL BD-150 ( ) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

SINGLE INTERLOCK, SUPERVISED PREACTION SYSTEM WITH WET PILOT ACTUATION

TITAN FLOW CONTROL, INC.

Residential Duct Mount Builder s Box Media Air Cleaner

GASGUARD VENT LINE3. Ammonia Sensor OPERATING & INSTALLATION MANUAL

THE THERMOSTATIC STEAM TRAP

INSTALLATION INSTRUCTIONS & USE & CARE GUIDE 06E Series Model 06E Series Model RANGE HOOD LOCATION 1. The range hood must be installed just above the

EasiHeat Mechanical Installation and Commissioning Instructions


Installation Instructions

WKS 4000 SERIES (USA only) --INSTALLATION INSTRUCTIONS--

Transcription:

Read and Save These Instructions Sheet No. LSIP-IM INSTY-PAC INTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY INSTALLATION AND ASSEMBLY INSTRUCTIONS Fig. 1 Strainer Secure to AHU/duct casing with 3/8-16 UNC bolts Tube support AHU/duct Injection tube Typ. centers Control valve AHU/duct height Duct plate Stainless steel tube header Steam trap AHU/duct width Secure end bracket to AHU/duct casing with 3/8-16 UNC bolts INSTALLATION 1. Install the assembly so that the injection tubes are level within the duct or AHU. 2. Install tube with orifices injecting steam up. 3. Insty-Pac condensate steam traps must drain by gravity to an open drain (condensate cannot be elevated). 4. Each condensate connection must have it s own steam trap. Condensate connections cannot be combined together to a common steam trap. 5. A common condensate drain line can be used after the individual steam traps. 08/08

Introduction Table of Contents Introduction 1 Non-Wetting Distance Charts 2 Mounting Instructions 3 Component Identification 4 Header & Bracket Support Detail 5 Installation Tips/Controls 6 Troubleshooting 7 Maintenance 8 To the user of PURE Humidifier Co. s Electric Humidifiers We at PURE Humidifier Co. thank you for choosing one of our quality products. PURE Humidifier Co. humidifiers are simple to install, operate, and maintain. However, they must be maintained to provide maximum operating efficiency. PLEASE READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY. PROPER OPERATION AND HUMIDITY CONTROL IS POSSIBLE ONLY WITH PROPER INSTALLATION AND MAINTENANCE. To ensure proper installation of this product, it must be installed by qualified HVAC and electrical contractors, and must be in compliance with local, state, federal, and governing codes. If installed improperly this product may cause damage to property, severe personal injury, or death as a result of electric shock, burns, and/or fire. High chloride content in boiler steam condensate carryover can cause chloride stress cracking and chloride pitting in stainless components. Chloride stress corrosion cracking (CSCC) and chloride pitting of stainless steel components is not covered by warranty. Do not use hydrochloric acid descalers or bleach to clean the tank. Consult the factory if you are unsure about which chemical descaler to use. The PURE Humidifier Co. Warranty PURE Humidifier Co. guarantees its products to be free from defects in material and workmanship for a period of two years from the date of shipment; provided the product is properly installed, serviced, and put into the service for which it was intended. PURE Humidifier Co. is obligated under the terms of this warranty to the repair or replacement of the defective part(s), excluding any labor charges, or to refund the purchase price at our option. PURE Humidifier Co. assumes no obligation for incidental or consequential damages. The above provisions are in lieu of all other guarantees, obligations, liabilities or warranties, expressed or implied.

Non-Wetting Distance With a Insty-Pac Tube Assembly Having 3 Centers Relative Humidity Leaving 90% 30 15 13 11 8 7 5.5 2 1 85% 15 11 10 9 7 5 4 1 80% 10 8 7 6 5 3 2 70% 8 6 5 4 3 1" 60% 6 4 3.5 2.5 0.75 50% 4 3 2 0.75 40% 2 1.5 0.5 30% 1 0.5 20% 0.25 10% 20% 30% 40% 50% 60% 70% 80% 85% Relative Humidity Entering Non-Wetting Distance With a Insty-Pac Tube Assembly Having 6 Centers Relative Humidity Leaving 90% 60 30 27 24 20 16 14 13 9 85% 50 24 21 17 13 12 10 8 80% 40 19 15 13 9 8 7 70% 30 15 11 9 6 4 60% 15 11 8 5 3 50% 9 8 4 2 40% 5 4 1 30% 2.5 1 20% 0.5 10% 20% 30% 40% 50% 60% 70% 80% 85% Relative Humidity Entering The above is based on air conditions of 55 F duct temperature at a velocity of 500 feet per minute. Dissipation distance may vary depending on airflow and temperature characteristics. Air Pressure Loss in Inches of Water Column Air Velocity 3 Tube Spacing 6 Tube Spacing 500 fpm.025.015 750 fpm.060.020 1000 fpm.085.030 1250 fpm.130.043 1500 fpm.180.055 Note: Tube spacing greater than 6 has no measureable air pressure loss. 2

Insty-Pac Injection Tube Assembly Internal Mounting Instructions The Insty-Pac tube assembly supplied is designed for rapid dissipation of steam. The tube assembly is designed for internal AHU or duct mounting. Verify Components Unpack the components from the shipping container. Verify all components are checked off according to the packing list and the COMPONENTS IDENTIFICATION DRAWING (Fig. 2). Report any missing pieces to your local PURE Humidifier Co. representative immediately. Location 1. Mount the injection tube assembly in the AHU or duct work as shown on the project plans or as indicated by the engineer. 2. Install the injection tube with the 3/4 -NPT drain connection, located on the tube header, directed towards the bottom of the AHU or duct. 3. Install the tube assembly so that the injection tubes are level within the AHU or duct. 4. Install the tube assembly with the steam discharge ports facing upwards. 5. The tube assembly should be centered in the AHU or duct height with an even distance between the bottom tube and the casing floor and the top tube and the casing ceiling. Mounting 1. Layout the center lines for the injection tube SUPPLY and CONDENSATE connections. The supply connections outside diameter may vary, the condensate connection is a 1-1/16 outside diameter. Duct plates are provided to seal the opening. The layout should be based on the Location instructions listed above (see Fig. 3). 2. Cut a hole through the AHU or duct wall for the supply connection. If the alternate horizontal condensate drain connection is supplied, cut a 1-1/16 diameter hole through the AHU or duct wall, for the drain connection (see Fig. 3). 3. Install the tube HEADER onto the inside of the AHU or duct wall with the steam supply connection installed through the access hole (cut in step above). Secure the header to the AHU or duct wall with 3/8-16 fasteners (by others). The HEADER is provided with header mounting brackets welded onto the header (see Fig. 2) 4. Secure the END BRACKET to the AHU or duct wall with 3/8-16 fasteners (by others). The END BRACKET must be located so that tubes are level (see FIG. 3). 5. Seal the openings where the STEAM SUPPLY and CONDENSATE connections penetrate through the AHU or duct wall with the duct plates provided (see Fig. 3). 6. Supply piping, valve and strainer require independent support (by others in field). 7. Control valve, traps and strainer are shipped loose for field installation (by others). All condensate and supply piping is by others. NOTE: For tube assemblies over 48 (122 cm) in length, allow for 1/2 (1.3 cm) of linear expansion of tubes. Not allowing for this expansion could cause system performance issues or cracking of welds. 3

Internal Mount Insty-Pac Tube Assembly Component Identification ITEM NO. DESCRIPTION QUANTITY 1 Supply/condensate header 1 2 Injection tubes varies with order 3 Tube mounting bolts 1 per tube 4 Duct plate (supply) 1 per supply inlet 5 Duct plate (condensate) 1 6 Tube support bracket 1 Fig. 2 2 1 6 Header mounting bracket (welded onto the header) NPT Valve connection 4 3 5 Tube drain connection (3/4 -NPT) Header drain connection (3/4 -NPT) Alternate drain connection (if ordered, it will need to penetrate through the unit casing or duct wall) 4

Header & Support Bracket Mounting Detail Supply/ condensate header Header mounting bracket (welded to header) AHU casing or duct wall Injection tube End Bracket NPT valve connection Cut openings for steam inlet stub-out. Seal with duct plate. End bracket mounting bolts Mount tubes level within the duct or AHU 3/4 NPT condensate drain connection (hidden line is the alternate location - special order) Fig. 3 Notes: 1. Center the multiple injection tube assembly in the duct height. 2. The injection tubes should be mounted level within the duct or AHU. 3. Install injection tubes with the orifices injecting upwards. 4. All condensate drain piping is by others. 5. Condensate must drain by gravity to an open drain. Condensate cannot be elevated. 6. Each condensate connection must have it s own steam trap. Condensate connections cannot be combined together to a common steam trap. 7. A common condensate drain line can be used after the individual steam traps. 5

Installation Tips Condensate Return Line Condensate from the header or tubes cannot be elevated. Do not connect steam traps to pressurized condensate return lines. If gravity drain is not possible please use a condensate pump rated for 212 F water or PURE Humidifier Company Part No. 16033 Hartell A3X-115 condensate pump. Laminar air flow Tube assembly must be installed in a location that allows for laminar air flow across entire grid. A minimum velocity of 300 feet per minute is required to avoid saturation and excessive fog travel. Plug fan installations Install tube assembly as close as possible to the upstream coil to ensure laminar airflow and proper absorption. Insulated ducts Internally insulated ducts must be lined with a non-absorbent material to avoid saturation. If the duct is lined it must be removed three feet (3 ) upstream and ten feet (10 ) downstream of tube assembly. Final Filters Tube assembly must be installed a minimum of ten feet (10 ) upstream of final filters. VAV Systems Low velocity will cause long fog trails and steam will rise wetting the top of the AHU/duct casing. Modulating VAV high-limit humidistat is required. A minimum velocity of 300 feet per minute is required to avoid saturation and excessive fog travel. Controls Fan Interlock Switch PURE Humidifier Co. recommends the use of an air flow proving switch or fan interlock to prove air flow prior to humidifier cooperation. Humidifier operation without air flow will result in over-saturation of the air stream. Air flow proving switches are available as optional equipment from your PURE Humidifier Co. representative. High-Limit Humidistat PURE Humidifier Co. recommends the use of a duct high-limit humidistat to prevent humidifier operation when the duct humidity level exceeds 85% relative humidity. Humidifier operation above 85% relative humidity can result in over-saturation of the air stream. Highlimit humidistats are available as optional equipment from your PURE Humidifier Co. representative. The high limit humidistat should be 12 to 14 feet (365-427 cm) downstream from the humidifier injection tube. Smoke Alarms and Temperature Sensors Smoke alarms should be located 12 to 14 feet (365-427 cm) upstream from the humidifier injection tube. Temperature sensors should be located 12 to 14 feet (365-427 cm) downstream from the humidifier injection tube, or past any visible fog travel that may be greater than this distance. 6

Troubleshooting Too Much Humidity 1. Humidity controller out of calibration. 2. Valve stem sticking. 3. Valve spring broken. 4. Foreign matter preventing valve from closing. Too Little Humidity 1. Strainer screen plugged. 2. Stop valve not fully open. 3. Humidity controller out of calibration. 4. Inadequate steam pressure. 5. Undersized humidifier. 6. Automatic control valve not opening fully. A) Pneumatic valve operator leaking air. B) Valve stem sticking. Humidifier Discharges Water 1. Faulty drainage: A) Return line pressure greater than humidifier pressure. B) Return line flooded. C) Dirty steam trap. D) Vertical lift. E) Wrong type steam trap, float type must be used. F) Tube assembly not level. 2. Faulty steam supply: A) Humidifier supply not taken from top of main. B) Long, un-trapped supply line. C) Steam main flooded due to priming boiler. 7

Maintenance 1. Header No maintenance required. 2. Injection Tube No maintenance required. 3. Valve - Pneumatic Should be inspected annually to be sure that a) the diaphragm in the actuator is not leaking air, b) the valve closes off tightly, c) the stem packing is not leaking steam. Valve - Electric Should be inspected annually to confirm that the stem packing is not leaking and that the valve closes tightly. Valve-Solenoid Requires no maintenance. 4. Strainer Clean screen a few days after humidifier is put in operation and annually thereafter. 5. Steam Trap - Inspect annually 8

9

10

141 Jonathan Blvd. North Chaska, MN 55318 Tel: (952) 368-9335 Fax: (952) 368-9338 www.purehumidifier.com 11